MAD-US 42/SR 38-05.92/13.88
MAD County · est $1.7M
Bid dateThursday, January 25—
MAD County · est $1.7M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 6.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 33 more items below.
| Item | Quantity | R1Shelly Company | R2Shelly & Sands INC | R3Darby Creek Excavating INC | R4A & B Asphalt Corporation | R5Kokosing Construction Company INC | % of bid |
|---|---|---|---|---|---|---|---|
| 441E10000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG | 7,351 CY | $130 | $120 | $140 | $128 | $150 | 60% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 171,005.8 SY | $0.98 | $1.85 | $1.00 | $1.50 | $1.50 | 11% |
| 251E01040 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 2,617 SY | $27.00 | $14.00 | $27.00 | $43.25 | $28.00 | 4% |
| 614E11000 |
| Item | Quantity | R1Shelly Company | R2Shelly & Sands INC | R3Darby Creek Excavating INC | R4A & B Asphalt Corporation | R5Kokosing Construction Company INC |
|---|---|---|---|---|---|---|
| 202E38001 GUARDRAIL REMOVED, AS PER PLAN | 975 FT | $1.60 | $1.70 | $1.76 | $1.60 | $1.60 |
| 202E42001 ANCHOR ASSEMBLY REMOVED, TYPE A, AS PER PLAN | 9 EACH | $200 | $200 | $220 | $200 | $200 |
| 203E20001 EMBANKMENT, AS PER PLAN | 40 CY | $53.50 | $54.00 | $59.00 | $31.06 | $53.50 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1 LS |
| $66,000 |
| $76,000 |
| $60,000 |
| $41,509 |
| $136,886 |
| 4% |
| 251E01040 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 2,141 SY | $23.00 | $14.00 | $22.00 | $38.23 | $29.00 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40,000 | $44,000 | $9,059 | $40,000 | 3% |
| 407E20000 NON-TRACKING TACK COAT | 14,569 GAL | $2.40 | $2.70 | $5.00 | $3.50 | $3.50 | 2% |
| 644E00104 EDGE LINE, 6" | 14.71 MILE | $2,000 | $1,870 | $2,453 | $1,775 | $1,775 | 2% |
| 644E00300 CENTER LINE | 9.08 MILE | $3,107 | $3,720 | $2,935 | $3,525 | $3,525 | 2% |
| 617E10100 COMPACTED AGGREGATE | 544 CY | $48.25 | $95.00 | $60.00 | $68.09 | $50.00 | 2% |
| 606E15050 GUARDRAIL, TYPE MGS | 1,325 FT | $15.20 | $15.50 | $16.72 | $15.20 | $15.20 | 1% |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 9.09 MILE | $2,014 | $1,715 | $935 | $1,625 | $1,625 | 1% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 10 EACH | $1,820 | $1,820 | $2,002 | $1,820 | $1,820 | 1% |
| 209E72001 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA | 779.26 STA | $19.00 | $18.00 | $20.00 | $26.02 | $14.00 | 1% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 160 HOUR | $65.00 | $75.00 | $75.00 | $75.00 | $80.00 | 1% |
| 621E00100 RPM | 506 EACH | $20.45 | $20.50 | $29.43 | $20.50 | $20.50 | 1% |
| 632E26500 DETECTOR LOOP | 10 EACH | $1,000 | $1,000 | $1,100 | $1,000 | $1,000 | 1% |
| 644E00600 CROSSWALK LINE | 3,829 FT | $2.50 | $2.45 | $2.53 | $2.25 | $2.25 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $8,250 | $5,000 | $10,000 | $4,454 | $7,500 | 1% |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $5,800 | $2,000 | $3,000 | $2,242 | $3,000 | 0% |
| 209E60200 LINEAR GRADING |
| 24 STA |
| $40.00 |
| $40.00 |
| $44.00 |
| $40.00 |
| $40.00 |
| 606E17360 GUARDRAIL, TYPE MGS, LONG-SPAN | 100 FT | $17.60 | $17.80 | $19.36 | $17.60 | $17.60 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 3 EACH | $745 | $750 | $820 | $745 | $745 |
| 606E98000 GUARDRAIL, MISC.:ALERNATIVE GAUDRAIL PLACEMENT | 100 FT | $11.60 | $12.00 | $12.76 | $11.60 | $11.60 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 33 EACH | $5.00 | $5.00 | $5.50 | $5.00 | $5.00 |
| 659E00300 TOPSOIL | 109 CY | $39.50 | $85.00 | $44.00 | $63.54 | $40.00 |
| 659E10000 SEEDING AND MULCHING | 980 SY | $3.00 | $3.00 | $3.30 | $2.75 | $3.75 |
| 659E20000 COMMERCIAL FERTILIZER | 0.04 TON | $475 | $475 | $523 | $625 | $1,875 |
| 659E31000 LIME | 0.3 ACRE | $100 | $100 | $110 | $110 | $110 |
| 659E35000 WATER | 6 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 4 EACH | $1,200 | $700 | $600 | $1,632 | $500 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 4 EACH | $1,150 | $700 | $600 | $838 | $350 |
| 409E30000 SAWING AND SEALING ASPHALT CONCRETE PAVEMENT JOINT | 272 FT | $19.00 | $20.00 | $4.00 | $19.00 | $19.00 |
| 617E25000 WATER | 0.95 MGAL | $90.00 | $500 | $1.00 | $10.00 | $2.00 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 4 EACH | $90.00 | $700 | $100 | $87.07 | $300 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 924 EACH | $5.00 | $1.90 | $3.00 | $10.37 | $1.25 |
| 644E00204 LANE LINE, 6" | 1.94 MILE | $1,051 | $685 | $1,439 | $650 | $650 |
| 644E00400 CHANNELIZING LINE, 8" | 994 FT | $1.25 | $1.00 | $1.38 | $1.00 | $1.00 |
| 644E00500 STOP LINE | 665 FT | $5.00 | $4.50 | $5.50 | $4.25 | $4.25 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 139 FT | $4.00 | $4.20 | $5.78 | $4.00 | $4.00 |
| 644E01000 RAILROAD SYMBOL MARKING | 4 EACH | $500 | $420 | $561 | $400 | $400 |
| 644E01100 SCHOOL SYMBOL MARKING, 72" | 7 EACH | $500 | $420 | $589 | $400 | $400 |
| 644E01300 LANE ARROW | 15 EACH | $75.00 | $80.00 | $87.00 | $75.00 | $75.00 |
| 644E01400 WORD ON PAVEMENT, 72", ONLY | 9 EACH | $80.00 | $100 | $105 | $95.00 | $95.00 |
| 632E27200 LOOP DETECTOR TIE IN | 10 EACH | $75.00 | $75.00 | $82.50 | $75.00 | $75.00 |
| 614E12460 WORK ZONE MARKING SIGN | 57 EACH | $95.00 | $105 | $80.00 | $95.00 | $105 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 1.94 MILE | $1,400 | $1,640 | $561 | $1,555 | $1,555 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 994 FT | $1.90 | $0.50 | $0.55 | $0.55 | $0.55 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 705 FT | $4.00 | $2.50 | $1.10 | $2.50 | $2.50 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E10000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG | 7,351 CY | $130 | $956k | 58% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 171,005.8 SY | $0.98 | $168k | 10% |
| 251E01040 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 2,617 SY | $27 | $71k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $66,000 | $66k | 4% |
| 251E01040 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 2,141 SY | $23 | $49k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 2% |
| 407E20000 NON-TRACKING TACK COAT | 14,569 GAL | $2.4 | $35k | 2% |
| 644E00104 EDGE LINE, 6" | 14.71 MILE | $2,000 | $29k | 2% |
| 644E00300 CENTER LINE | 9.08 MILE | $3,107 | $28k | 2% |
| 617E10100 COMPACTED AGGREGATE | 544 CY | $48.25 | $26k | 2% |