MED-CULVERT FY2018
MED County · est $0.3M
Bid dateThursday, February 15—
MED County · est $0.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 27 more items below.
| Item | Quantity | R1Stanley Miller Construction Company | R2Rietschlin Construction INC | R3S E T INC | R4Lockhart Concrete CO | R5Eclipse CO LLC | R6Shelly & Sands INC | R7Rudzik Excavating INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 611E94800 8' X 4' CONDUIT, TYPE A, 706.05 | 90 FT | $948 | $900 | $400 | $2,000 | $909 | $969 | $837 | 30% |
| 203E20000 EMBANKMENT | 1,906 CY | $20.35 | $16.50 | $21.00 | $15.00 | $16.90 | $17.00 | $28.70 | 14% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING |
| Item | Quantity | R1Stanley Miller Construction Company | R2Rietschlin Construction INC | R3S E T INC | R4Lockhart Concrete CO | R5Eclipse CO LLC | R6Shelly & Sands INC | R7Rudzik Excavating INC |
|---|---|---|---|---|---|---|---|---|
| 203E10000 EXCAVATION | 286 CY | $8.27 | $13.75 | $25.00 | $15.00 | $14.92 | $8.00 | $25.00 |
| 204E10000 SUBGRADE COMPACTION | 306 SY | $1.00 | $3.50 | $3.00 | $2.00 | $3.21 | $2.00 | $8.00 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 175 FT |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1 LS |
| $17,867 |
| $2,420 |
| $10,500 |
| $11,000 |
| $4,731 |
| $11,000 |
| $10,800 |
| 6% |
| 624E10000 MOBILIZATION | 1 LS | $16,655 | $25,000 | $38,500 | $7,000 | $10,000 | $10,000 | $14,910 | 6% |
| 611E96550 FIELD PAVING OF EXISTING PIPE (60" CMP) | 172 FT | $95.00 | $135 | $150 | $64.00 | $97.07 | $185 | $180 | 6% |
| 442E10501 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 39 CY | $410 | $406 | $390 | $250 | $357 | $250 | $406 | 6% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $9,989 | $8,900 | $13,650 | $14,000 | $8,937 | $20,000 | $33,987 | 4% |
| 304E20000 AGGREGATE BASE | 53 CY | $166 | $100 | $100 | $45.00 | $62.70 | $100 | $91.20 | 3% |
| 202E23000 PAVEMENT REMOVED | 306 SY | $28.00 | $23.00 | $15.00 | $9.00 | $22.25 | $12.00 | $10.00 | 3% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 4 EACH | $2,095 | $2,255 | $2,100 | $1,900 | $2,176 | $2,000 | $2,277 | 3% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 20 CY | $384 | $550 | $990 | $250 | $720 | $1,100 | $1,100 | 3% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $6,856 | $8,200 | $23,000 | $9,000 | $6,554 | $7,800 | $6,000 | 2% |
| 614E12420 DETOUR SIGNING | 1 LS | $6,822 | $3,580 | $10,500 | $9,000 | $2,744 | $2,700 | $5,100 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $6,655 | $11,000 | $8,500 | $9,000 | $14,678 | $12,000 | $4,100 | 2% |
| 659E10000 SEEDING AND MULCHING | 1,681 SY | $3.85 | $2.50 | $2.50 | $1.20 | $1.84 | $2.50 | $2.50 | 2% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $6,378 | $8,000 | $15,500 | $7,000 | $3,680 | $23,000 | $8,000 | 2% |
| 202E70130 SPECIAL - PIPE CLEANOUT OVER 48" | 172 FT | $30.00 | $64.00 | $50.00 | $10.00 | $56.97 | $19.00 | $50.00 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,400 | $4,000 | $5,500 | $4,500 | $20,000 | $2,100 | $4,125 | 2% |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $700 | $1,540 | $750 | $200 | $600 | $2,600 | $750 | 1% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 5 CY | $743 | $1,550 | $990 | $500 | $2,869 | $2,600 | $3,754 | 1% |
| $20.89 |
| $19.25 |
| $22.00 |
| $19.00 |
| $19.77 |
| $20.00 |
| $20.68 |
| 623E38500 MONUMENT ASSEMBLY | 3 EACH | $993 | $700 | $800 | $270 | $859 | $1,150 | $820 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 28 CY | $118 | $115 | $95.00 | $100 | $116 | $140 | $156 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $150 | $55.00 | $105 | $250 | $158 | $80.00 | $55.00 |
| 659E00300 TOPSOIL | 220 CY | $16.68 | $8.00 | $14.00 | $20.00 | $40.47 | $16.00 | $18.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 99 SY | $1.00 | $2.50 | $0.50 | $1.20 | $1.05 | $0.50 | $1.50 |
| 659E15000 INTER-SEEDING | 99 SY | $1.00 | $2.50 | $0.20 | $1.20 | $1.05 | $0.10 | $1.50 |
| 659E20000 COMMERCIAL FERTILIZER | 0.27 TON | $650 | $700 | $375 | $650 | $789 | $380 | $900 |
| 659E31000 LIME | 0.4 ACRE | $500 | $110 | $110 | $450 | $421 | $110 | $500 |
| 659E35000 WATER | 11 MGAL | $1.00 | $11.00 | $1.00 | $1.00 | $10.51 | $1.00 | $1.00 |
| 602E20001 CONCRETE MASONRY, AS PER PLAN | 3 CY | $897 | $800 | $550 | $600 | $1,274 | $930 | $1,327 |
| 605E31100 AGGREGATE DRAINS | 53 FT | $31.25 | $15.00 | $20.00 | $10.00 | $15.34 | $10.00 | $37.33 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (3.00") | 114 SY | $28.90 | $29.00 | $30.00 | $15.00 | $26.29 | $38.00 | $28.60 |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 14 CY | $200 | $198 | $190 | $225 | $1,051 | $385 | $198 |
| 407E10000 TACK COAT | 37 GAL | $2.80 | $2.75 | $3.00 | $5.00 | $80.96 | $2.00 | $2.75 |
| 626E00102 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL) | 8 EACH | $7.00 | $8.25 | $10.00 | $11.00 | $10.51 | $6.00 | $12.10 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.06 MILE | $26,667 | $11,400 | $11,000 | $21,000 | $18,473 | $18,000 | $11,400 |
| 642E00300 CENTER LINE, TYPE 1 | 0.03 MILE | $26,667 | $15,200 | $15,000 | $36,000 | $18,515 | $18,000 | $15,200 |
| 202E35200 PIPE REMOVED, OVER 24" | 40 FT | $25.00 | $422 | $55.00 | $20.00 | $230 | $140 | $100 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 1,248 LB | $2.00 | $3.50 | $2.00 | $1.00 | $3.08 | $2.00 | $1.50 |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 4 CY | $550 | $500 | $990 | $400 | $1,663 | $265 | $310 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 47 SY | $37.55 | $38.50 | $47.00 | $15.00 | $38.51 | $35.00 | $50.00 |
| 512E33000 TYPE 2 WATERPROOFING | 215 SY | $15.84 | $16.50 | $25.00 | $10.00 | $28.27 | $22.00 | $21.01 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 26 SF | $1.45 | $11.00 | $9.00 | $2.00 | $11.43 | $4.00 | $16.75 |
| 518E21230 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 1 LS | $2,940 | $2,900 | $5,500 | $2,000 | $3,881 | $3,000 | $4,945 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E94800 8' X 4' CONDUIT, TYPE A, 706.05 | 90 FT | $948 | $85k | 26% |
| 203E20000 EMBANKMENT | 1,906 CY | $20.35 | $39k | 12% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $17,867 | $18k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $16,655 | $17k | 5% |
| 611E96550 FIELD PAVING OF EXISTING PIPE (60" CMP) | 172 FT | $95 | $16k | 5% |
| 442E10501 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 39 CY | $410 | $16k | 5% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $9,989 | $10k | 3% |
| 304E20000 AGGREGATE BASE | 53 CY | $166 | $9k | 3% |
| 202E23000 PAVEMENT REMOVED | 306 SY | $28 | $9k | 3% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 4 EACH | $2,095 | $8k | 3% |