TUS-IR 77-03.78
TUS County · est $4.8M
Bid dateThursday, January 11—
TUS County · est $4.8M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 11.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 145 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Complete General Construction Company | R3J D Williamson Construction CO INC | R4Keffler Bridge Company | R5Kokosing Construction Company INC | R6Great Lakes Construction CO | % of bid |
|---|---|---|---|---|---|---|---|---|
| 511E21522 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE | 706 CY | $650 | $700 | $635 | $750 | $875 | $770 | 15% |
| 513E10260 STRUCTURAL STEEL MEMBERS, LEVEL 3 | 294,600 LB | $1.20 | $0.85 | $1.16 | $1.30 | $1.60 | $1.13 | 12% |
| 511E21522 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE | 403 CY | $750 |
| Item | Quantity | R1Shelly & Sands INC | R2Complete General Construction Company | R3J D Williamson Construction CO INC | R4Keffler Bridge Company | R5Kokosing Construction Company INC | R6Great Lakes Construction CO |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $10,000 | $28,000 | $10,000 | $20,000 | $15,000 | $75,000 |
| 202E23000 PAVEMENT REMOVED | 966 SY | $13.00 | $20.00 | $14.50 | $18.00 | $15.00 | $29.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 32 FT | $11.00 | $50.00 | $8.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $750 |
| $595 |
| $750 |
| $950 |
| $920 |
| 10% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 269,176 LB | $0.85 | $0.95 | $0.82 | $0.96 | $1.00 | $0.95 | 8% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $180,000 | $100,000 | $250,000 | $256,000 | $241,966 | $350,000 | 6% |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 2,979 SY | $45.50 | $62.00 | $50.00 | $68.00 | $55.50 | $66.00 | 5% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $135,000 | $100,000 | $250,000 | $140,000 | $150,000 | $290,000 | 5% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 142,771 LB | $0.90 | $0.95 | $0.82 | $0.96 | $1.00 | $0.95 | 4% |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $125,000 | $40,000 | $75,000 | $85,000 | $80,000 | $72,000 | 4% |
| 526E25011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 460 SY | $265 | $245 | $265 | $260 | $300 | $260 | 4% |
| 622E41011 PORTABLE BARRIER, 50", AS PER PLAN | 10,437 FT | $11.50 | $16.00 | $16.60 | $12.00 | $11.30 | $22.00 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $105,000 | $125,000 | $110,000 | $208,000 | $130,000 | $180,000 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100,000 | $100,000 | $200,000 | $200,000 | $200,000 | 3% |
| 526E25011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 394 SY | $250 | $260 | $265 | $290 | $280 | $270 | 3% |
| 614E12756 WORK ZONE CROSSOVER LIGHTING SYSTEM | 2 EACH | $39,000 | $40,000 | $30,000 | $28,000 | $37,000 | $26,000 | 3% |
| 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 192 CY | $390 | $350 | $620 | $590 | $545 | $510 | 3% |
| 511E44110 CLASS QC1 CONCRETE, ABUTMENT NOT INCLUDING FOOTING | 88 CY | $800 | $1,100 | $550 | $710 | $1,100 | $710 | 2% |
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 282 CY | $225 | $225 | $232 | $190 | $245 | $225 | 2% |
| 442E20200 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 324 CY | $175 | $175 | $180 | $200 | $191 | $175 | 2% |
| 516E11210 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S | 142 FT | $390 | $375 | $355 | $430 | $350 | $475 | 2% |
| $8.00 |
| $17.00 |
| $27.13 |
| 202E38000 GUARDRAIL REMOVED | 2,296 FT | $1.00 | $1.60 | $1.75 | $2.00 | $1.60 | $1.60 |
| 202E38300 GUARDRAIL REMOVED, BARRIER DESIGN | 90 FT | $100 | $2.00 | $2.10 | $3.00 | $2.00 | $2.00 |
| 202E75000 FENCE REMOVED | 124 FT | $2.00 | $2.20 | $2.50 | $6.00 | $2.20 | $2.50 |
| 203E10000 EXCAVATION | 1,849 CY | $10.00 | $8.00 | $13.15 | $15.00 | $14.00 | $32.00 |
| 203E20000 EMBANKMENT | 444 CY | $9.00 | $15.50 | $14.50 | $10.00 | $4.50 | $15.00 |
| 204E10000 SUBGRADE COMPACTION | 1,015 SY | $2.00 | $5.00 | $2.25 | $1.00 | $6.00 | $20.00 |
| 204E45000 PROOF ROLLING | 1 HOUR | $200 | $250 | $150 | $50.00 | $200 | $340 |
| 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA | 0.2 MILE | $6,500 | $7,500 | $7,750 | $2,500 | $7,770 | $40,000 |
| 606E15050 GUARDRAIL, TYPE MGS | 1,662.5 FT | $17.00 | $15.80 | $16.55 | $17.00 | $15.80 | $15.80 |
| 606E25550 ANCHOR ASSEMBLY, MGS TYPE A | 1 EACH | $1,100 | $1,030 | $1,100 | $1,400 | $1,030 | $1,030 |
| 606E26050 ANCHOR ASSEMBLY, MGS TYPE B | 6 EACH | $1,800 | $1,720 | $1,800 | $2,000 | $1,720 | $1,720 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 1 EACH | $2,000 | $1,875 | $2,000 | $2,100 | $1,875 | $1,875 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 2 EACH | $800 | $750 | $800 | $800 | $750 | $750 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 12 EACH | $2,200 | $2,040 | $2,150 | $2,300 | $2,040 | $2,040 |
| 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 4 EACH | $400 | $385 | $405 | $450 | $385 | $385 |
| 607E15000 FENCE, TYPE 47 | 110 FT | $24.29 | $23.00 | $24.00 | $30.00 | $18.35 | $17.50 |
| 607E35000 FENCE REMOVED AND REBUILT | 152 FT | $21.00 | $19.80 | $21.00 | $17.00 | $32.50 | $31.00 |
| 601E20011 CRUSHED AGGREGATE SLOPE PROTECTION, AS PER PLAN | 346 CY | $60.00 | $50.00 | $92.00 | $85.00 | $80.00 | $45.00 |
| 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1 | 13 SY | $125 | $150 | $265 | $60.00 | $169 | $410 |
| 601E21060 TIED CONCRETE BLOCK MAT, TYPE 2 | 292 SY | $40.00 | $90.00 | $66.00 | $45.00 | $63.00 | $90.00 |
| 601E25001 DUMPED ROCK FILL, TYPE A, AS PER PLAN | 448 CY | $45.00 | $35.00 | $92.00 | $70.00 | $36.00 | $88.00 |
| 659E00100 SOIL ANALYSIS TEST | 4 EACH | $93.00 | $100 | $52.00 | $50.00 | $109 | $50.00 |
| 659E00300 TOPSOIL | 280 CY | $14.00 | $33.13 | $43.25 | $8.00 | $40.00 | $42.00 |
| 659E10000 SEEDING AND MULCHING | 2,524 SY | $1.00 | $1.21 | $1.05 | $2.00 | $1.30 | $1.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 127 SY | $0.70 | $1.20 | $2.05 | $0.50 | $1.30 | $2.00 |
| 659E15000 INTER-SEEDING | 127 SY | $0.70 | $1.20 | $0.50 | $0.10 | $1.30 | $0.01 |
| 659E20000 COMMERCIAL FERTILIZER | 0.35 TON | $700 | $625 | $650 | $525 | $679 | $600 |
| 659E31000 LIME | 0.52 ACRE | $165 | $110 | $105 | $105 | $120 | $1.00 |
| 659E35000 WATER | 14 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $1.10 | $1.00 |
| 832E30000 EROSION CONTROL | 27,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E11110 6" SHALLOW PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 280 FT | $12.50 | $15.00 | $12.00 | $20.00 | $17.00 | $20.00 |
| 605E13410 6" UNCLASSIFIED PIPE UNDERDRAINS WITH GEOTEXTILE F | 100 FT | $12.50 | $20.00 | $12.25 | $10.00 | $12.00 | $15.00 |
| 605E14020 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 179 FT | $13.30 | $13.00 | $8.50 | $18.00 | $12.59 | $18.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 352 FT | $17.00 | $25.00 | $20.00 | $13.00 | $27.00 | $24.00 |
| 611E01500 6" CONDUIT, TYPE F | 100 FT | $19.00 | $25.00 | $19.00 | $10.00 | $16.00 | $24.00 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 7 EACH | $300 | $250 | $250 | $150 | $276 | $330 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 1,029 FT | $2.80 | $7.50 | $2.60 | $3.00 | $1.85 | $2.80 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE(T = 4.5") | 3,429 SY | $10.50 | $8.00 | $6.05 | $8.00 | $8.00 | $3.45 |
| 304E20000 AGGREGATE BASE | 297 CY | $80.00 | $125 | $66.50 | $80.00 | $85.00 | $65.00 |
| 407E10000 TACK COAT | 816 GAL | $2.25 | $2.25 | $2.50 | $3.00 | $2.45 | $2.25 |
| 442E20001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 183 CY | $275 | $275 | $285 | $290 | $299 | $275 |
| 609E24510 CURB, TYPE 4-C | 280 FT | $28.00 | $50.00 | $21.00 | $44.00 | $30.00 | $40.00 |
| 617E10100 COMPACTED AGGREGATE | 15 CY | $53.00 | $85.00 | $270 | $200 | $200 | $75.00 |
| 626E00102 BARRIER REFLECTOR, TYPE 1, ONE WAY | 33 EACH | $8.00 | $6.50 | $7.00 | $6.00 | $6.50 | $6.50 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BI-DIRECTIONAL | 18 EACH | $8.50 | $6.70 | $7.05 | $6.00 | $6.70 | $6.70 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, ONE WAY | 31 EACH | $8.50 | $6.50 | $7.00 | $11.00 | $6.50 | $6.50 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 80 FT | $13.00 | $12.50 | $13.00 | $14.00 | $12.50 | $9.25 |
| 630E80100 SIGN, FLAT SHEET | 8 SF | $37.00 | $35.00 | $36.50 | $40.00 | $35.00 | $20.00 |
| 646E10010 EDGE LINE, 6" | 8.17 MILE | $3,500 | $3,316 | $2,800 | $3,500 | $3,639 | $2,700 |
| 646E10110 LANE LINE, 6" | 4.02 MILE | $2,100 | $1,983 | $1,200 | $2,500 | $1,550 | $1,150 |
| 646E10200 CENTER LINE | 0.32 MILE | $7,000 | $6,594 | $5,000 | $7,500 | $6,321 | $4,690 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 25 CY | $9.00 | $100 | $83.00 | $75.00 | $75.00 | $70.00 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 108 CY | $31.00 | $95.00 | $71.00 | $70.00 | $85.00 | $80.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 60 HOUR | $74.00 | $80.00 | $67.00 | $70.00 | $70.00 | $80.00 |
| 614E11630 INCREASED BARRIER DELINEATION | 3,152 FT | $1.00 | $1.50 | $3.00 | $1.00 | $1.50 | $0.75 |
| 614E12200 SPECIAL - WORK ZONE GUARDRAIL | 12.5 FT | $26.00 | $62.00 | $65.00 | $70.00 | $244 | $244 |
| 614E12350 WORK ZONE IMPACT ATTENUATOR | 6 EACH | $2,100 | $1,920 | $2,050 | $2,000 | $2,300 | $1,750 |
| 614E12484 WORK ZONE INCREASED PENALTIES SIGN | 2 EACH | $158 | $150 | $135 | $500 | $150 | $190 |
| 614E12500 REPLACEMENT SIGN | 10 EACH | $158 | $150 | $155 | $100 | $150 | $98.00 |
| 614E12600 REPLACEMENT DRUM | 100 EACH | $90.00 | $85.00 | $37.00 | $30.00 | $85.00 | $39.00 |
| 614E12760 SPECIAL - FLASHING ARROW PANEL | 4 EACH | $800 | $1,900 | $620 | $1,000 | $47.00 | $810 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 25 CY | $150 | $150 | $100 | $200 | $300 | $316 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, BI-DIRECTIONAL | 12 EACH | $5.00 | $21.50 | $8.25 | $8.00 | $21.50 | $5.80 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, ONE-WAY | 523 EACH | $5.00 | $5.00 | $7.25 | $8.00 | $5.00 | $5.00 |
| 614E13312 BARRIER REFLECTOR, TYPE 2, BI-DIRECTIONAL | 9 EACH | $6.00 | $28.00 | $8.25 | $8.00 | $28.00 | $5.50 |
| 614E13312 BARRIER REFLECTOR, TYPE 2, ONE-WAY | 29 EACH | $6.45 | $10.50 | $7.25 | $6.00 | $10.50 | $5.25 |
| 614E13350 OBJECT MARKER, ONE WAY | 122 EACH | $9.00 | $12.50 | $11.50 | $11.00 | $12.50 | $11.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 232 EACH | $9.00 | $12.50 | $13.50 | $14.00 | $12.50 | $16.00 |
| 614E18030 MAINTAINING TRAFFIC, MISC.:REMOVAL OF SHOULDER RUM | 14,663 FT | $1.80 | $4.50 | $3.25 | $4.00 | $2.51 | $1.80 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 28 SNMT | $850 | $1,350 | $1,100 | $400 | $400 | $600 |
| 614E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 22 SNMT | $600 | $800 | $1,250 | $300 | $350 | $675 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 0.5 MILE | $3,200 | $3,054 | $3,600 | $1,100 | $3,054 | $3,054 |
| 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I | 0.19 MILE | $12,000 | $11,685 | $9,250 | $11,000 | $15,000 | $10,296 |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 0.34 MILE | $8,200 | $7,715 | $6,250 | $9,000 | $8,988 | $8,000 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 11.15 MILE | $1,500 | $1,450 | $710 | $1,900 | $1,450 | $1,450 |
| 614E24400 WORK ZONE DOTTED LINE, CLASS I, 740.06, TYPE I | 142 FT | $3.00 | $3.00 | $2.35 | $1.00 | $2.40 | $1.28 |
| 614E24610 WORK ZONE DOTTED LINE, CLASS III, 642 PAINT | 3,360 FT | $0.25 | $0.25 | $0.60 | $0.50 | $0.25 | $0.75 |
| 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I | 36 FT | $8.00 | $7.40 | $4.00 | $6.00 | $9.47 | $5.80 |
| 615E20001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, AS PER | 873 SY | $45.50 | $57.00 | $60.00 | $67.00 | $52.00 | $45.50 |
| 616E10000 WATER | 55 MGAL | $40.00 | $60.00 | $5.00 | $5.00 | $75.00 | $60.00 |
| 622E41000 PORTABLE BARRIER, 32" | 1,891 FT | $12.50 | $16.00 | $15.60 | $14.00 | $9.75 | $22.00 |
| 614E12801 WORK ZONE RAISED PAVEMENT MARKER, AS PER PLAN | 560 EACH | $11.00 | $12.50 | $25.00 | $20.00 | $41.00 | $25.00 |
| 202E22900 APPROACH SLAB REMOVED | 268 SY | $24.99 | $50.00 | $22.75 | $25.00 | $37.00 | $60.00 |
| 202E23500 WEARING COURSE REMOVED | 1,469 SY | $4.00 | $9.00 | $4.15 | $6.00 | $3.50 | $3.62 |
| 503E21100 UNCLASSIFIED EXCAVATION | 152 CY | $22.00 | $250 | $200 | $120 | $129 | $270 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 1,053 EACH | $24.00 | $9.00 | $18.00 | $13.00 | $14.00 | $30.00 |
| 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 86 CY | $490 | $500 | $615 | $600 | $475 | $600 |
| 511E41010 CLASS QC1 CONCRETE, PIER ABOVE FOOTINGS | 39 CY | $820 | $1,200 | $815 | $850 | $1,200 | $1,400 |
| 511E44110 CLASS QC1 CONCRETE, ABUTMENT NOT INCLUDING FOOTING | 47 CY | $900 | $900 | $540 | $600 | $1,125 | $1,450 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 1,536 SY | $21.00 | $20.69 | $19.00 | $16.00 | $21.58 | $23.50 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 8,595 EACH | $3.00 | $3.10 | $3.05 | $4.00 | $4.50 | $3.05 |
| 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER | 195 SF | $5.00 | $8.00 | $3.00 | $6.00 | $3.50 | $16.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 220 SF | $6.00 | $9.00 | $5.15 | $10.00 | $4.75 | $15.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 10 SF | $35.00 | $10.00 | $7.00 | $20.00 | $9.75 | $40.00 |
| 516E14014 INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 251 FT | $25.00 | $25.00 | $37.00 | $46.00 | $28.00 | $40.00 |
| 516E44001 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 20 EACH | $640 | $513 | $550 | $650 | $790 | $560 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 102 CY | $75.00 | $100 | $82.25 | $100 | $98.00 | $120 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 3 SF | $123 | $300 | $130 | $200 | $100 | $550 |
| 526E90010 TYPE A INSTALLATION | 170 FT | $130 | $230 | $75.00 | $120 | $200 | $160 |
| 607E39900 VANDAL PROTECTION FENCE, 6' STRAIGHT, COATED FABRI | 544 FT | $71.40 | $74.15 | $86.00 | $82.00 | $75.00 | $66.25 |
| 844E10001 CONCRETE PATCHING WITH GALVANIC ANODE PROTECTION, | 18 SF | $265 | $550 | $150 | $200 | $125 | $550 |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 72 CF | $314 | $297 | $305 | $325 | $297 | $340 |
| 202E22900 APPROACH SLAB REMOVED | 268 SY | $25.00 | $50.00 | $21.25 | $24.00 | $41.00 | $60.00 |
| 202E23500 WEARING COURSE REMOVED | 2,552 SY | $4.00 | $5.00 | $4.05 | $6.00 | $3.50 | $3.59 |
| 503E21100 UNCLASSIFIED EXCAVATION | 186 CY | $24.00 | $240 | $150 | $150 | $130 | $240 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 488 EACH | $29.00 | $17.50 | $18.00 | $13.00 | $14.00 | $30.00 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 1,960 SY | $21.00 | $20.69 | $19.00 | $17.00 | $21.58 | $23.50 |
| 512E33000 TYPE 2 WATERPROOFING | 82 SY | $24.00 | $23.00 | $16.00 | $33.00 | $21.00 | $28.00 |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 60 SY | $32.00 | $11.00 | $30.00 | $55.00 | $31.58 | $33.50 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 6,816 EACH | $3.00 | $3.15 | $3.35 | $4.00 | $4.50 | $3.25 |
| 513E21001 TRIMMING OF BEAM END, AS PER PLAN | 16 EACH | $264 | $2,550 | $260 | $100 | $327 | $250 |
| 513E21500 REPLACEMENT OF DETERIORATED END CROSSFRAMES | 4,000 LB | $5.00 | $3.67 | $4.85 | $5.00 | $2.50 | $5.30 |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 632 SF | $84.00 | $91.84 | $95.00 | $100 | $77.32 | $90.00 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 632 SF | $21.00 | $20.41 | $21.00 | $20.00 | $20.62 | $20.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 1,112 SF | $12.00 | $20.41 | $21.00 | $20.00 | $15.46 | $20.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 1,112 SF | $12.00 | $10.20 | $10.50 | $10.00 | $15.46 | $10.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 16 MNHR | $52.00 | $153 | $160 | $150 | $113 | $150 |
| 514E10000 FINAL INSPECTION REPAIR | 4 EACH | $105 | $306 | $310 | $100 | $619 | $300 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 34 SF | $12.00 | $10.00 | $7.25 | $14.00 | $7.00 | $25.00 |
| 516E45305 REFURBISH BEARING DEVICE, AS PER PLAN | 40 EACH | $1,000 | $1,500 | $975 | $400 | $1,310 | $500 |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $19,000 | $22,000 | $25,000 | $5,000 | $40,000 | $18,000 |
| 518E12300 SCUPPERS, INCLUDING SUPPORTS | 28 EACH | $1,300 | $1,050 | $900 | $600 | $1,150 | $1,400 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 104 CY | $80.00 | $115 | $82.00 | $100 | $85.00 | $120 |
| 526E90010 TYPE A INSTALLATION | 128 FT | $120 | $250 | $75.00 | $120 | $220 | $175 |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 54 CF | $300 | $297 | $305 | $335 | $297 | $350 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $35,000 | $25,000 | $50,000 | $63,000 | $45,000 | $100,000 |
| 202E23501 WEARING COURSE REMOVED, AS PER PLAN | 496 SY | $7.00 | $25.00 | $25.00 | $24.00 | $25.00 | $23.26 |
| 202E38500 BRIDGE RAILING REMOVED | 227 FT | $1.97 | $3.50 | $6.00 | $11.00 | $10.00 | $3.50 |
| 407E10001 TACK COAT, AS PER PLAN | 79 GAL | $2.25 | $2.25 | $2.50 | $3.00 | $2.45 | $2.25 |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 17 CY | $900 | $900 | $930 | $520 | $980 | $900 |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (24 CY | $700 | $700 | $490 | $480 | $762 | $700 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 7,994 LB | $0.90 | $1.00 | $0.80 | $0.96 | $1.00 | $0.95 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 100 LB | $0.90 | $2.00 | $2.00 | $1.00 | $2.00 | $1.50 |
| 511E32210 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 24 CY | $1,500 | $1,900 | $1,050 | $1,500 | $2,300 | $1,800 |
| 511E45710 CLASS QC1 CONCRETE, ABUTMENT | 1 CY | $1,800 | $2,760 | $1,350 | $1,000 | $1,500 | $5,050 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 121 SY | $21.00 | $20.69 | $20.00 | $29.00 | $21.58 | $23.50 |
| 512E33010 TYPE 3 WATERPROOFING | 496 SY | $32.00 | $30.00 | $20.00 | $35.00 | $30.00 | $30.00 |
| 517E70000 RAILING (TWIN STEEL TUBE) | 227 FT | $150 | $141 | $165 | $170 | $270 | $141 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 270.19 FT | $23.00 | $15.00 | $8.00 | $15.00 | $11.00 | $20.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $31,000 | $55,000 | $40,000 | $30,000 | $25,000 | $55,000 |
| 619E16020 FIELD OFFICE, TYPE C | 14 MNTH | $2,500 | $1,500 | $2,000 | $3,000 | $3,000 | $2,400 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $21,000 | $20,000 | $40,000 | $40,000 | $45,000 | $25,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 511E21522 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE | 706 CY | $650 | $459k | 10% |
| 513E10260 STRUCTURAL STEEL MEMBERS, LEVEL 3 | 294,600 LB | $1.2 | $354k | 8% |
| 511E21522 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE | 403 CY | $750 | $302k | 7% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 269,176 LB | $0.85 | $229k | 5% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $180,000 | $180k | 4% |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 2,979 SY | $45.5 | $136k | 3% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $135,000 | $135k | 3% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 142,771 LB | $0.9 | $128k | 3% |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $125,000 | $125k | 3% |
| 526E25011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 460 SY | $265 | $122k | 3% |