SEN-SR 19/SR 101-09.57/01.64
SEN County · est $1.7M
Bid dateThursday, February 1—
SEN County · est $1.7M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 6%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 60 more items below.
| Item | Quantity | R1M & B Asphalt CO INC | R2Gerken Paving INC | R3Kokosing Construction Company INC | R4Erie Blacktop INC | % of bid |
|---|---|---|---|---|---|---|
| 424E12001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B, AS P | 4,243 CY | $154 | $154 | $178 | $168 | 45% |
| 253E02000 PAVEMENT REPAIR | 2,373 CY | $155 | $150 | $140 | $170 | 25% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 468 CY | $185 | $180 | $209 | $200 | 6% |
| 611E20700 48" CONDUIT, TYPE A | 92 FT | $438 | $300 | $350 | $460 | 3% |
| Item | Quantity | R1M & B Asphalt CO INC | R2Gerken Paving INC | R3Kokosing Construction Company INC | R4Erie Blacktop INC |
|---|---|---|---|---|---|
| 209E60500 LINEAR GRADING | 20 MILE | $250 | $150 | $1,275 | $1,100 |
| 623E38500 MONUMENT ASSEMBLY | 2 EACH | $2,500 | $1,350 | $1,250 | $1,200 |
| 659E10000 SEEDING AND MULCHING | 2,129.6 SY | $1.95 | $1.85 | $1.85 | $1.05 |
| 659E14000 REPAIR SEEDING AND MULCHING | 106.48 SY | $1.00 | $1.85 | $1.85 | $3.15 |
| 659E20000 COMMERCIAL FERTILIZER |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 617E10100 COMPACTED AGGREGATE | 648 CY | $57.00 | $52.00 | $75.00 | $55.00 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $36,000 | $40,000 | $40,000 | $40,000 | 2% |
| 407E20000 NON-TRACKING TACK COAT | 13,407 GAL | $2.10 | $1.90 | $2.10 | $2.10 | 2% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 256 SY | $100 | $100 | $110 | $105 | 2% |
| 202E23500 WEARING COURSE REMOVED | 3,472 SY | $7.25 | $7.75 | $1.60 | $10.00 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE( 1-1/2") | 8,937 SY | $2.50 | $2.65 | $1.90 | $1.85 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $20,000 | $57,000 | $81,700 | $60,000 | 1% |
| 621E00100 RPM | 645 EACH | $30.00 | $21.40 | $21.40 | $22.50 | 1% |
| 848E10201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 256 SY | $61.95 | $61.95 | $90.00 | $65.05 | 1% |
| 203E20000 EMBANKMENT | 459 CY | $32.85 | $32.00 | $20.00 | $34.50 | 1% |
| 602E20000 CONCRETE MASONRY | 8.5 CY | $1,615 | $1,750 | $1,200 | $1,700 | 1% |
| 642E00094 EDGE LINE, 6" | 20.2 MILE | $650 | $551 | $650 | $685 | 1% |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 20.2 MILE | $600 | $650 | $300 | $685 | 1% |
| 659E00300 TOPSOIL | 237 CY | $50.00 | $9.00 | $28.00 | $31.50 | 1% |
| 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING | 112.5 FT | $79.20 | $79.20 | $90.00 | $83.50 | 1% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 31.46 CY | $275 | $230 | $310 | $195 | 1% |
| 0.29 TON |
| $710 |
| $600 |
| $600 |
| $735 |
| 659E31000 LIME | 0.44 ACRE | $110 | $13.20 | $30.00 | $5.00 |
| 659E35000 WATER | 11.5 MGAL | $1.00 | $11.50 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E05200 12" CONDUIT, TYPE F, DRAIN TILE | 30 FT | $16.90 | $45.00 | $50.00 | $17.75 |
| 875E10000 LONGITUDINAL JOINT ADHESIVE (L/6) | 8,729 LB | $0.35 | $1.00 | $0.50 | $1.55 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 645 EACH | $6.00 | $14.00 | $10.00 | $12.00 |
| 642E00290 CENTER LINE | 10.1 MILE | $750 | $459 | $750 | $790 |
| 614E12460 WORK ZONE MARKING SIGN | 10 EACH | $210 | $150 | $150 | $158 |
| 614E12500 REPLACEMENT SIGN | 5 EACH | $50.00 | $150 | $150 | $158 |
| 614E12600 REPLACEMENT DRUM | 5 EACH | $35.00 | $60.00 | $60.00 | $63.00 |
| 614E21400 WORK ZONE CENTER LINE, CLASS II | 10.1 MILE | $450 | $500 | $90.00 | $525 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $7,669 | $7,661 | $7,500 | $8,045 |
| 503E21100 UNCLASSIFIED EXCAVATION | 3 CY | $68.33 | $68.33 | $75.00 | $71.75 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 1,996 LB | $1.80 | $1.80 | $1.75 | $1.90 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 100 LB | $1.80 | $1.80 | $5.00 | $1.90 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 158 EACH | $12.78 | $12.78 | $25.00 | $13.45 |
| 511E34412 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE | 7 CY | $1,216 | $1,216 | $1,500 | $1,280 |
| 511E45712 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT | 3 CY | $1,423 | $1,423 | $1,300 | $1,495 |
| 511E60000 SPECIAL - BRIDGE DECK GROOVING | 240 SY | $14.60 | $14.60 | $12.50 | $15.35 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 28 SY | $15.97 | $15.97 | $32.00 | $16.80 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 10 SF | $4.34 | $4.34 | $12.00 | $4.55 |
| 517E70000 RAILING (TWIN STEEL TUBE) | 52 FT | $145 | $145 | $150 | $152 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 48 FT | $9.56 | $9.56 | $12.00 | $10.05 |
| 530E00200 SPECIAL - STRUCTURES , SURVEY OF EXISTING STRUCTUR | 1 LS | $492 | $492 | $2,000 | $517 |
| 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE | 3 CY | $228 | $228 | $215 | $239 |
| 848E50000 HAND CHIPPING | 15 SY | $113 | $113 | $115 | $119 |
| 848E50100 TEST SLAB | 1 LS | $645 | $645 | $1,600 | $680 |
| 202E11000 STRUCTURE REMOVED | 1 LS | $3,267 | $6,500 | $8,500 | $3,435 |
| 203E10000 EXCAVATION | 182 CY | $8.85 | $12.00 | $12.00 | $9.30 |
| 304E20000 AGGREGATE BASE | 23.59 CY | $91.85 | $120 | $100 | $96.45 |
| 407E20000 NON-TRACKING TACK COAT | 178.36 GAL | $2.10 | $1.90 | $2.10 | $2.05 |
| 424E12001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B, AS P | 3.93 CY | $155 | $154 | $178 | $168 |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (7.86 CY | $320 | $260 | $950 | $375 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 12 CY | $114 | $125 | $125 | $120 |
| 202E38602 BRIDGE RAILING REMOVED FOR REUSE | 100 FT | $4.80 | $4.80 | $10.00 | $5.05 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, VARIES | 918 SY | $3.50 | $4.25 | $1.60 | $5.95 |
| 407E20000 NON-TRACKING TACK COAT | 86 GAL | $2.10 | $1.90 | $2.10 | $2.05 |
| 424E12001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B, AS P | 26 CY | $155 | $154 | $178 | $168 |
| 516E31200 SPECIAL - SAWING AND SEALING BITUMINOUS CONCRETE J | 132 FT | $17.42 | $17.42 | $20.00 | $18.30 |
| 517E75501 BRIDGE RAILING REBUILT, AS PER PLAN | 100 FT | $55.80 | $55.80 | $40.00 | $58.60 |
| 517E75601 DEEP BEAM BRIDGE RETROFIT RAILING, AS PER PLAN | 100 FT | $79.20 | $79.20 | $90.00 | $83.50 |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 53 LB | $0.60 | $1.00 | $0.50 | $1.50 |
| 202E38603 BRIDGE RAILING REMOVED FOR REUSE, AS PER PLAN | 112.5 FT | $4.80 | $4.80 | $10.00 | $5.05 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE ,VARIES | 661 SY | $3.50 | $4.25 | $1.35 | $9.25 |
| 407E20000 NON-TRACKING TACK COAT | 57 GAL | $2.10 | $1.90 | $2.10 | $2.05 |
| 424E12001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B, AS P | 19 CY | $155 | $154 | $178 | $168 |
| 516E31200 SPECIAL - SAWING AND SEALING BITUMINOUS CONCRETE J | 116 FT | $17.42 | $17.42 | $20.00 | $18.30 |
| 517E75501 BRIDGE RAILING REBUILT, AS PER PLAN | 112.5 FT | $55.60 | $55.60 | $40.00 | $58.50 |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 34 LB | $0.60 | $1.00 | $0.50 | $1.50 |
| 407E20000 NON-TRACKING TACK COAT | 36 GAL | $2.10 | $1.90 | $2.10 | $2.05 |
| 424E12001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B, AS P | 12 CY | $155 | $154 | $178 | $170 |
| 516E31200 SPECIAL - SAWING AND SEALING BITUMINOUS CONCRETE J | 134 FT | $17.42 | $17.42 | $20.00 | $18.30 |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 19 LB | $0.60 | $1.00 | $0.50 | $1.50 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $7,800 | $8,000 | $6,480 | $7,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,000 | $10,400 | $10,000 | $6,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 424E12001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B, AS P | 4,243 CY | $153.5 | $651k | 41% |
| 253E02000 PAVEMENT REPAIR | 2,373 CY | $155 | $368k | 23% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 468 CY | $185 | $87k | 5% |
| 611E20700 48" CONDUIT, TYPE A | 92 FT | $437.91 | $40k | 3% |
| 617E10100 COMPACTED AGGREGATE | 648 CY | $57 | $37k | 2% |
| 624E10000 MOBILIZATION | 1 LS | $36,000 | $36k | 2% |
| 407E20000 NON-TRACKING TACK COAT | 13,407 GAL | $2.1 | $28k | 2% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 256 SY | $100.14 | $26k | 2% |
| 202E23500 WEARING COURSE REMOVED | 3,472 SY | $7.25 | $25k | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE( 1-1/2") | 8,937 SY | $2.5 | $22k | 1% |