CHP-US 36-08.04
CHP County · est $0.9M
Bid dateThursday, February 1—
CHP County · est $0.9M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 10%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 48 more items below.
| Item | Quantity | R1Brumbaugh Construction INC | R2Complete General Construction Company | R3George J Igel & CO INC | R4Eagle Bridge CO | R5Shelly & Sands INC | R6Double Z Construction Company | R7Armstrong Steel Erectors INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 515E12050 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 20 EACH | $7,700 | $7,500 | $9,160 | $7,500 | $8,525 | $9,000 | $8,250 | 23% |
| 511E34447 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK, AS PER | 170 CY | $800 | $430 | $590 | $650 | $604 | $570 | $685 | 20% |
| Item | Quantity | R1Brumbaugh Construction INC | R2Complete General Construction Company | R3George J Igel & CO INC | R4Eagle Bridge CO | R5Shelly & Sands INC | R6Double Z Construction Company | R7Armstrong Steel Erectors INC |
|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,000 | $2,000 | $450 | $4,000 | $3,616 | $2,500 | $5,000 |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 303 SY | $14.00 | $6.50 | $8.00 | $12.00 | $19.00 | $12.00 | $8.00 |
| 202E23500 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 515E12050 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 10 EACH | $7,700 | $9,500 | $9,480 | $7,500 | $9,358 | $8,300 | $8,250 | 12% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $50,000 | $55,000 | $42,000 | $111,000 | $46,000 | $85,000 | $85,000 | 8% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 296 FT | $135 | $131 | $107 | $106 | $114 | $105 | $107 | 6% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 27,955 LB | $1.00 | $0.80 | $0.98 | $1.00 | $0.84 | $1.00 | $0.95 | 4% |
| 526E10011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 134 SY | $185 | $195 | $250 | $190 | $224 | $195 | $245 | 4% |
| 507E71200 SPECIAL - PILE ENCASEMENT | 140 FT | $150 | $175 | $248 | $140 | $125 | $190 | $175 | 3% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 89 CY | $185 | $172 | $217 | $172 | $233 | $172 | $222 | 2% |
| 601E32000 ROCK CHANNEL PROTECTION, TYPE A WITH FILTER | 228 CY | $67.00 | $85.00 | $77.00 | $85.00 | $82.00 | $75.00 | $95.00 | 2% |
| 511E45710 CLASS QC1 CONCRETE, ABUTMENT | 24 CY | $600 | $1,250 | $620 | $700 | $1,173 | $725 | $750 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $13,597 | $20,000 | $20,000 | $20,000 | $20,000 | $27,000 | $20,000 | 2% |
| 614E12420 DETOUR SIGNING | 1 LS | $12,500 | $11,575 | $8,500 | $11,500 | $8,815 | $8,000 | $18,500 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $10,000 | $9,000 | $4,016 | $8,000 | $4,860 | $6,000 | $7,500 | 2% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (38 CY | $260 | $240 | $236 | $241 | $254 | $240 | $253 | 1% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 47 CY | $200 | $186 | $235 | $186 | $268 | $186 | $242 | 1% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 4 EACH | $2,300 | $1,860 | $2,000 | $1,980 | $2,116 | $1,975 | $2,000 | 1% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.25" | 795 SY | $10.50 | $7.00 | $3.50 | $7.02 | $6.00 | $7.00 | $3.50 | 1% |
| 516E43100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY ( | 120 EACH | $65.00 | $85.00 | $63.00 | $100 | $86.00 | $72.00 | $85.00 | 1% |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $1,800 | $1,945 | $1,850 | $1,924 | $1,957 | $1,920 | $1,850 | 1% |
| 819 SY |
| $8.50 |
| $8.50 |
| $3.00 |
| $5.00 |
| $7.00 |
| $9.00 |
| $6.00 |
| 202E38001 GUARDRAIL REMOVED, AS PER PLAN | 137.5 FT | $4.00 | $1.60 | $2.00 | $1.50 | $3.00 | $2.00 | $2.00 |
| 202E38500 BRIDGE RAILING REMOVED | 287.5 FT | $12.00 | $3.20 | $5.00 | $6.40 | $8.00 | $9.34 | $5.00 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 4 EACH | $350 | $125 | $150 | $125 | $159 | $150 | $150 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 4 EACH | $250 | $60.00 | $55.00 | $50.12 | $59.00 | $55.00 | $55.00 |
| 203E10000 EXCAVATION | 66 CY | $20.00 | $30.00 | $29.50 | $40.00 | $22.00 | $40.00 | $17.50 |
| 203E20000 EMBANKMENT | 99 CY | $25.00 | $35.00 | $32.75 | $30.00 | $17.00 | $40.00 | $25.00 |
| 204E10000 SUBGRADE COMPACTION | 367 SY | $1.00 | $15.00 | $5.00 | $10.00 | $3.00 | $8.00 | $5.00 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 106.25 FT | $25.00 | $19.20 | $16.50 | $17.89 | $18.00 | $17.85 | $16.50 |
| 659E10000 SEEDING AND MULCHING | 886 SY | $2.00 | $2.94 | $1.61 | $3.00 | $2.10 | $3.75 | $1.95 |
| 659E10100 SEEDING AND MULCHING FOR WILDLIFE | 911 SY | $3.00 | $4.55 | $3.64 | $3.00 | $2.50 | $4.25 | $2.20 |
| 659E14000 REPAIR SEEDING AND MULCHING | 90 SY | $2.00 | $2.00 | $1.61 | $1.25 | $1.00 | $1.55 | $0.58 |
| 659E20000 COMMERCIAL FERTILIZER | 0.25 TON | $650 | $625 | $780 | $1,000 | $487 | $750 | $460 |
| 659E31000 LIME | 0.37 ACRE | $5.00 | $90.00 | $208 | $1.00 | $74.00 | $200 | $70.00 |
| 659E35000 WATER | 10 MGAL | $5.00 | $1.00 | $10.50 | $10.00 | $1.05 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 1,630 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 304E20000 AGGREGATE BASE | 75 CY | $45.00 | $80.00 | $69.00 | $100 | $69.00 | $85.00 | $70.00 |
| 407E10000 TACK COAT | 149 GAL | $3.25 | $3.00 | $9.25 | $3.01 | $4.00 | $3.00 | $8.07 |
| 617E10100 COMPACTED AGGREGATE | 50 CY | $50.00 | $75.00 | $77.00 | $90.00 | $71.00 | $105 | $90.00 |
| 618E41000 EDGE LINE, RUMBLE STRIPE (ASPHALT CONCRETE) | 0.13 MILE | $31,500 | $29,250 | $29,250 | $27,000 | $30,936 | $29,250 | $37,250 |
| 618E43000 CENTER LINE, RUMBLE STRIPE (ASPHALT CONCRETE) | 0.07 MILE | $31,500 | $29,250 | $29,250 | $27,000 | $30,939 | $29,250 | $36,250 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 6 EACH | $50.00 | $30.00 | $14.50 | $10.00 | $39.00 | $10.00 | $30.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 8 EACH | $10.00 | $6.50 | $7.50 | $10.02 | $7.00 | $10.00 | $7.50 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 31 FT | $25.00 | $18.00 | $10.00 | $10.02 | $20.00 | $10.00 | $10.00 |
| 630E80101 SIGN, FLAT SHEET, AS PER PLAN | 1.3 SF | $100 | $40.00 | $35.00 | $50.12 | $43.00 | $50.00 | $35.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $50.00 | $45.00 | $60.00 | $45.10 | $48.00 | $45.00 | $60.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $50.00 | $10.00 | $15.00 | $20.05 | $11.00 | $20.00 | $15.00 |
| 646E10010 EDGE LINE, 6" | 0.2 MILE | $11,000 | $15,358 | $10,230 | $9,001 | $9,498 | $8,980 | $8,980 |
| 646E10200 CENTER LINE | 0.2 MILE | $22,000 | $8,722 | $20,460 | $5,112 | $5,394 | $5,100 | $5,100 |
| 202E22900 APPROACH SLAB REMOVED | 178 SY | $20.00 | $43.00 | $34.50 | $30.00 | $27.00 | $35.00 | $45.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $6,500 | $22,000 | $15,000 | $25,000 | $32,841 | $30,000 | $35,000 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $5,500 | $10,000 | $10,000 | $10,000 | $15,695 | $9,500 | $5,000 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 180 EACH | $21.00 | $12.00 | $24.50 | $12.00 | $19.00 | $25.00 | $25.00 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 165 SY | $30.00 | $25.00 | $18.50 | $25.00 | $27.00 | $34.00 | $25.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 40 SF | $5.00 | $15.00 | $7.00 | $10.00 | $28.00 | $15.00 | $8.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 120 FT | $24.00 | $45.00 | $24.50 | $28.00 | $40.00 | $30.00 | $28.00 |
| 516E31011 2" DEEP JOINT SEALER, AS PER PLAN | 93 FT | $10.00 | $20.00 | $16.50 | $15.00 | $12.00 | $15.00 | $25.00 |
| 516E41100 1/8" PREFORMED BEARING PAD | 60 EACH | $30.00 | $38.00 | $15.50 | $8.00 | $9.00 | $26.00 | $25.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 32 CY | $60.00 | $150 | $102 | $80.00 | $96.00 | $90.00 | $95.00 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 348 FT | $11.00 | $14.00 | $8.50 | $12.00 | $15.00 | $15.00 | $15.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 120 FT | $8.00 | $10.00 | $7.50 | $10.00 | $6.00 | $8.00 | $8.50 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 38 FT | $8.00 | $12.00 | $9.25 | $10.00 | $9.00 | $20.00 | $12.50 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 51 SF | $90.00 | $125 | $80.00 | $140 | $133 | $100 | $125 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $2,500 | $3,000 | $7,610 | $5,000 | $4,408 | $4,000 | $2,500 |
| 619E16000 FIELD OFFICE, TYPE A | 3 MNTH | $1,600 | $2,000 | $2,750 | $1,500 | $3,062 | $1,800 | $1,500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,000 | $2,500 | $3,500 | $4,000 | $8,394 | $6,000 | $3,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 515E12050 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 20 EACH | $7,700 | $154k | 20% |
| 511E34447 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK, AS PER | 170 CY | $800 | $136k | 18% |
| 515E12050 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 10 EACH | $7,700 | $77k | 10% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $50,000 | $50k | 6% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 296 FT | $135 | $40k | 5% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 27,955 LB | $1 | $28k | 4% |
| 526E10011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 134 SY | $185 | $25k | 3% |
| 507E71200 SPECIAL - PILE ENCASEMENT | 140 FT | $150 | $21k | 3% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 89 CY | $185 | $16k | 2% |
| 601E32000 ROCK CHANNEL PROTECTION, TYPE A WITH FILTER | 228 CY | $67 | $15k | 2% |