ERI-US 250-04.06
ERI County · est $4.2M
Bid dateThursday, February 1—
ERI County · est $4.2M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 89 more items below.
| Item | Quantity | R1Kokosing Construction Company INC | R2Erie Blacktop INC | R3Gerken Paving INC | % of bid |
|---|---|---|---|---|---|
| 442E00200 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 15,793 CY | $142 | $138 | $140 | 62% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 1,700 CY | $180 | $180 | $170 | 8% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.50 INCH) | 370,129 SY | $0.65 | $0.90 | $1.05 | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $177,490 | $140,000 | $180,000 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100,000 |
| Item | Quantity | R1Kokosing Construction Company INC | R2Erie Blacktop INC | R3Gerken Paving INC |
|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 131 SY | $13.00 | $13.25 | $13.00 |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 17 SY | $38.50 | $42.00 | $38.50 |
| 202E32000 CURB REMOVED | 91 FT | $7.50 | $7.90 | $7.50 |
| 202E32500 CURB AND GUTTER REMOVED | 117 FT | $11.00 | $11.55 | $11.00 |
| 202E38000 GUARDRAIL REMOVED | 887.5 FT | $1.60 | $1.70 | $1.60 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $100,000 |
| 3% |
| 255E10160 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 655 SY | $120 | $126 | $120 | 2% |
| 407E20000 NON-TRACKING TACK COAT | 30,593 GAL | $2.50 | $2.15 | $1.90 | 2% |
| 617E10100 COMPACTED AGGREGATE | 1,262 CY | $45.00 | $42.00 | $45.00 | 2% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 451 CY | $120 | $125 | $145 | 1% |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 46 EACH | $975 | $1,000 | $975 | 1% |
| 621E00100 RPM | 2,257 EACH | $18.75 | $19.35 | $18.40 | 1% |
| 442E20100 ASPHALT CONCRETE INTERMEDIATE COURSE, 9.5 MM, TYPE | 255 CY | $160 | $174 | $190 | 1% |
| 408E10001 PRIME COAT, AS PER PLAN | 7,895 GAL | $3.50 | $3.20 | $3.00 | 1% |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 32.82 MILE | $750 | $790 | $462 | 1% |
| 209E60500 LINEAR GRADING | 13.29 MILE | $1,850 | $1,225 | $850 | 1% |
| 253E02000 PAVEMENT REPAIR | 100 CY | $225 | $220 | $170 | 1% |
| 202E30801 TRAFFIC ISLAND REMOVED, AS PER PLAN | 1,591 SY | $13.75 | $13.50 | $13.75 | 1% |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 4,806 FT | $4.00 | $4.20 | $4.65 | 1% |
| 304E20000 AGGREGATE BASE | 306 CY | $60.00 | $52.50 | $44.00 | 1% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 260 HOUR | $60.00 | $63.00 | $75.00 | 0% |
| 202E38200 GUARDRAIL REMOVED FOR REUSE | 525 FT | $2.00 | $2.10 | $2.00 |
| 202E38201 GUARDRAIL REMOVED FOR REUSE, AS PER PLAN | 200 FT | $10.40 | $11.00 | $10.40 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 8 EACH | $130 | $137 | $130 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 5 EACH | $65.00 | $68.25 | $65.00 |
| 202E42810 ANCHOR ASSEMBLY REMOVED FOR REUSE, TYPE E | 9 EACH | $145 | $152 | $145 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 6 EACH | $50.00 | $52.50 | $50.00 |
| 202E47200 BRIDGE TERMINAL ASSEMBLY REMOVED FOR REUSE | 4 EACH | $65.00 | $68.25 | $65.00 |
| 203E10000 EXCAVATION | 115 CY | $34.50 | $30.00 | $22.00 |
| 203E20000 EMBANKMENT | 68 CY | $36.00 | $38.00 | $36.00 |
| 203E20001 EMBANKMENT, AS PER PLAN | 130 CY | $49.80 | $52.50 | $49.80 |
| 204E10000 SUBGRADE COMPACTION | 1,941 SY | $1.30 | $0.75 | $1.20 |
| 209E15000 RESHAPING UNDER GUARDRAIL | 24.75 STA | $50.00 | $52.50 | $50.00 |
| 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA | 2.53 MILE | $3,250 | $1,800 | $2,000 |
| 209E80000 GRADING MAILBOX APPROACHES | 35 EACH | $10.00 | $200 | $125 |
| 606E13030 GUARDRAIL, TYPE 5, USING 9 FOOT POSTS | 200 FT | $17.60 | $18.50 | $17.60 |
| 606E15050 GUARDRAIL, TYPE MGS | 912.5 FT | $14.40 | $15.25 | $14.40 |
| 606E16500 GUARDRAIL REBUILT, TYPE 5 | 525 FT | $8.80 | $9.25 | $8.80 |
| 606E17000 RAISING TYPE 5 GUARDRAIL | 125 FT | $4.40 | $4.75 | $4.40 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 8 EACH | $1,795 | $1,900 | $1,795 |
| 606E26500 ANCHOR ASSEMBLY, TYPE T | 3 EACH | $670 | $705 | $670 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 2 EACH | $750 | $790 | $750 |
| 606E27850 ANCHOR ASSEMBLY REBUILT, TYPE E | 9 EACH | $935 | $985 | $935 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 3 EACH | $1,920 | $2,020 | $1,920 |
| 606E35010 BRIDGE TERMINAL ASSEMBLY REBUILT, TYPE 1 | 4 EACH | $780 | $820 | $780 |
| 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 3 EACH | $345 | $365 | $345 |
| 608E10000 4" CONCRETE WALK | 737 SF | $4.00 | $4.20 | $4.00 |
| 608E52000 CURB RAMP | 100 SF | $7.75 | $8.15 | $7.75 |
| 623E39500 MONUMENT BOX ADJUSTED TO GRADE | 24 EACH | $350 | $625 | $500 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $100 | $105 | $100 |
| 659E00300 TOPSOIL | 44 CY | $38.00 | $50.00 | $38.00 |
| 659E10000 SEEDING AND MULCHING | 400 SY | $1.50 | $1.60 | $1.50 |
| 659E14000 REPAIR SEEDING AND MULCHING | 20 SY | $5.00 | $5.25 | $5.00 |
| 659E15000 INTER-SEEDING | 20 SY | $5.00 | $5.25 | $5.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.05 TON | $800 | $840 | $800 |
| 659E31000 LIME | 0.08 ACRE | $600 | $630 | $600 |
| 659E35000 WATER | 2.21 MGAL | $50.00 | $52.50 | $50.00 |
| 660E30000 SODDING UNSTAKED | 15 SY | $25.00 | $26.25 | $25.00 |
| 832E30000 EROSION CONTROL | 500 EACH | $1.00 | $1.00 | $1.00 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 17 EACH | $765 | $805 | $765 |
| 611E98635 CATCH BASIN RECONSTRUCTED TO GRADE, AS PER PLAN | 2 EACH | $2,800 | $2,950 | $2,800 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 4 EACH | $600 | $750 | $725 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (VAR. DEPTH) | 5,034 SY | $2.00 | $0.90 | $1.15 |
| 254E01600 PATCHING PLANED SURFACE | 1,877 SY | $1.50 | $5.75 | $2.00 |
| 255E10161 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 50 SY | $160 | $168 | $160 |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 3,049 FT | $3.50 | $3.70 | $3.50 |
| 257E10000 DIAMOND GRINDING PORTLAND CEMENT CONCRETE PAVEMENT | 2,088 SY | $5.50 | $7.05 | $4.25 |
| 442E00200 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 37 CY | $142 | $130 | $140 |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 117 FT | $25.00 | $26.25 | $25.00 |
| 609E26000 CURB, TYPE 6 | 32 FT | $19.50 | $20.50 | $19.50 |
| 617E20000 SHOULDER PREPARATION | 16,766 SY | $0.20 | $0.30 | $0.12 |
| 618E41000 EDGE LINE, RUMBLE STRIPE (ASPHALT CONCRETE) | 1.25 MILE | $1,025 | $1,080 | $725 |
| 618E41001 EDGE LINE, RUMBLE STRIPE (ASPHALT CONCRETE), AS PE | 14.77 MILE | $1,025 | $1,080 | $725 |
| 618E43000 CENTER LINE, RUMBLE STRIPE (ASPHALT CONCRETE) | 1.26 MILE | $1,025 | $1,080 | $725 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 2,196 EACH | $1.00 | $7.10 | $4.50 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 6 EACH | $6.50 | $6.85 | $6.50 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (ONE WAY) | 41 EACH | $6.45 | $6.80 | $6.45 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 1 FT | $35.00 | $36.75 | $35.00 |
| 630E80100 SIGN, FLAT SHEET | 10 SF | $30.00 | $31.50 | $30.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 14 EACH | $10.00 | $10.50 | $10.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 6 EACH | $10.00 | $10.50 | $10.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 17.7 MILE | $610 | $641 | $522 |
| 642E00204 LANE LINE, 6", TYPE 1 | 14.82 MILE | $475 | $500 | $305 |
| 642E00300 CENTER LINE, TYPE 1 | 16.26 MILE | $835 | $880 | $608 |
| 644E00400 CHANNELIZING LINE, 8" | 8,009 FT | $1.30 | $1.40 | $1.45 |
| 644E00500 STOP LINE | 858 FT | $5.35 | $5.65 | $5.50 |
| 644E00900 ISLAND MARKING | 216 SF | $4.00 | $4.20 | $3.90 |
| 644E01300 LANE ARROW | 158 EACH | $70.00 | $73.50 | $78.00 |
| 644E01350 LANE REDUCTION ARROW | 3 EACH | $170 | $180 | $245 |
| 644E01500 DOTTED LINE, 4" | 366 FT | $1.20 | $1.30 | $1.15 |
| 644E40000 SPECIAL - AIR SPEED ZONE MARKING | 2 EACH | $950 | $1,750 | $725 |
| 646E10010 EDGE LINE, 6" | 0.06 MILE | $30,000 | $7,300 | $25,000 |
| 646E10200 CENTER LINE | 0.15 MILE | $30,000 | $10,500 | $25,000 |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 23 FT | $48.00 | $8.50 | $8.00 |
| 614E12420 DETOUR SIGNING | 1 LS | $7,450 | $7,850 | $11,250 |
| 614E12460 WORK ZONE MARKING SIGN | 15 EACH | $90.00 | $95.00 | $90.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 50 CY | $110 | $260 | $200 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 11 SNMT | $900 | $945 | $1,200 |
| 614E20550 WORK ZONE LANE LINE, CLASS III, 4", 642 PAINT | 29.64 MILE | $425 | $450 | $183 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 29.64 MILE | $495 | $520 | $327 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 16,018 FT | $0.40 | $0.45 | $0.35 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 910 FT | $2.50 | $2.65 | $2.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $12,000 | $16,200 | $19,000 |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $1,500 | $1,900 | $2,200 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,500 | $7,060 | $15,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E00200 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 15,793 CY | $142 | $2.24M | 56% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 1,700 CY | $180 | $306k | 8% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.50 INCH) | 370,129 SY | $0.65 | $241k | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $177,490 | $177k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 3% |
| 255E10160 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 655 SY | $120 | $79k | 2% |
| 407E20000 NON-TRACKING TACK COAT | 30,593 GAL | $2.5 | $76k | 2% |
| 617E10100 COMPACTED AGGREGATE | 1,262 CY | $45 | $57k | 1% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 451 CY | $120 | $54k | 1% |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 46 EACH | $975 | $45k | 1% |