ROS-US 35-30.82 Slide Repair
ROS County · est $2.6M
Bid dateThursday, March 8—
ROS County · est $2.6M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 6.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 64 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Double Z Construction Company | R3Trucco Construction CO INC | R4Freedom Construction Enterprises, INC | R5Complete General Construction Company | R6Eclipse CO LLC | R7Sunesis Construction CO | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 203E10001 EXCAVATION, AS PER PLAN | 45,476 CY | $9.74 | $7.00 | $8.70 | $9.50 | $8.00 | $15.59 | $17.77 | 25% |
| 203E35001 GRANULAR EMBANKMENT, AS PER PLAN | 4,878 CY | $33.00 | $38.00 | $45.00 | $50.00 | $50.00 | $56.57 | $68.13 | 9% |
| Item | Quantity | R1Shelly & Sands INC | R2Double Z Construction Company | R3Trucco Construction CO INC | R4Freedom Construction Enterprises, INC | R5Complete General Construction Company | R6Eclipse CO LLC | R7Sunesis Construction CO |
|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $6,500 | $43,000 | $10,000 | $8,204 | $30,000 | $29,279 | $33,000 |
| 202E32000 CURB REMOVED | 2,795 FT | $2.50 | $4.00 | $1.00 | $3.00 | $3.00 | $1.26 | $3.06 |
| 202E38000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1,603 CY |
| $96.00 |
| $96.00 |
| $96.00 |
| $137 |
| $127 |
| $126 |
| $96.00 |
| 9% |
| 203E20001 EMBANKMENT, AS PER PLAN | 25,049 CY | $4.25 | $7.00 | $4.00 | $2.30 | $12.00 | $12.95 | $5.71 | 6% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $40,000 | $100,000 | $27,369 | $100,000 | $100,000 | $64,826 | 6% |
| 863E00800 REINFORCED EMBANKMENT | 13,641 CY | $7.00 | $10.00 | $25.20 | $14.00 | $15.00 | $17.47 | $11.70 | 5% |
| 304E20000 AGGREGATE BASE | 1,808 CY | $49.00 | $50.00 | $48.00 | $48.00 | $37.00 | $35.25 | $76.49 | 5% |
| 836E10020 SEEDING AND EROSION CONTROL WITH TURF REINFORCING | 20,695 SY | $3.92 | $6.14 | $4.60 | $5.00 | $2.00 | $4.35 | $6.35 | 5% |
| 622E41000 PORTABLE BARRIER, 32" | 5,590 FT | $14.00 | $15.00 | $12.00 | $18.00 | $13.00 | $18.58 | $17.71 | 4% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 4,494.5 FT | $16.80 | $15.44 | $15.45 | $20.00 | $16.00 | $15.75 | $15.44 | 4% |
| 832E30000 EROSION CONTROL | 55,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 3% |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 7,194 SY | $6.00 | $5.00 | $5.00 | $4.00 | $4.00 | $9.54 | $10.96 | 2% |
| 605E11100 6" SHALLOW PIPE UNDERDRAINS | 3,961 FT | $10.25 | $9.00 | $8.50 | $13.00 | $9.00 | $10.25 | $10.91 | 2% |
| 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 284 CY | $128 | $128 | $128 | $213 | $162 | $165 | $128 | 2% |
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 244 CY | $138 | $138 | $138 | $236 | $183 | $184 | $138 | 2% |
| 605E06000 4" BASE PIPE UNDERDRAINS | 3,927 FT | $8.35 | $7.00 | $6.00 | $10.00 | $5.50 | $8.01 | $7.81 | 2% |
| 605E05201 4" UNCLASSIFIED PIPE UNDERDRAINS, AS PER PLAN. (IT | 7,762 FT | $4.20 | $4.00 | $7.00 | $10.00 | $5.00 | $2.20 | $2.66 | 2% |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $32,000 | $28,000 | $14,000 | $63,000 | $50,000 | $25,000 | $59,740 | 2% |
| 609E24511 CURB, TYPE 4-C, AS PER PLAN | 2,810 FT | $11.00 | $16.00 | $9.00 | $14.00 | $14.00 | $18.54 | $13.74 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $27,500 | $12,000 | $16,000 | $3,544 | $93,000 | $21,421 | $8,500 | 2% |
| 4,712.5 FT |
| $2.00 |
| $1.50 |
| $1.50 |
| $1.00 |
| $1.50 |
| $1.53 |
| $1.50 |
| 204E10000 SUBGRADE COMPACTION | 6,718 SY | $3.50 | $1.00 | $2.00 | $1.00 | $2.00 | $1.96 | $3.66 |
| 204E45000 PROOF ROLLING | 3.4 HOUR | $190 | $100 | $200 | $173 | $90.00 | $192 | $242 |
| 204E50100 GEOTEXTILE FABRIC, 712.09, TYPE A | 23,285 SY | $0.75 | $3.00 | $1.50 | $1.55 | $1.50 | $0.65 | $4.14 |
| 209E60501 LINEAR GRADING, AS PER PLAN | 0.24 MILE | $4,050 | $30,000 | $35,000 | $18,290 | $8,000 | $21,770 | $17,624 |
| 606E15400 MGS GUARDRAIL, TYPE 8 | 175 FT | $25.00 | $23.84 | $23.85 | $30.00 | $23.00 | $24.32 | $23.84 |
| 606E17500 POST END ANCHOR (OR CONCRETE BLOCK END ANCHOR) | 1 EACH | $1,200 | $1,170 | $1,170 | $1,418 | $1,170 | $1,193 | $1,170 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 1 EACH | $2,050 | $1,910 | $1,910 | $2,422 | $1,910 | $1,948 | $1,910 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $500 | $790 | $790 | $945 | $790 | $806 | $790 |
| 863E00700 GEOGRID, TYPE S2 | 8,775 SY | $1.25 | $3.50 | $4.75 | $3.00 | $5.00 | $1.98 | $2.95 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $88.00 | $100 | $100 | $104 | $88.00 | $300 | $300 |
| 659E00300 TOPSOIL | 2,549 CY | $2.87 | $20.00 | $20.00 | $16.00 | $10.00 | $8.58 | $63.80 |
| 659E10000 SEEDING AND MULCHING | 22,955 SY | $0.61 | $0.54 | $0.73 | $1.00 | $0.61 | $0.70 | $1.29 |
| 659E14000 REPAIR SEEDING AND MULCHING | 1,148 SY | $0.68 | $0.35 | $0.73 | $1.00 | $0.68 | $0.50 | $0.50 |
| 659E15000 INTER-SEEDING | 1,148 SY | $0.68 | $0.35 | $0.10 | $1.00 | $0.68 | $0.01 | $0.01 |
| 659E20000 COMMERCIAL FERTILIZER | 3.1 TON | $628 | $600 | $700 | $742 | $628 | $750 | $750 |
| 659E31000 LIME | 4.8 ACRE | $151 | $60.00 | $60.00 | $179 | $152 | $200 | $200 |
| 659E35000 WATER | 124 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 670E00760 DITCH EROSION PROTECTION MAT, TYPE F | 168 SY | $1.19 | $3.60 | $2.00 | $1.00 | $1.19 | $5.00 | $5.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,075 | $1,200 | $1,075 | $4,430 | $6,300 | $2,117 | $4,150 |
| 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1 | 30 SY | $100 | $170 | $180 | $161 | $127 | $69.90 | $168 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 4 CY | $325 | $200 | $130 | $296 | $115 | $87.93 | $169 |
| 602E20000 CONCRETE MASONRY | 1 CY | $2,000 | $2,500 | $3,000 | $2,516 | $1,600 | $1,905 | $2,332 |
| 611E00406 4" CONDUIT, TYPE F, 707.33 | 1,130 FT | $7.75 | $14.00 | $15.00 | $13.00 | $27.00 | $8.38 | $11.40 |
| 611E00410 4" CONDUIT, TYPE F FOR UNDERDRAIN OUTLET | 98 FT | $13.20 | $14.00 | $21.00 | $13.00 | $13.07 | $14.94 | $29.95 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 271 FT | $13.20 | $14.00 | $23.00 | $16.00 | $14.00 | $15.58 | $30.40 |
| 611E05900 15" CONDUIT, TYPE B | 297 FT | $59.00 | $59.00 | $48.00 | $34.00 | $60.00 | $60.45 | $61.03 |
| 611E06100 15" CONDUIT, TYPE C | 45 FT | $55.00 | $45.00 | $48.00 | $32.00 | $60.00 | $53.52 | $102 |
| 611E06700 15" CONDUIT, TYPE F | 109 FT | $68.00 | $60.00 | $55.00 | $33.00 | $60.00 | $40.70 | $96.88 |
| 611E98150 CATCH BASIN, NO. 3 | 1 EACH | $2,750 | $3,000 | $3,500 | $2,768 | $2,300 | $2,308 | $3,278 |
| 611E98180 CATCH BASIN, NO. 3A | 5 EACH | $2,100 | $2,500 | $2,500 | $2,768 | $2,500 | $1,641 | $2,152 |
| 611E99570 MANHOLE, NO. 2 | 1 EACH | $2,600 | $3,000 | $8,000 | $3,319 | $3,100 | $2,059 | $3,102 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 24 EACH | $260 | $400 | $300 | $256 | $300 | $225 | $281 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 4,160 FT | $1.93 | $2.00 | $1.90 | $2.00 | $3.00 | $1.93 | $1.65 |
| 407E10000 TACK COAT | 643 GAL | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 441E50701 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (31 CY | $130 | $130 | $130 | $354 | $375 | $390 | $130 |
| 442E00100 ANTI-SEGREGATION EQUIPMENT | 527 CY | $12.00 | $12.00 | $12.00 | $30.00 | $9.00 | $9.00 | $12.00 |
| 618E40600 RUMBLE STRIPS, (ASPHALT CONCRETE) | 1.02 MILE | $3,950 | $3,950 | $3,950 | $6,911 | $5,650 | $4,000 | $9,626 |
| 621E00100 RPM (LANE LINE ONE-WAY) | 85 EACH | $33.50 | $33.45 | $33.50 | $77.00 | $37.00 | $34.12 | $36.97 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 107 EACH | $15.00 | $10.00 | $23.50 | $4.00 | $10.00 | $10.78 | $16.32 |
| 626E00112 BARRIER REFLECTOR, TYPE 3 (ONE-WAY) | 49 EACH | $7.50 | $6.50 | $6.50 | $9.00 | $8.00 | $6.63 | $6.50 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 28 FT | $10.00 | $10.00 | $10.00 | $12.00 | $10.00 | $10.20 | $10.00 |
| 630E80100 SIGN, FLAT SHEET | 12 SF | $16.50 | $20.00 | $20.00 | $19.00 | $19.00 | $20.40 | $20.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 1 EACH | $15.00 | $10.00 | $10.00 | $18.00 | $20.00 | $10.20 | $10.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $15.00 | $10.00 | $10.00 | $18.00 | $25.00 | $10.20 | $10.00 |
| 644E00104 EDGE LINE, 6" (WHITE) | 1.77 MILE | $3,360 | $2,888 | $2,888 | $3,591 | $2,888 | $2,946 | $3,360 |
| 644E00104 EDGE LINE, 6" (YELLOW) | 1.77 MILE | $3,360 | $2,888 | $2,888 | $3,591 | $2,888 | $2,946 | $3,360 |
| 644E00204 LANE LINE, 6" | 1.74 MILE | $1,667 | $1,416 | $1,416 | $2,256 | $1,416 | $1,444 | $1,667 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 64 HOUR | $70.00 | $70.00 | $75.00 | $77.00 | $70.00 | $66.30 | $72.00 |
| 614E11630 INCREASED BARRIER DELINEATION | 5,590 FT | $0.35 | $1.00 | $1.00 | $1.00 | $1.10 | $2.55 | $2.50 |
| 614E12336 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL) | 2 EACH | $1,900 | $1,850 | $1,900 | $2,953 | $1,900 | $1,938 | $2,304 |
| 614E12484 WORK ZONE INCREASED PENALTIES SIGN | 2 EACH | $150 | $500 | $250 | $177 | $185 | $189 | $185 |
| 614E13314 BARRIER REFLECTOR, TYPE 3 (ONE-WAY) | 118 EACH | $9.00 | $10.00 | $9.00 | $12.00 | $9.00 | $9.18 | $10.58 |
| 614E13350 OBJECT MARKER, ONE WAY | 118 EACH | $20.00 | $10.00 | $11.00 | $18.00 | $11.00 | $11.22 | $10.58 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 10 SNMT | $875 | $600 | $850 | $2,036 | $2,200 | $918 | $900 |
| 614E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 10 SNMT | $550 | $500 | $600 | $1,131 | $850 | $867 | $850 |
| 614E22350 WORK ZONE EDGE LINE, CLASS III, 4", 642 PAINT | 1.67 MILE | $1,215 | $715 | $715 | $1,435 | $715 | $1,000 | $1,215 |
| 614E24610 WORK ZONE DOTTED LINE, CLASS III, 642 PAINT | 1,680 FT | $1.00 | $0.52 | $0.50 | $1.00 | $0.52 | $0.77 | $1.00 |
| 616E10000 WATER | 169 MGAL | $25.00 | $10.00 | $50.00 | $28.00 | $50.00 | $10.00 | $12.34 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $11,450 | $20,000 | $20,000 | $52,300 | $19,000 | $76,983 | $16,566 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $10,750 | $50,000 | $15,000 | $23,270 | $70,000 | $25,559 | $21,385 |
| 619E16000 FIELD OFFICE, TYPE A | 6 MNTH | $2,250 | $1,200 | $1,800 | $2,424 | $2,750 | $800 | $1,853 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 203E10001 EXCAVATION, AS PER PLAN | 45,476 CY | $9.74 | $443k | 22% |
| 203E35001 GRANULAR EMBANKMENT, AS PER PLAN | 4,878 CY | $33 | $161k | 8% |
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 1,603 CY | $96 | $154k | 8% |
| 203E20001 EMBANKMENT, AS PER PLAN | 25,049 CY | $4.25 | $106k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 5% |
| 863E00800 REINFORCED EMBANKMENT | 13,641 CY | $7 | $95k | 5% |
| 304E20000 AGGREGATE BASE | 1,808 CY | $49 | $89k | 4% |
| 836E10020 SEEDING AND EROSION CONTROL WITH TURF REINFORCING | 20,695 SY | $3.92 | $81k | 4% |
| 622E41000 PORTABLE BARRIER, 32" | 5,590 FT | $14 | $78k | 4% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 4,494.5 FT | $16.8 | $76k | 4% |