HIG-SR 134-14.43 & 15.38
HIG County · est $1.2M
Bid dateThursday, January 25—
HIG County · est $1.2M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 10.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 58 more items below.
| Item | Quantity | R1Sunesis Construction CO | R2George J Igel & CO INC | R3Eagle Bridge CO | R4Complete General Construction Company | R5Shelly & Sands INC | R6Double Z Construction Company | R7Coopers Excavating LLC | R8John R Jurgensen Company | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|
| 515E12110 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 8 EACH | $25,427 | $25,100 | $26,100 | $25,800 | $24,300 | $27,000 | $26,500 | $29,342 | 25% |
| 611E53900 82" X 128" CONDUIT, TYPE A, 706.04 | 80 FT | $1,144 | $1,100 | $1,700 | $1,100 |
| Item | Quantity | R1Sunesis Construction CO | R2George J Igel & CO INC | R3Eagle Bridge CO | R4Complete General Construction Company | R5Shelly & Sands INC | R6Double Z Construction Company | R7Coopers Excavating LLC | R8John R Jurgensen Company |
|---|---|---|---|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 254 SY | $11.22 | $8.00 | $10.00 | $5.00 | $5.00 | $12.00 | $12.00 | $13.33 |
| 202E38000 GUARDRAIL REMOVED | 1,463 FT | $2.07 | $1.50 | $1.00 | $1.50 | $2.10 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $1,265 |
| $1,200 |
| $1,500 |
| $1,433 |
| 11% |
| 511E31610 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 92 CY | $771 | $830 | $625 | $520 | $1,030 | $775 | $725 | $825 | 9% |
| 624E10000 MOBILIZATION | 1 LS | $46,800 | $40,000 | $40,000 | $40,000 | $40,000 | $60,000 | $65,000 | $10,211 | 6% |
| 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING | 113 CY | $365 | $410 | $300 | $640 | $595 | $525 | $525 | $574 | 5% |
| 504E11101 STEEL SHEET PILING LEFT IN PLACE, AS PER PLAN | 1,200 SF | $33.22 | $22.00 | $35.00 | $35.00 | $42.00 | $31.67 | $34.00 | $7.33 | 5% |
| 526E25000 REINFORCED CONCRETE APPROACH SLABS (T=15") | 178 SY | $199 | $220 | $210 | $185 | $225 | $225 | $285 | $283 | 4% |
| 203E20000 EMBANKMENT | 1,893 CY | $18.43 | $20.00 | $15.00 | $15.00 | $16.50 | $25.00 | $23.30 | $10.46 | 4% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 100 CY | $287 | $245 | $170 | $140 | $165 | $125 | $175 | $197 | 3% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 30,191 LB | $0.88 | $0.90 | $0.65 | $0.85 | $0.80 | $1.00 | $1.05 | $0.77 | 3% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 150 CY | $170 | $210 | $170 | $170 | $179 | $170 | $165 | $196 | 3% |
| 503E21301 UNCLASSIFIED EXCAVATION, AS PER PLAN | 1 LS | $24,931 | $30,000 | $35,000 | $30,000 | $33,000 | $45,000 | $15,000 | $51,701 | 3% |
| 202E11002 STRUCTURE REMOVED, OVER 20 FOOT SPAN | 1 LS | $21,970 | $55,700 | $40,000 | $35,000 | $37,000 | $40,000 | $60,000 | $80,144 | 3% |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 219 CY | $100 | $80.00 | $65.00 | $65.00 | $73.00 | $85.00 | $125 | $91.37 | 3% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 212.83 FT | $102 | $115 | $102 | $132 | $105 | $115 | $155 | $105 | 3% |
| 253E01000 PAVEMENT REPAIR | 150 SY | $141 | $90.00 | $128 | $128 | $128 | $128 | $66.00 | $101 | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $17,870 | $20,000 | $14,000 | $20,000 | $19,700 | $8,000 | $16,000 | $23,776 | 2% |
| 832E30000 EROSION CONTROL | 17,584 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 202E11001 STRUCTURE REMOVED, AS PER PLAN | 1 LS | $16,154 | $12,000 | $22,500 | $20,000 | $26,200 | $28,000 | $17,370 | $15,193 | 2% |
| 606E15050 GUARDRAIL, TYPE MGS | 1,025 FT | $15.60 | $14.48 | $15.64 | $14.48 | $16.00 | $14.48 | $16.50 | $15.60 | 2% |
| $1.50 |
| $2.50 |
| $5.00 |
| 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A | 8 EACH | $162 | $200 | $150 | $200 | $240 | $200 | $400 | $250 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 4 EACH | $244 | $65.00 | $150 | $65.00 | $105 | $65.00 | $400 | $150 |
| 203E10000 EXCAVATION | 238 CY | $21.98 | $15.00 | $28.00 | $13.00 | $19.50 | $25.00 | $26.30 | $27.64 |
| 204E10000 SUBGRADE COMPACTION | 638 SY | $3.73 | $5.00 | $6.00 | $9.00 | $2.60 | $6.50 | $2.00 | $8.21 |
| 606E26100 ANCHOR ASSEMBLY, TYPE E | 8 EACH | $1,910 | $1,835 | $1,914 | $1,835 | $2,000 | $1,835 | $2,100 | $1,910 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $1,860 | $1,945 | $1,864 | $1,945 | $1,900 | $1,945 | $1,800 | $1,860 |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $4,176 | $7,220 | $8,500 | $9,000 | $890 | $10,000 | $6,000 | $7,500 |
| 659E00300 TOPSOIL | 126 CY | $27.87 | $30.00 | $10.00 | $25.00 | $25.00 | $25.00 | $78.00 | $33.64 |
| 659E10000 SEEDING AND MULCHING | 7,011 SY | $2.23 | $2.00 | $1.50 | $0.75 | $0.92 | $2.50 | $0.90 | $0.90 |
| 659E14000 REPAIR SEEDING AND MULCHING | 351 SY | $0.75 | $0.60 | $1.25 | $0.75 | $0.60 | $0.60 | $0.60 | $0.60 |
| 659E20000 COMMERCIAL FERTILIZER | 0.95 TON | $750 | $605 | $1,000 | $750 | $610 | $605 | $605 | $605 |
| 659E31000 LIME | 1.45 ACRE | $200 | $60.00 | $10.00 | $200 | $63.00 | $60.00 | $60.00 | $60.00 |
| 659E35000 WATER | 37.9 MGAL | $1.00 | $1.00 | $10.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 670E00500 SLOPE EROSION PROTECTION | 1,133 SY | $1.95 | $1.84 | $2.25 | $1.95 | $1.90 | $1.84 | $1.84 | $1.84 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,095 | $1,095 | $5,500 | $10,200 | $1,200 | $1,000 | $7,500 | $4,335 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $2,540 | $18,000 | $15,000 | $15,000 | $16,200 | $9,480 | $13,500 | $13,475 |
| 605E31100 AGGREGATE DRAINS | 72 FT | $18.52 | $16.00 | $7.00 | $15.00 | $16.00 | $15.00 | $15.00 | $12.55 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 95 FT | $3.16 | $6.00 | $5.00 | $10.00 | $2.40 | $5.00 | $10.00 | $5.00 |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 44 CY | $260 | $250 | $261 | $260 | $270 | $260 | $280 | $256 |
| 304E20000 AGGREGATE BASE | 46 CY | $70.34 | $90.00 | $65.00 | $75.00 | $95.00 | $90.00 | $85.00 | $114 |
| 407E10000 TACK COAT | 87 GAL | $2.00 | $6.00 | $2.00 | $2.00 | $2.10 | $2.00 | $9.00 | $2.50 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 64 CY | $77.28 | $55.00 | $90.00 | $65.00 | $80.00 | $115 | $75.00 | $89.34 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 28 CY | $400 | $400 | $401 | $400 | $420 | $400 | $395 | $875 |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 22 CY | $400 | $260 | $401 | $400 | $420 | $400 | $290 | $387 |
| 621E00100 RPM | 8 EACH | $213 | $215 | $306 | $305 | $225 | $438 | $213 | $438 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 8 EACH | $1.00 | $20.00 | $8.03 | $20.00 | $30.00 | $15.00 | $5.00 | $23.51 |
| 626E00112 BARRIER REFLECTOR, TYPE 3 (BI-DIRECTIONAL) | 21 EACH | $14.00 | $7.05 | $14.03 | $7.05 | $14.50 | $15.00 | $9.00 | $14.00 |
| 642E00090 EDGE LINE, 4" | 0.19 MILE | $8,755 | $8,755 | $8,775 | $8,755 | $12,000 | $8,755 | $11,530 | $11,530 |
| 642E00290 CENTER LINE | 0.09 MILE | $16,544 | $16,544 | $16,582 | $16,544 | $12,000 | $16,544 | $11,675 | $11,675 |
| 407E10000 TACK COAT | 270 GAL | $2.00 | $6.00 | $2.00 | $2.00 | $2.00 | $2.00 | $9.00 | $2.50 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 8 HOUR | $75.00 | $73.50 | $65.00 | $85.00 | $72.00 | $65.00 | $50.00 | $72.07 |
| 616E10000 WATER | 9 MGAL | $29.22 | $16.00 | $10.00 | $60.00 | $20.00 | $30.00 | $1.00 | $41.08 |
| 202E23500 WEARING COURSE REMOVED | 331 SY | $6.44 | $16.00 | $9.00 | $20.00 | $21.00 | $10.00 | $5.00 | $4.52 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $6,556 | $15,000 | $22,500 | $15,000 | $22,700 | $25,000 | $500 | $71,957 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $13,255 | $8,500 | $11,000 | $15,000 | $18,000 | $25,000 | $15,000 | $26,223 |
| 507E00200 STEEL PILES HP12X53, FURNISHED | 525 FT | $29.67 | $30.00 | $35.00 | $25.00 | $21.60 | $25.00 | $22.95 | $25.66 |
| 507E00250 STEEL PILES HP12X53, DRIVEN | 455 FT | $21.66 | $10.00 | $7.00 | $30.00 | $22.00 | $17.00 | $5.00 | $25.00 |
| 507E93300 STEEL POINTS OR SHOES | 14 EACH | $119 | $100 | $125 | $90.00 | $95.00 | $130 | $90.00 | $108 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 168 SY | $23.00 | $23.00 | $23.00 | $23.00 | $24.00 | $23.00 | $25.00 | $23.00 |
| 512E33000 TYPE 2 WATERPROOFING | 116 SY | $22.50 | $20.00 | $20.00 | $30.00 | $23.00 | $25.00 | $17.50 | $22.50 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 55 SF | $2.25 | $6.00 | $5.00 | $10.00 | $19.60 | $16.00 | $2.50 | $5.28 |
| 516E14014 INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 87 FT | $35.10 | $30.00 | $28.00 | $50.00 | $35.00 | $25.00 | $31.00 | $50.00 |
| 516E41100 1/8" PREFORMED BEARING PAD | 32 EACH | $17.06 | $18.00 | $8.00 | $150 | $12.00 | $30.00 | $12.00 | $32.10 |
| 516E43200 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY ( | 32 EACH | $168 | $125 | $140 | $125 | $301 | $130 | $150 | $175 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 74 CY | $70.14 | $65.00 | $75.00 | $75.00 | $72.00 | $115 | $125 | $50.34 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 244 FT | $14.50 | $20.00 | $12.50 | $14.50 | $17.00 | $15.00 | $11.50 | $14.50 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 112 FT | $2.92 | $8.00 | $10.00 | $10.00 | $6.00 | $10.00 | $2.00 | $5.70 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 28 FT | $11.76 | $10.00 | $10.00 | $15.00 | $10.00 | $16.00 | $2.00 | $20.50 |
| 526E90011 TYPE A INSTALLATION, AS PER PLAN | 64 FT | $116 | $200 | $200 | $550 | $154 | $250 | $141 | $183 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 2 EACH | $374 | $215 | $200 | $250 | $325 | $250 | $250 | $191 |
| 601E32010 ROCK CHANNEL PROTECTION, TYPE A WITH AGGREGATE FIL | 44 CY | $92.65 | $59.00 | $70.00 | $90.00 | $91.00 | $90.00 | $125 | $84.33 |
| 602E20000 CONCRETE MASONRY | 8.08 CY | $847 | $800 | $1,650 | $550 | $1,930 | $1,800 | $1,000 | $1,387 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,431 | $6,000 | $12,500 | $12,000 | $6,600 | $8,000 | $35,000 | $7,213 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $8,633 | $4,000 | $4,500 | $8,000 | $6,600 | $6,250 | $15,000 | $18,004 |
| 619E16010 FIELD OFFICE, TYPE B | 4 MNTH | $1,651 | $3,500 | $2,000 | $1,800 | $2,610 | $1,800 | $1,000 | $1,724 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,800 | $7,800 | $4,000 | $5,000 | $20,900 | $13,000 | $10,000 | $8,104 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 515E12110 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 8 EACH | $25,427 | $203k | 19% |
| 611E53900 82" X 128" CONDUIT, TYPE A, 706.04 | 80 FT | $1,144 | $92k | 9% |
| 511E31610 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 92 CY | $771.4 | $71k | 7% |
| 624E10000 MOBILIZATION | 1 LS | $46,800 | $47k | 4% |
| 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING | 113 CY | $364.89 | $41k | 4% |
| 504E11101 STEEL SHEET PILING LEFT IN PLACE, AS PER PLAN | 1,200 SF | $33.22 | $40k | 4% |
| 526E25000 REINFORCED CONCRETE APPROACH SLABS (T=15") | 178 SY | $199.34 | $35k | 3% |
| 203E20000 EMBANKMENT | 1,893 CY | $18.43 | $35k | 3% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 100 CY | $286.5 | $29k | 3% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 30,191 LB | $0.88 | $27k | 3% |