CUY-IR 90-16.45
CUY County · est $2.5M
Bid dateThursday, January 25—
CUY County · est $2.5M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 64 more items below.
| Item | Quantity | R1Burton Scot Contractors LLC | R2Kokosing Construction Company INC | % of bid |
|---|---|---|---|---|
| 442E10001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 7,807 CY | $160 | $225 | 51% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 1 | 186,303 SY | $1.75 | $2.50 | 13% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $224,000 | $497,000 | 9% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100,000 | 4% |
| 442E00100 ANTI-SEGREGATION EQUIPMENT | 6,539 CY | $10.00 | $1.50 | 3% |
| 407E20000 NON-TRACKING TACK COAT | 16,815 GAL | $2.90 | $2.50 | 2% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 654 CY | $65.00 | $90.00 | 2% |
| 251E01021 |
| Item | Quantity | R1Burton Scot Contractors LLC | R2Kokosing Construction Company INC |
|---|---|---|---|
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 2 EACH | $195 | $195 |
| 209E60201 LINEAR GRADING, AS PER PLAN | 378 STA | $30.00 | $125 |
| 606E13000 GUARDRAIL, TYPE 5 | 316.5 FT | $19.00 | $19.00 |
| 606E26100 ANCHOR ASSEMBLY, TYPE E | 1 EACH | $2,495 | $2,495 |
| 606E35100 BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 1 EACH | $590 | $590 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 650 SY |
| $65.00 |
| $206 |
| 2% |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 16,260 LB | $2.50 | $1.35 | 2% |
| 611E99151 INLET ADJUSTED TO GRADE, AS PER PLAN | 55 EACH | $725 | $800 | 2% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 250 CY | $150 | $120 | 2% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 600 HOUR | $59.00 | $60.00 | 1% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 35 SNMT | $1,000 | $1,200 | 1% |
| 646E10010 EDGE LINE, 6" | 13.38 MILE | $2,195 | $2,950 | 1% |
| 621E00100 RPM | 1,227 EACH | $22.75 | $25.00 | 1% |
| 253E02000 PAVEMENT REPAIR | 75 CY | $325 | $900 | 1% |
| 251E01021 PARTIAL DEPTH PAVEMENT REPAIR (442), AS PER PLAN A | 500 SY | $42.00 | $112 | 1% |
| 614E11500 WORKSITE TRAFFIC SUPERVISOR | 7 MNTH | $3,000 | $3,000 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $20,000 | $15,000 | 1% |
| 618E40601 RUMBLE STRIPS, (ASPHALT CONCRETE), AS PER PLAN | 8.85 MILE | $2,174 | $1,600 | 1% |
| 611E98631 CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN | 25 EACH | $650 | $750 |
| 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE | 2 EACH | $1,600 | $1,400 |
| 611E99154 INLET RECONSTRUCTED TO GRADE | 5 EACH | $1,800 | $1,450 |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 25 EACH | $700 | $700 |
| 611E99660 MANHOLE RECONSTRUCTED TO GRADE | 2 EACH | $1,800 | $1,425 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 5,000 LB | $1.75 | $1.30 |
| 638E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN | 3 EACH | $575 | $525 |
| 620E00500 DELINEATOR, POST GROUND MOUNTED | 150 EACH | $55.00 | $45.00 |
| 620E31200 REMOVAL OF DELINEATOR | 90 EACH | $5.00 | $10.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 60 FT | $15.00 | $15.00 |
| 630E20600 OVERHEAD SIGN SUPPORT, TYPE TC-12.30, DESIGN 6 | 1 EACH | $11,600 | $11,600 |
| 630E80100 SIGN, FLAT SHEET | 48 SF | $25.00 | $25.00 |
| 630E80224 SIGN, OVERHEAD EXTRUSHEET | 495 SF | $20.00 | $20.00 |
| 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION | 1 EACH | $4,800 | $4,800 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 3 EACH | $25.00 | $25.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 4 EACH | $35.00 | $35.00 |
| 630E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL | 6 EACH | $200 | $200 |
| 630E97800 SIGNING, MISC.: ADDITIONAL SIGNS, GROUND MOUNTED, | 300 SF | $17.00 | $25.00 |
| 644E00300 CENTER LINE | 0.03 MILE | $4,735 | $7,500 |
| 644E00400 CHANNELIZING LINE, 8" | 1,677 FT | $1.15 | $0.95 |
| 644E00500 STOP LINE | 243 FT | $4.65 | $6.00 |
| 644E00600 CROSSWALK LINE | 1,516 FT | $2.65 | $2.75 |
| 644E00700 TRANSVERSE/DIAGONAL LINE, YELLOW | 534 FT | $4.50 | $5.50 |
| 644E01300 LANE ARROW | 54 EACH | $65.00 | $90.00 |
| 644E01410 WORD ON PAVEMENT, 96" | 5 EACH | $100 | $125 |
| 644E50100 PAVEMENT MARKING, MISC.: WRONG WAY ARROW | 18 EACH | $125 | $153 |
| 646E10110 LANE LINE, 6" | 9.97 MILE | $1,160 | $1,800 |
| 646E10310 CHANNELIZING LINE, 12" | 7,459 FT | $1.95 | $2.50 |
| 646E10620 CHEVRON MARKING | 836 FT | $8.50 | $8.00 |
| 646E20350 LANE REDUCTION ARROW | 3 EACH | $250 | $275 |
| 646E20504 DOTTED LINE, 6" | 1,368 FT | $1.75 | $1.50 |
| 646E20510 DOTTED LINE, 12" | 7,340 FT | $1.85 | $1.70 |
| 690E98400 SPECIAL - INVENTORY EXISTING PAVEMENT MARKINGS | 1 LS | $1,855 | $750 |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 5 EACH | $1,200 | $1,200 |
| 614E12484 WORK ZONE INCREASED PENALTIES SIGN | 21 EACH | $85.00 | $175 |
| 614E20101 WORK ZONE LANE LINE, CLASS I, 4", 642 PAINT, AS PE | 9.88 MILE | $375 | $600 |
| 614E20550 WORK ZONE LANE LINE, CLASS III, 4", 642 PAINT | 9.88 MILE | $310 | $500 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 0.03 MILE | $635 | $1,200 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.03 MILE | $570 | $1,200 |
| 614E22101 WORK ZONE EDGE LINE, CLASS I, 4", 642 PAINT, AS PE | 13.22 MILE | $495 | $700 |
| 614E22350 WORK ZONE EDGE LINE, CLASS III, 4", 642 PAINT | 13.22 MILE | $425 | $600 |
| 614E23201 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 642 PAIN | 8,334 FT | $0.55 | $1.10 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 8,334 FT | $0.50 | $0.85 |
| 614E24201 WORK ZONE DOTTED LINE, CLASS I, 642 PAINT, AS PER | 5,432 FT | $0.70 | $0.90 |
| 614E24201 WORK ZONE DOTTED LINE, CLASS I, 642 PAINT, AS PER | 1,652 FT | $0.65 | $0.70 |
| 614E24610 WORK ZONE DOTTED LINE, CLASS III, 642 PAINT | 7,084 FT | $0.60 | $0.70 |
| 614E25200 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS I, 642 P | 534 FT | $2.25 | $1.50 |
| 614E25620 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS III, 642 | 534 FT | $2.20 | $1.50 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 243 FT | $2.50 | $3.00 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 243 FT | $2.40 | $3.00 |
| 614E27200 WORK ZONE CROSSWALK LINE, CLASS I, 642 PAINT | 1,466 FT | $2.05 | $1.70 |
| 614E27620 WORK ZONE CROSSWALK LINE, CLASS III, 642 PAINT | 1,466 FT | $2.00 | $1.70 |
| 614E30200 WORK ZONE ARROW, CLASS I, 642 PAINT | 54 EACH | $45.00 | $50.00 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 54 EACH | $40.00 | $50.00 |
| 614E31650 WORK ZONE WORD ON PAVEMENT, 96", CLASS I, 642 PAIN | 5 EACH | $55.00 | $65.00 |
| 614E31670 WORK ZONE WORD ON PAVEMENT, 96", CLASS III, 642 PA | 5 EACH | $50.00 | $65.00 |
| 108E30000 CPM PROGRESS SCHEDULE SHORT DURATION PROJECTS | 1 LS | $2,500 | $2,500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,000 | $7,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E10001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 7,807 CY | $160 | $1.25M | 46% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 1 | 186,303 SY | $1.75 | $326k | 12% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $224,000 | $224k | 8% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 4% |
| 442E00100 ANTI-SEGREGATION EQUIPMENT | 6,539 CY | $10 | $65k | 2% |
| 407E20000 NON-TRACKING TACK COAT | 16,815 GAL | $2.9 | $49k | 2% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 654 CY | $65 | $43k | 2% |
| 251E01021 PARTIAL DEPTH PAVEMENT REPAIR (442), AS PER PLAN B | 650 SY | $65 | $42k | 2% |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 16,260 LB | $2.5 | $41k | 2% |
| 611E99151 INLET ADJUSTED TO GRADE, AS PER PLAN | 55 EACH | $725 | $40k | 1% |