PRE-SR 122-01.53
PRE County · est $0.6M
Bid dateThursday, January 11—
PRE County · est $0.6M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 9.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 47 more items below.
| Item | Quantity | R1Bcc Ohio INC | R2Complete General Construction Company | R3Eagle Bridge CO | R4Shelly & Sands INC | R5Global Outdoor Solutions | R6Brumbaugh Construction INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 425 SY | $107 | $145 | $180 | $145 | $95.00 | $140 | 11% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $34,762 | $24,000 | $36,000 | $45,200 | $45,000 | $45,000 | 9% |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 758 SY | $43.88 | $8.50 |
| Item | Quantity | R1Bcc Ohio INC | R2Complete General Construction Company | R3Eagle Bridge CO | R4Shelly & Sands INC | R5Global Outdoor Solutions | R6Brumbaugh Construction INC |
|---|---|---|---|---|---|---|---|
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $708 | $4,000 | $1,000 | $1,500 | $3,000 | $5,000 |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 95 SY | $23.98 | $25.00 | $40.00 | $20.00 | $45.00 | $34.00 |
| 202E38000 GUARDRAIL REMOVED | 532 FT | $6.04 | $5.00 | $5.76 | $3.00 | $2.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $30.00 |
| $25.00 |
| $48.00 |
| $80.00 |
| 8% |
| 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 474 SY | $68.47 | $70.00 | $150 | $112 | $100 | $150 | 8% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 156.25 FT | $184 | $134 | $175 | $149 | $140 | $200 | 7% |
| 511E21523 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, AS | 26 CY | $1,083 | $2,300 | $1,900 | $2,470 | $1,100 | $2,200 | 7% |
| 511E81300 CONCRETE, MISC.:EMBEDDED GALVANIC ANODE | 566 EACH | $49.51 | $50.00 | $23.00 | $52.00 | $26.00 | $50.00 | 7% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 127 CY | $210 | $190 | $190 | $212 | $200 | $210 | 7% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 92 CY | $263 | $230 | $231 | $265 | $300 | $255 | 6% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $21,399 | $35,000 | $55,000 | $51,400 | $25,000 | $50,000 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $18,566 | $20,000 | $20,000 | $20,000 | $35,000 | $27,565 | 5% |
| 304E20000 AGGREGATE BASE | 127 CY | $91.18 | $65.00 | $60.00 | $83.00 | $68.00 | $50.00 | 3% |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 606E15050 GUARDRAIL, TYPE MGS | 550 FT | $17.85 | $15.70 | $17.04 | $17.00 | $16.00 | $19.00 | 2% |
| 606E26101 ANCHOR ASSEMBLY, TYPE E, AS PER PLAN | 4 EACH | $2,231 | $1,930 | $2,130 | $2,119 | $2,000 | $2,400 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE T=3" | 1,026 SY | $8.40 | $8.50 | $8.52 | $9.00 | $14.00 | $10.00 | 2% |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 36.4 CF | $236 | $483 | $500 | $566 | $500 | $1,100 | 2% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (29 CY | $263 | $300 | $301 | $265 | $520 | $330 | 2% |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $1,706 | $1,875 | $1,629 | $2,013 | $2,000 | $1,800 | 2% |
| 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL) | 4 EACH | $1,587 | $1,800 | $1,804 | $2,066 | $2,100 | $2,000 | 2% |
| $8.00 |
| 202E42001 ANCHOR ASSEMBLY REMOVED, TYPE A, AS PER PLAN | 4 EACH | $263 | $100 | $251 | $292 | $250 | $400 |
| 203E10000 EXCAVATION | 353 CY | $16.40 | $15.00 | $30.00 | $24.00 | $22.00 | $18.00 |
| 203E20001 EMBANKMENT, AS PER PLAN | 86 CY | $18.94 | $10.00 | $25.00 | $11.00 | $23.00 | $18.00 |
| 204E10000 SUBGRADE COMPACTION | 746 SY | $1.92 | $5.00 | $4.00 | $2.00 | $3.00 | $1.00 |
| 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA | 0.16 MILE | $12,656 | $8,185 | $3,000 | $7,900 | $30,000 | $10,500 |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 5 CY | $228 | $250 | $45.00 | $227 | $125 | $65.00 |
| 659E10000 SEEDING AND MULCHING | 213 SY | $9.97 | $9.50 | $8.00 | $11.00 | $8.00 | $5.50 |
| 659E20000 COMMERCIAL FERTILIZER | 0.03 TON | $945 | $750 | $1,000 | $5,296 | $750 | $650 |
| 659E35000 WATER | 1.8 MGAL | $2.63 | $1.00 | $1.00 | $11.00 | $10.00 | $5.00 |
| 407E10000 TACK COAT | 141 GAL | $3.15 | $3.00 | $3.01 | $3.20 | $3.00 | $3.25 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BI-DIRECTIONAL) | 12 EACH | $16.38 | $10.00 | $8.02 | $8.00 | $11.00 | $9.00 |
| 644E00104 EDGE LINE, 6" | 0.18 MILE | $7,668 | $8,370 | $7,320 | $8,866 | $8,500 | $9,300 |
| 644E00300 CENTER LINE | 0.09 MILE | $15,336 | $9,970 | $14,640 | $10,600 | $10,000 | $11,000 |
| 646E10010 EDGE LINE, 6" | 0.04 MILE | $72,308 | $93,130 | $69,024 | $98,640 | $94,000 | $103,500 |
| 646E10200 CENTER LINE | 0.02 MILE | $144,759 | $94,735 | $138,182 | $100,340 | $95,000 | $105,000 |
| 614E11630 INCREASED BARRIER DELINEATION | 240 FT | $2.36 | $2.25 | $2.00 | $1.00 | $230 | $2.50 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BI-DIRECTIONAL) | 12 EACH | $18.50 | $8.00 | $6.00 | $11.00 | $12.00 | $9.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 12 EACH | $19.13 | $13.00 | $10.00 | $17.00 | $15.00 | $14.00 |
| 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I | 0.12 MILE | $16,475 | $11,000 | $15,000 | $11,651 | $11,100 | $12,000 |
| 614E22200 WORK ZONE EDGE LINE, CLASS I, 4", 740.06, TYPE I | 0.2 MILE | $8,244 | $6,072 | $9,000 | $6,432 | $6,200 | $6,800 |
| 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I | 48 FT | $15.50 | $8.00 | $5.00 | $9.00 | $9.00 | $9.00 |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $6,014 | $4,800 | $2,250 | $5,000 | $8,000 | $5,000 |
| 622E41000 PORTABLE BARRIER, 32" | 240 FT | $22.61 | $14.50 | $16.00 | $17.00 | $20.00 | $16.00 |
| 622E41020 PORTABLE BARRIER, 32", BRIDGE MOUNTED | 210 FT | $25.94 | $16.50 | $20.00 | $22.00 | $20.00 | $20.00 |
| 202E38500 BRIDGE RAILING REMOVED | 156.25 FT | $10.19 | $22.00 | $13.84 | $19.00 | $5.00 | $9.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $1,062 | $1,200 | $1.00 | $500 | $6,000 | $7,500 |
| 503E21100 UNCLASSIFIED EXCAVATION | 6 CY | $69.50 | $500 | $50.00 | $57.00 | $100 | $90.00 |
| 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN | 3,190 LB | $1.65 | $1.75 | $2.00 | $2.00 | $2.00 | $2.00 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 100 LB | $1.65 | $3.00 | $1.00 | $3.00 | $5.00 | $20.00 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 47 EACH | $19.69 | $17.50 | $25.00 | $25.00 | $25.00 | $30.00 |
| 511E43513 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING | 3 CY | $1,316 | $2,910 | $2,500 | $1,900 | $2,500 | $4,400 |
| 511E71100 CONCRETE, MISC.:SELF CONSOLIDATING CONCRETE | 1 CY | $5,243 | $3,590 | $4,000 | $5,357 | $3,000 | $1,800 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 156 SY | $24.78 | $25.00 | $25.00 | $26.99 | $22.00 | $30.00 |
| 512E33000 TYPE 2 WATERPROOFING | 4 SY | $33.00 | $60.00 | $100 | $206 | $100 | $100 |
| 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER | 8 SF | $14.39 | $10.00 | $6.00 | $22.00 | $25.00 | $60.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 8 CY | $99.00 | $225 | $125 | $143 | $118 | $60.00 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 151 FT | $9.55 | $15.00 | $17.00 | $15.00 | $17.00 | $12.00 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 5 SF | $142 | $300 | $300 | $681 | $110 | $90.00 |
| 530E00200 SPECIAL - STRUCTURESTEMPORARY CONSTRUCTION SITE AC | 1 LS | $5,910 | $18,000 | $1.00 | $8,500 | $6,000 | $4,500 |
| 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE | 13 CY | $345 | $180 | $215 | $222 | $300 | $200 |
| 848E50000 HAND CHIPPING | 18 SY | $133 | $50.00 | $75.00 | $58.00 | $120 | $300 |
| 848E50100 TEST SLAB | 1 LS | $1,212 | $4,000 | $1,000 | $1,288 | $1,000 | $300 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,190 | $5,000 | $6,000 | $3,126 | $8,000 | $13,295 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $2,565 | $3,000 | $2,500 | $2,102 | $3,000 | $5,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 425 SY | $107.46 | $46k | 9% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $34,762 | $35k | 7% |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 758 SY | $43.88 | $33k | 7% |
| 848E10200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 474 SY | $68.47 | $32k | 6% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 156.25 FT | $183.75 | $29k | 6% |
| 511E21523 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, AS | 26 CY | $1,083 | $28k | 6% |
| 511E81300 CONCRETE, MISC.:EMBEDDED GALVANIC ANODE | 566 EACH | $49.51 | $28k | 6% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 127 CY | $210 | $27k | 5% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 92 CY | $262.5 | $24k | 5% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $21,399 | $21k | 4% |