SCI-SR 104-17.35 Deck Replace
SCI County · est $1.5M
Bid dateThursday, January 25—
SCI County · est $1.5M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 10.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 67 more items below.
| Item | Quantity | R1Double Z Construction Company | R2Native Construction LLC | R3Sunesis Construction CO | R4Complete General Construction Company | R5Shelly & Sands INC | R6Righter Company INC | R7Kokosing Construction Company INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 515E15130 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M | 4 EACH | $38,100 | $39,850 | $39,158 | $41,000 | $50,409 | $60,000 | $57,750 | 16% |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 177 CY | $650 | $650 | $836 | $750 | $980 | $950 | $1,200 | 12% |
| Item | Quantity | R1Double Z Construction Company | R2Native Construction LLC | R3Sunesis Construction CO | R4Complete General Construction Company | R5Shelly & Sands INC | R6Righter Company INC | R7Kokosing Construction Company INC |
|---|---|---|---|---|---|---|---|---|
| 202E23010 PAVEMENT REMOVED, ASPHALT | 416 SY | $10.00 | $9.00 | $15.98 | $8.00 | $25.00 | $15.00 | $21.00 |
| 202E38000 GUARDRAIL REMOVED | 781 FT | $1.50 | $2.00 | $2.88 | $1.50 | $2.00 | $1.50 | $3.50 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING | 194 CY | $450 | $540 | $492 | $550 | $700 | $600 | $720 | 9% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 74,030 LB | $1.00 | $1.34 | $0.93 | $1.00 | $1.01 | $1.10 | $1.30 | 8% |
| 526E30000 REINFORCED CONCRETE APPROACH SLABS (T=17") | 277 SY | $220 | $290 | $236 | $290 | $235 | $225 | $250 | 6% |
| 202E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN | 1 LS | $52,000 | $53,880 | $56,364 | $95,000 | $67,800 | $75,000 | $85,000 | 6% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $51,000 | $92,000 | $66,587 | $70,000 | $58,000 | $95,000 | $45,000 | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 237 CY | $180 | $180 | $180 | $180 | $217 | $180 | $232 | 5% |
| 511E33419 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, AS | 73 CY | $560 | $800 | $585 | $700 | $378 | $500 | $821 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $37,845 | $52,400 | $40,000 | $40,000 | $40,000 | $40,000 | 4% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 262 FT | $132 | $140 | $127 | $128 | $136 | $140 | $135 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $33,000 | $11,750 | $96,701 | $35,000 | $37,000 | $50,000 | $50,000 | 4% |
| 613E41251 LOW STRENGTH MORTAR BACKFILL (TYPE 1), AS PER PLAN | 531 CY | $52.00 | $62.00 | $83.18 | $85.00 | $120 | $90.00 | $150 | 3% |
| 507E00100 STEEL PILES HP10X42, FURNISHED | 935 FT | $25.00 | $21.75 | $22.99 | $31.00 | $17.00 | $30.00 | $24.00 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $20,000 | $5,000 | $25,000 | $25,000 | $7,500 | $15,000 | $22,500 | 2% |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $18,000 | $22,000 | $15,841 | $16,000 | $20,000 | $20,000 | $15,000 | 2% |
| 515E20000 INTERMEDIATE DIAPHRAGMS | 9 EACH | $2,000 | $2,050 | $2,704 | $2,000 | $1,000 | $1,500 | $2,700 | 2% |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 351 CY | $50.00 | $85.00 | $74.35 | $60.00 | $40.00 | $50.00 | $125 | 2% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 78 CY | $220 | $220 | $220 | $220 | $270 | $220 | $289 | 2% |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 36 CF | $400 | $360 | $401 | $360 | $380 | $360 | $360 | 2% |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E |
| 2 EACH |
| $200 |
| $165 |
| $241 |
| $135 |
| $26.00 |
| $200 |
| $250 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 1 EACH | $90.00 | $80.00 | $167 | $80.00 | $53.00 | $90.00 | $100 |
| 202E75000 FENCE REMOVED | 20 FT | $7.00 | $9.00 | $2.37 | $15.00 | $8.50 | $10.00 | $50.00 |
| 203E10000 EXCAVATION | 385 CY | $20.00 | $24.00 | $20.99 | $18.00 | $19.00 | $20.00 | $40.00 |
| 203E20000 EMBANKMENT | 726 CY | $7.00 | $18.00 | $22.87 | $15.00 | $11.00 | $20.00 | $40.00 |
| 204E10000 SUBGRADE COMPACTION | 1,368 SY | $2.00 | $3.00 | $2.60 | $2.25 | $2.00 | $2.00 | $5.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 387.5 FT | $15.50 | $16.80 | $16.80 | $16.80 | $17.00 | $16.00 | $16.80 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 4 EACH | $800 | $675 | $675 | $675 | $715 | $800 | $675 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $1,850 | $1,850 | $1,850 | $1,850 | $2,000 | $1,850 | $1,850 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 1 EACH | $125 | $100 | $107 | $100 | $105 | $125 | $295 |
| 690E50350 SPECIAL - MAILBOX REMOVED AND RESET | 1 EACH | $25.00 | $100 | $150 | $100 | $105 | $25.00 | $295 |
| 659E10000 SEEDING AND MULCHING | 1,695 SY | $1.68 | $2.35 | $2.86 | $1.68 | $2.00 | $1.68 | $1.76 |
| 659E14000 REPAIR SEEDING AND MULCHING | 85 SY | $1.68 | $1.00 | $1.92 | $1.68 | $0.75 | $1.68 | $1.76 |
| 659E20000 COMMERCIAL FERTILIZER | 0.4 TON | $625 | $750 | $825 | $625 | $404 | $625 | $656 |
| 659E31000 LIME | 0.35 ACRE | $100 | $200 | $275 | $100 | $162 | $100 | $105 |
| 659E35000 WATER | 10 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.05 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $8,000 | $3,500 | $6,015 | $4,500 | $6,300 | $3,000 | $5,750 |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 179 FT | $8.00 | $20.00 | $7.43 | $14.00 | $11.00 | $10.00 | $25.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 509 SY | $5.50 | $11.50 | $9.45 | $5.50 | $14.82 | $5.50 | $15.88 |
| 304E20000 AGGREGATE BASE | 203 CY | $70.00 | $48.00 | $59.60 | $65.00 | $70.00 | $65.00 | $75.00 |
| 407E10000 TACK COAT | 80 GAL | $2.00 | $2.00 | $2.00 | $2.00 | $4.00 | $2.00 | $2.27 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 22 CY | $220 | $220 | $220 | $220 | $270 | $220 | $289 |
| 621E00100 RPM | 10 EACH | $100 | $240 | $250 | $240 | $265 | $325 | $250 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 10 EACH | $9.00 | $240 | $1.00 | $14.00 | $17.00 | $10.00 | $50.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 13 EACH | $7.50 | $10.00 | $10.00 | $10.00 | $11.00 | $7.50 | $10.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 13 FT | $15.00 | $12.00 | $12.00 | $10.00 | $11.00 | $15.00 | $10.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $55.00 | $75.00 | $75.00 | $40.00 | $42.00 | $55.00 | $40.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 1 EACH | $15.00 | $25.00 | $25.00 | $15.00 | $16.00 | $15.00 | $15.00 |
| 642E00090 EDGE LINE, 4" | 0.33 MILE | $3,003 | $4,095 | $3,365 | $4,095 | $3,200 | $3,365 | $3,003 |
| 642E00290 CENTER LINE | 0.17 MILE | $6,006 | $4,195 | $6,565 | $4,195 | $6,300 | $6,565 | $6,006 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 30 CY | $75.00 | $79.00 | $68.81 | $90.00 | $65.00 | $55.00 | $130 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 24 HOUR | $65.00 | $75.00 | $75.00 | $65.00 | $74.00 | $65.00 | $90.00 |
| 614E11630 INCREASED BARRIER DELINEATION | 1,220 FT | $1.00 | $2.25 | $2.25 | $2.25 | $1.20 | $2.00 | $0.35 |
| 614E12336 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL) | 4 EACH | $1,850 | $1,800 | $1,800 | $1,800 | $2,100 | $1,850 | $2,800 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, BIDIRECTIONAL | 10 EACH | $10.00 | $9.00 | $13.49 | $9.00 | $12.00 | $40.00 | $11.00 |
| 614E13312 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 29 EACH | $15.00 | $10.00 | $10.00 | $10.00 | $10.00 | $40.00 | $15.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 39 EACH | $20.00 | $13.00 | $13.00 | $13.00 | $16.00 | $40.00 | $16.00 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 0.05 MILE | $12,000 | $5,695 | $31,395 | $5,695 | $13,000 | $31,395 | $12,000 |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 0.5 MILE | $5,326 | $5,545 | $5,460 | $5,545 | $5,600 | $5,460 | $5,326 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 24 FT | $8.00 | $2.50 | $4.00 | $2.50 | $8.50 | $4.00 | $8.00 |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $6,000 | $17,500 | $638 | $9,000 | $11,000 | $20,000 | $45,000 |
| 615E20001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, AS PER | 72 SY | $100 | $70.00 | $97.76 | $90.00 | $190 | $110 | $68.00 |
| 616E10000 WATER | 2 MGAL | $10.00 | $100 | $16.90 | $65.00 | $42.00 | $10.00 | $130 |
| 622E41000 PORTABLE BARRIER, 32" | 1,055 FT | $10.00 | $16.00 | $13.43 | $12.00 | $12.99 | $15.00 | $13.00 |
| 622E41020 PORTABLE BARRIER, 32", BRIDGE MOUNTED | 240 FT | $12.00 | $21.00 | $19.29 | $13.00 | $18.00 | $15.00 | $30.00 |
| 202E23500 WEARING COURSE REMOVED | 514 SY | $5.00 | $15.50 | $5.91 | $14.00 | $6.00 | $5.00 | $23.27 |
| 503E21301 UNCLASSIFIED EXCAVATION, AS PER PLAN | 1 LS | $7,000 | $8,900 | $6,743 | $20,000 | $10,000 | $17,000 | $30,000 |
| 507E00150 STEEL PILES HP10X42, DRIVEN | 825 FT | $12.00 | $18.00 | $20.71 | $10.00 | $18.00 | $7.00 | $20.00 |
| 507E93300 STEEL POINTS OR SHOES | 22 EACH | $80.00 | $115 | $116 | $85.00 | $90.00 | $125 | $125 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 691 SY | $18.00 | $27.00 | $18.00 | $18.00 | $19.00 | $18.00 | $18.00 |
| 512E33000 TYPE 2 WATERPROOFING | 244 SY | $12.00 | $29.00 | $22.00 | $22.00 | $23.00 | $22.00 | $27.00 |
| 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER | 139 SF | $10.00 | $1.60 | $2.08 | $8.00 | $8.00 | $4.00 | $5.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 152 SF | $10.00 | $2.60 | $3.45 | $9.00 | $9.00 | $6.00 | $6.00 |
| 516E14014 INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 132 FT | $20.00 | $20.00 | $50.00 | $33.00 | $40.00 | $50.00 | $50.00 |
| 516E41100 1/8" PREFORMED BEARING PAD, 1'-0" x 1'-0" | 8 EACH | $20.00 | $20.00 | $24.12 | $65.00 | $49.00 | $15.00 | $44.00 |
| 516E46900 BEARING DEVICE, MISC.:, STEEL BEARING | 8 EACH | $1,000 | $920 | $1,055 | $1,000 | $750 | $1,000 | $1,120 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 163 CY | $80.00 | $85.00 | $56.93 | $75.00 | $86.00 | $75.00 | $80.00 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 306 FT | $14.00 | $15.00 | $14.50 | $13.00 | $17.00 | $14.50 | $9.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 168 FT | $5.00 | $10.00 | $3.36 | $6.00 | $4.00 | $10.00 | $7.00 |
| 518E40011 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 100 FT | $5.00 | $15.00 | $8.83 | $14.00 | $3.45 | $15.00 | $11.00 |
| 526E90011 TYPE A INSTALLATION, AS PER PLAN | 86 FT | $100 | $77.00 | $92.44 | $145 | $163 | $150 | $134 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $12,000 | $11,256 | $7,956 | $11,000 | $9,000 | $20,000 | $10,000 |
| 619E16000 FIELD OFFICE, TYPE A | 6 MNTH | $1,400 | $1,500 | $1,421 | $1,800 | $2,700 | $1,500 | $8,334 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $6,000 | $7,500 | $2,550 | $6,000 | $10,000 | $7,500 | $20,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 515E15130 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M | 4 EACH | $38,100 | $152k | 13% |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 177 CY | $650 | $115k | 10% |
| 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING | 194 CY | $450 | $87k | 7% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 74,030 LB | $1 | $74k | 6% |
| 526E30000 REINFORCED CONCRETE APPROACH SLABS (T=17") | 277 SY | $220 | $61k | 5% |
| 202E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN | 1 LS | $52,000 | $52k | 4% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $51,000 | $51k | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 237 CY | $180 | $43k | 4% |
| 511E33419 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, AS | 73 CY | $560 | $41k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 3% |