MIA-US 36-11.34
MIA County · est $1.7M
Bid dateThursday, February 15—
MIA County · est $1.7M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 9%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 115 more items below.
| Item | Quantity | R1Complete General Construction Company | R2Shelly & Sands INC | R3Global Outdoor Solutions | R4Eagle Bridge CO | R5R B Jergens Contractors INC | R6Great Lakes Construction CO | % of bid |
|---|---|---|---|---|---|---|---|---|
| 848E10100 LATEX MODIFIED CONCRETE OVERLAY USING HYDRODEMOLIT | 3,525 SY | $70.00 | $82.00 | $83.00 | $85.00 | $75.20 | $80.00 | 21% |
| 848E20001 SURFACE PREPARATION USING HYDRODEMOLITION, AS PER | 3,525 SY | $52.00 | $41.00 | $37.00 | $44.00 | $56.00 | $65.00 | 15% |
| 516E11211 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S | 153 FT | $500 |
| Item | Quantity | R1Complete General Construction Company | R2Shelly & Sands INC | R3Global Outdoor Solutions | R4Eagle Bridge CO | R5R B Jergens Contractors INC | R6Great Lakes Construction CO |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,500 | $633 | $4,000 | $4,000 | $4,291 | $40,000 |
| 202E23000 PAVEMENT REMOVED | 1,504 SY | $8.00 | $14.00 | $12.00 | $10.00 | $10.70 | $23.00 |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 788 SY | $10.00 | $13.00 | $13.00 | $5.50 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $505 |
| $500 |
| $500 |
| $627 |
| $530 |
| 6% |
| 511E34449 CLASS QC2 CONCRETE, BRIDGE DECK (PARAPET), AS PER | 89 CY | $850 | $529 | $570 | $750 | $713 | $730 | 6% |
| 517E76201 RAILING FACED, AS PER PLAN | 542 FT | $130 | $65.00 | $130 | $85.00 | $156 | $140 | 6% |
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 407 CY | $158 | $168 | $220 | $158 | $182 | $158 | 5% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $50,000 | $66,225 | $35,000 | $110,000 | $94,545 | $120,000 | 4% |
| 513E95020 STRUCTURAL STEEL, MISC.: REMOVAL, REWELDING, AND | 1 LS | $45,300 | $40,795 | $35,000 | $38,000 | $60,545 | $40,000 | 4% |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 438 SF | $95.00 | $100 | $70.00 | $90.00 | $82.40 | $75.00 | 3% |
| 848E30100 LATEX MODIFIED CONCRETE OVERLAY (VARIABLE THICKNES | 73 CY | $550 | $611 | $725 | $600 | $615 | $630 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40,000 | $40,000 | $40,000 | $30,000 | $40,000 | 3% |
| 622E41000 PORTABLE BARRIER, 32" | 3,710 FT | $9.00 | $12.00 | $12.00 | $10.00 | $11.00 | $8.50 | 3% |
| 304E20000 AGGREGATE BASE | 474 CY | $70.00 | $49.00 | $61.00 | $48.00 | $37.50 | $70.00 | 3% |
| 511E34410 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 15 CY | $2,200 | $2,183 | $700 | $2,100 | $2,723 | $1,168 | 3% |
| 611E04400 12" CONDUIT, TYPE B | 416 FT | $77.00 | $55.00 | $50.00 | $50.00 | $62.80 | $100 | 3% |
| 622E10160 CONCRETE BARRIER, SINGLE SLOPE, TYPE D | 198 FT | $140 | $111 | $140 | $74.00 | $140 | $70.00 | 2% |
| 832E30000 EROSION CONTROL | 27,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 516E45305 REFURBISH BEARING DEVICE, AS PER PLAN | 16 EACH | $1,600 | $1,667 | $520 | $1,500 | $1,189 | $2,000 | 2% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 161 CY | $156 | $166 | $170 | $156 | $180 | $156 | 2% |
| 511E45710 CLASS QC1 CONCRETE, ABUTMENT | 15 CY | $1,650 | $1,958 | $785 | $2,100 | $1,950 | $1,225 | 2% |
| $7.80 |
| $13.00 |
| 202E23500 WEARING COURSE REMOVED | 7,828 SY | $1.75 | $3.00 | $2.50 | $1.75 | $2.00 | $1.75 |
| 202E30000 WALK REMOVED | 195 SF | $2.50 | $2.00 | $6.00 | $2.50 | $2.55 | $2.00 |
| 202E32000 CURB REMOVED | 133 FT | $6.00 | $6.00 | $8.00 | $2.50 | $5.00 | $4.00 |
| 202E32500 CURB AND GUTTER REMOVED | 541 FT | $7.00 | $3.00 | $10.00 | $2.50 | $3.55 | $5.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 108 FT | $15.00 | $13.00 | $10.00 | $7.00 | $9.85 | $30.00 |
| 202E38000 GUARDRAIL REMOVED | 1,147 FT | $1.60 | $3.00 | $3.00 | $2.36 | $2.55 | $2.35 |
| 202E42001 ANCHOR ASSEMBLY REMOVED, TYPE A, AS PER PLAN | 3 EACH | $235 | $291 | $258 | $276 | $297 | $275 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 1 EACH | $75.00 | $159 | $75.00 | $150 | $162 | $150 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 3 EACH | $55.00 | $291 | $125 | $276 | $297 | $275 |
| 202E58100 CATCH BASIN REMOVED | 3 EACH | $319 | $197 | $500 | $150 | $2,397 | $600 |
| 202E58500 CATCH BASIN ABANDONED | 1 EACH | $170 | $915 | $500 | $125 | $1,944 | $650 |
| 202E98100 REMOVAL MISC.: STEEL POST | 2 EACH | $130 | $132 | $200 | $40.00 | $136 | $300 |
| 203E10000 EXCAVATION | 336 CY | $25.00 | $18.00 | $61.00 | $14.00 | $13.40 | $30.00 |
| 203E20000 EMBANKMENT | 706 CY | $12.00 | $12.00 | $19.00 | $17.00 | $11.00 | $20.00 |
| 204E10000 SUBGRADE COMPACTION | 2,587 SY | $2.50 | $3.00 | $4.00 | $2.50 | $1.85 | $3.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 262.5 FT | $19.80 | $18.00 | $22.00 | $16.79 | $18.10 | $16.75 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 2 EACH | $1,925 | $2,223 | $2,400 | $2,105 | $2,269 | $2,100 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $765 | $911 | $850 | $862 | $930 | $860 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 1 EACH | $2,120 | $1,244 | $2,500 | $1,779 | $1,918 | $1,775 |
| 607E98000 FENCE, MISC.: WOOD FENCE | 123 FT | $53.50 | $27.00 | $56.00 | $25.56 | $27.60 | $25.50 |
| 608E10000 4" CONCRETE WALK | 61 SF | $9.00 | $17.00 | $10.00 | $9.68 | $7.50 | $15.00 |
| 608E52001 CURB RAMP, AS PER PLAN | 628 SF | $9.00 | $12.00 | $14.00 | $14.69 | $7.80 | $16.00 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 5 CY | $120 | $143 | $100 | $125 | $169 | $140 |
| 659E00300 TOPSOIL | 386 CY | $30.00 | $23.00 | $70.00 | $10.00 | $37.70 | $30.00 |
| 659E10000 SEEDING AND MULCHING | 2,944 SY | $1.65 | $1.50 | $3.00 | $3.00 | $1.15 | $1.35 |
| 659E14000 REPAIR SEEDING AND MULCHING | 174 SY | $0.40 | $1.50 | $4.00 | $2.00 | $1.15 | $1.35 |
| 659E15000 INTER-SEEDING | 174 SY | $0.10 | $1.00 | $2.00 | $2.00 | $1.15 | $0.60 |
| 659E20000 COMMERCIAL FERTILIZER | 0.48 TON | $635 | $635 | $700 | $1,000 | $654 | $600 |
| 659E31000 LIME | 0.72 ACRE | $100 | $32.00 | $200 | $10.00 | $78.40 | $30.00 |
| 659E35000 WATER | 19 MGAL | $1.00 | $2.00 | $5.00 | $10.00 | $1.05 | $1.00 |
| 670E00700 DITCH EROSION PROTECTION | 529 SY | $2.40 | $3.00 | $4.00 | $3.00 | $2.45 | $2.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,600 | $2,856 | $20,000 | $6,500 | $9,725 | $2,000 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $4,200 | $14,963 | $5,000 | $15,000 | $15,685 | $1,000 |
| 605E11101 6" SHALLOW PIPE UNDERDRAINS, AS PER PLAN | 619 FT | $12.00 | $9.00 | $10.00 | $9.00 | $8.80 | $14.00 |
| 605E14000 6" BASE PIPE UNDERDRAINS | 2,055 FT | $10.00 | $9.00 | $10.00 | $9.00 | $8.70 | $15.00 |
| 611E05900 15" CONDUIT, TYPE B | 5 FT | $150 | $290 | $75.00 | $250 | $270 | $250 |
| 611E10400 24" CONDUIT, TYPE B | 30 FT | $190 | $144 | $85.00 | $175 | $210 | $325 |
| 611E98151 CATCH BASIN, NO. 3, AS PER PLAN | 6 EACH | $2,900 | $3,108 | $2,100 | $2,750 | $2,783 | $3,500 |
| 611E98181 CATCH BASIN, NO. 3A, AS PER PLAN | 1 EACH | $2,700 | $2,891 | $2,200 | $2,500 | $2,543 | $2,500 |
| 611E98470 CATCH BASIN, NO. 2-2B | 1 EACH | $1,800 | $1,731 | $2,200 | $1,250 | $1,370 | $1,400 |
| 611E99574 MANHOLE, NO. 3 | 2 EACH | $4,300 | $3,169 | $4,000 | $3,250 | $2,804 | $3,000 |
| 407E10000 TACK COAT | 775 GAL | $2.50 | $3.00 | $2.00 | $2.51 | $2.90 | $2.50 |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (46 CY | $205 | $217 | $200 | $205 | $236 | $205 |
| 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN | 1,109 FT | $18.00 | $17.00 | $17.50 | $19.21 | $20.50 | $17.00 |
| 609E26000 CURB, TYPE 6 | 1,106 FT | $17.50 | $12.00 | $14.00 | $13.00 | $16.40 | $13.00 |
| 626E00102 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL) | 9 EACH | $9.00 | $8.00 | $10.00 | $7.02 | $7.55 | $7.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 5 EACH | $9.00 | $8.00 | $12.00 | $7.02 | $7.55 | $7.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 168.1 FT | $10.00 | $11.00 | $11.00 | $7.52 | $8.10 | $7.50 |
| 630E80100 SIGN, FLAT SHEET | 38.5 SF | $30.00 | $21.00 | $20.00 | $40.09 | $43.20 | $40.00 |
| 630E80101 SIGN, FLAT SHEET, AS PER PLAN | 1.3 SF | $100 | $106 | $110 | $321 | $346 | $320 |
| 630E85000 REMOVAL OF GROUND MOUNTED SIGN AND STORAGE | 2 EACH | $20.00 | $22.00 | $22.00 | $30.07 | $32.40 | $30.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 6 EACH | $65.00 | $69.00 | $70.00 | $75.17 | $81.10 | $75.00 |
| 630E85101 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, AS | 1 EACH | $650 | $688 | $680 | $75.17 | $81.10 | $75.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 4 EACH | $25.00 | $27.00 | $30.00 | $25.06 | $27.00 | $25.00 |
| 630E86310 REMOVAL OF STRUCTURE MOUNTED SIGN AND DISPOSAL | 2 EACH | $25.00 | $27.00 | $30.00 | $60.14 | $64.80 | $60.00 |
| 630E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL | 1 EACH | $200 | $212 | $250 | $175 | $189 | $175 |
| 630E97700 SIGNING, MISC.: FOUNDATION FOR DECORATIVE SIGN PO | 1 EACH | $500 | $530 | $600 | $1,278 | $1,378 | $1,275 |
| 644E00100 EDGE LINE, 4" | 0.08 MILE | $6,215 | $6,579 | $6,400 | $6,229 | $8,928 | $6,215 |
| 644E00200 LANE LINE, 4" | 0.31 MILE | $5,085 | $5,382 | $5,100 | $5,097 | $7,305 | $5,085 |
| 644E00300 CENTER LINE | 0.48 MILE | $7,965 | $8,431 | $8,200 | $7,983 | $11,440 | $7,965 |
| 644E00400 CHANNELIZING LINE, 8" | 278 FT | $1.15 | $2.00 | $2.00 | $1.15 | $1.65 | $1.15 |
| 644E00500 STOP LINE | 86 FT | $4.65 | $5.00 | $6.00 | $4.66 | $6.70 | $4.65 |
| 644E00601 CROSSWALK LINE, AS PER PLAN | 166 FT | $2.65 | $3.00 | $3.00 | $2.66 | $3.80 | $2.65 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 229 FT | $3.50 | $4.00 | $4.00 | $3.51 | $5.05 | $3.50 |
| 644E00720 CHEVRON MARKING | 32 FT | $4.00 | $5.00 | $5.00 | $4.01 | $5.75 | $4.00 |
| 644E01300 LANE ARROW | 4 EACH | $75.00 | $80.00 | $80.00 | $75.17 | $108 | $75.00 |
| 644E01500 DOTTED LINE, 4" | 105 FT | $1.00 | $2.00 | $2.00 | $1.00 | $1.45 | $1.00 |
| 644E30020 REMOVAL OF PAVEMENT MARKING | 1 EACH | $2,665 | $2,821 | $2,700 | $2,671 | $3,828 | $2,665 |
| 646E10100 LANE LINE, 4" | 0.1 MILE | $21,670 | $22,937 | $24,000 | $21,720 | $31,130 | $21,670 |
| 646E10200 CENTER LINE | 0.11 MILE | $23,955 | $25,356 | $25,000 | $24,010 | $34,410 | $23,955 |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 2 FT | $7.25 | $8.00 | $9.00 | $7.27 | $10.40 | $7.25 |
| 625E25400 CONDUIT, 2", 725.04 | 34 FT | $19.50 | $17.00 | $17.00 | $15.44 | $16.60 | $15.40 |
| 625E25910 CONDUIT CLEANED AND CABLES REMOVED | 124 FT | $2.60 | $2.00 | $1.75 | $1.10 | $1.20 | $1.10 |
| 625E29000 TRENCH | 34 FT | $9.00 | $13.00 | $13.00 | $11.88 | $12.80 | $11.85 |
| 625E31600 PULL BOX, MISC.: PULL BOX CLEANED | 1 EACH | $110 | $104 | $110 | $98.23 | $106 | $98.00 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 376 FT | $2.50 | $3.00 | $3.00 | $2.51 | $2.70 | $2.50 |
| 632E64021 PEDESTAL FOUNDATION, AS PER PLAN | 1 EACH | $2,500 | $1,135 | $1,200 | $1,074 | $1,158 | $1,072 |
| 632E90020 REMOVAL OF MISCELLANEOUS TRAFFIC SIGNAL ITEM: PED | 1 EACH | $500 | $446 | $425 | $422 | $455 | $420 |
| 632E90104 REUSE OF TRAFFIC CONTROL ITEM: PEDESTAL RELOCATED | 1 EACH | $2,000 | $653 | $750 | $618 | $667 | $620 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 20 HOUR | $65.00 | $74.00 | $85.00 | $100 | $71.00 | $70.00 |
| 614E12336 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL) | 3 EACH | $1,800 | $1,906 | $2,000 | $1,804 | $2,196 | $2,000 |
| 614E13001 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, AS PER P | 3 CY | $230 | $265 | $500 | $1,250 | $279 | $250 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, ONE WAY | 73 EACH | $8.00 | $7.00 | $12.00 | $6.00 | $8.35 | $8.00 |
| 614E13312 BARRIER REFLECTOR, TYPE 2, ONE WAY | 9 EACH | $8.00 | $13.00 | $10.00 | $6.00 | $8.35 | $8.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 82 EACH | $11.00 | $9.00 | $12.00 | $8.00 | $10.50 | $11.00 |
| 614E18000 MAINTAINING TRAFFIC, MISC.: TEMPORARY CURB RAMP | 2 EACH | $1,447 | $1,226 | $1,500 | $3,500 | $1,114 | $1,000 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 0.85 MILE | $1,900 | $2,011 | $2,000 | $1,904 | $2,729 | $1,900 |
| 614E22100 WORK ZONE EDGE LINE, CLASS I, 4", 642 PAINT | 1.27 MILE | $1,755 | $1,857 | $1,900 | $1,759 | $2,521 | $1,755 |
| 614E24200 WORK ZONE DOTTED LINE, CLASS I, 642 PAINT | 456 FT | $0.50 | $1.00 | $1.10 | $0.50 | $0.72 | $0.50 |
| 614E25200 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS I, 642 P | 438 FT | $2.25 | $3.00 | $2.25 | $2.26 | $3.25 | $2.25 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 45 FT | $2.50 | $6.00 | $3.00 | $2.51 | $3.60 | $2.50 |
| 614E27200 WORK ZONE CROSSWALK LINE, CLASS I, 642 PAINT | 117 FT | $2.00 | $3.00 | $2.75 | $2.00 | $2.85 | $2.00 |
| 616E10000 WATER | 4 MGAL | $60.00 | $62.00 | $5.00 | $15.00 | $111 | $40.00 |
| 503E21100 UNCLASSIFIED EXCAVATION | 2 CY | $1,500 | $361 | $500 | $500 | $336 | $150 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 16,353 LB | $1.17 | $1.17 | $1.25 | $1.25 | $1.15 | $1.18 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 200 LB | $2.00 | $1.41 | $3.00 | $1.25 | $1.70 | $2.00 |
| 510E10001 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, AS | 1,521 EACH | $11.00 | $19.00 | $17.00 | $12.00 | $15.90 | $25.00 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 856 SY | $18.00 | $19.00 | $21.00 | $18.04 | $23.00 | $20.00 |
| 512E10601 CONCRETE REPAIR BY EPOXY INJECTION, AS PER PLAN | 89 FT | $130 | $85.00 | $60.00 | $65.00 | $111 | $45.00 |
| 516E10000 PREFORMED ELASTOMERIC COMPRESSION JOINT SEAL | 542 FT | $35.00 | $32.00 | $50.00 | $35.00 | $32.30 | $60.00 |
| 516E31001 JOINT SEALER, AS PER PLAN | 139 FT | $20.00 | $7.00 | $17.00 | $20.00 | $7.75 | $20.00 |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $12,000 | $6,084 | $7,000 | $12,500 | $5,984 | $25,000 |
| 518E12801 SCUPPER, MODIFICATION, AS PER PLAN | 36 EACH | $680 | $729 | $850 | $400 | $487 | $600 |
| 848E50000 HAND CHIPPING | 212 SY | $45.00 | $60.00 | $100 | $65.00 | $76.30 | $160 |
| 848E50100 TEST SLAB | 1 LS | $3,500 | $4,482 | $2,000 | $2,500 | $2,266 | $5,000 |
| 848E50200 FULL-DEPTH REPAIR | 1 CY | $1,000 | $1,749 | $100 | $2,000 | $2,041 | $1,500 |
| 848E50320 EXISTING CONCRETE OVERLAY REMOVED (1 3/4" +/- THIC | 3,420 SY | $6.65 | $7.00 | $5.00 | $7.00 | $5.00 | $10.00 |
| 848E50340 REMOVAL OF DEBONDED OR DETERIORATED EXISTING VARIA | 106 SY | $27.00 | $64.00 | $80.00 | $65.00 | $33.60 | $10.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $14,000 | $9,687 | $17,000 | $20,000 | $12,130 | $20,000 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $10,000 | $36,234 | $31,000 | $20,000 | $18,775 | $40,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,000 | $16,796 | $5,000 | $6,500 | $16,305 | $10,000 |
| 619E16010 FIELD OFFICE, TYPE B | 4 MNTH | $3,000 | $3,032 | $1,300 | $2,000 | $1,310 | $3,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 848E10100 LATEX MODIFIED CONCRETE OVERLAY USING HYDRODEMOLIT | 3,525 SY | $70 | $247k | 15% |
| 848E20001 SURFACE PREPARATION USING HYDRODEMOLITION, AS PER | 3,525 SY | $52 | $183k | 11% |
| 516E11211 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S | 153 FT | $500 | $77k | 5% |
| 511E34449 CLASS QC2 CONCRETE, BRIDGE DECK (PARAPET), AS PER | 89 CY | $850 | $76k | 5% |
| 517E76201 RAILING FACED, AS PER PLAN | 542 FT | $130 | $70k | 4% |
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 407 CY | $158 | $64k | 4% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $50,000 | $50k | 3% |
| 513E95020 STRUCTURAL STEEL, MISC.: REMOVAL, REWELDING, AND | 1 LS | $45,300 | $45k | 3% |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 438 SF | $95 | $42k | 2% |
| 848E30100 LATEX MODIFIED CONCRETE OVERLAY (VARIABLE THICKNES | 73 CY | $550 | $40k | 2% |