SAN-SR 412/SR 590-04.70/00.00
SAN County · est $1.7M
Bid dateThursday, March 8—
SAN County · est $1.7M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 79 more items below.
| Item | Quantity | R1M & B Asphalt CO INC | R2Gerken Paving INC | R3Erie Blacktop INC | R4Kokosing Construction Company INC | % of bid |
|---|---|---|---|---|---|---|
| 424E12001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B, AS P | 4,957 CY | $160 | $150 | $155 | $166 | 55% |
| 253E01000 PAVEMENT REPAIR, 8" | 2,675 SY | $27.25 | $36.00 | $38.00 | $42.00 | 5% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (566 CY | $127 | $134 | $115 | $116 | 5% |
| 511E34410 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 56 CY | $1,026 | $1,026 | $1,077 | $1,026 |
| Item | Quantity | R1M & B Asphalt CO INC | R2Gerken Paving INC | R3Erie Blacktop INC | R4Kokosing Construction Company INC |
|---|---|---|---|---|---|
| 202E23500 WEARING COURSE REMOVED | 1,896 SY | $6.00 | $7.00 | $8.00 | $3.00 |
| 202E38000 GUARDRAIL REMOVED | 1,223 FT | $1.50 | $1.50 | $1.60 | $2.00 |
| 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A | 7 EACH | $235 | $235 | $246 | $275 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 2 EACH | $70.00 | $70.00 | $73.50 | $70.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 4% |
| 253E01000 PAVEMENT REPAIR, 6" | 2,710 SY | $20.00 | $24.00 | $25.50 | $28.00 | 4% |
| 526E25010 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 156 SY | $282 | $282 | $296 | $282 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40,000 | $40,000 | $40,000 | 3% |
| 617E10100 COMPACTED AGGREGATE | 681 CY | $52.00 | $55.00 | $45.00 | $45.00 | 2% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $35,000 | $34,524 | $36,250 | $34,524 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 2" | 20,373 SY | $1.65 | $1.50 | $0.95 | $1.60 | 2% |
| 407E20000 NON-TRACKING TACK COAT | 15,352 GAL | $2.10 | $1.90 | $2.10 | $2.00 | 2% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 168 SY | $188 | $188 | $198 | $188 | 2% |
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 113 CY | $200 | $250 | $350 | $250 | 2% |
| 848E10201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 168 SY | $119 | $119 | $125 | $119 | 1% |
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 90 CY | $210 | $150 | $118 | $175 | 1% |
| 606E15050 GUARDRAIL, TYPE MGS | 1,207.5 FT | $15.60 | $15.60 | $16.50 | $15.80 | 1% |
| 621E00100 RPM | 702 EACH | $25.00 | $20.25 | $24.15 | $20.25 | 1% |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 390 SF | $45.00 | $45.00 | $47.25 | $45.00 | 1% |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIME | 390 SF | $45.00 | $45.00 | $47.25 | $45.00 | 1% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 114.92 FT | $138 | $138 | $144 | $142 | 1% |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 8 EACH | $60.00 | $60.00 | $63.00 | $100 |
| 202E53100 MAILBOX REMOVED | 1 EACH | $15.00 | $135 | $15.75 | $20.00 |
| 203E20000 EMBANKMENT | 30 CY | $56.50 | $56.50 | $59.00 | $58.00 |
| 209E15000 RESHAPING UNDER GUARDRAIL | 12 STA | $46.00 | $46.00 | $48.00 | $68.00 |
| 601E20000 CRUSHED AGGREGATE SLOPE PROTECTION | 15 SY | $50.00 | $85.00 | $87.00 | $100 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 7 EACH | $1,950 | $1,950 | $2,050 | $1,850 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 4 EACH | $775 | $775 | $815 | $775 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 2 EACH | $1,965 | $1,965 | $2,050 | $1,900 |
| 606E35003 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1, AS PER PLAN | 2 EACH | $2,140 | $2,140 | $2,247 | $2,200 |
| 606E35141 BRIDGE TERMINAL ASSEMBLY, TYPE 4, AS PER PLAN | 4 EACH | $820 | $820 | $861 | $950 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 1 EACH | $1,150 | $1,200 | $850 | $650 |
| 623E38500 MONUMENT ASSEMBLY | 3 EACH | $1,500 | $1,350 | $1,200 | $1,000 |
| 626E00116 BARRIER REFLECTOR, TYPE 5 - BIDIRECTIONAL | 25 EACH | $6.80 | $6.80 | $7.15 | $7.00 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 1 EACH | $135 | $250 | $142 | $135 |
| 659E00300 TOPSOIL | 30 CY | $30.00 | $50.00 | $79.80 | $75.00 |
| 659E10000 SEEDING AND MULCHING | 1,270 SY | $2.45 | $2.45 | $1.40 | $2.45 |
| 659E14000 REPAIR SEEDING AND MULCHING | 14 SY | $0.75 | $0.75 | $4.20 | $0.75 |
| 659E20000 COMMERCIAL FERTILIZER | 0.18 TON | $600 | $600 | $735 | $600 |
| 659E35000 WATER | 7.5 MGAL | $2.00 | $2.00 | $0.05 | $2.00 |
| 832E30000 EROSION CONTROL | 1,500 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 209E60500 LINEAR GRADING | 23.98 MILE | $160 | $200 | $1,100 | $1,000 |
| 410E12001 TRAFFIC COMPACTED SURFACE, TYPE A OR B, AS PER PLA | 51 CY | $76.05 | $76.00 | $80.00 | $76.05 |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $2,708 | $2,708 | $2,840 | $2,708 |
| 618E41000 EDGE LINE, RUMBLE STRIPE (ASPHALT CONCRETE) | 13 MILE | $650 | $700 | $782 | $730 |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 9,194 LB | $0.30 | $1.25 | $1.25 | $0.75 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 702 EACH | $8.00 | $23.00 | $15.00 | $4.00 |
| 642E00094 EDGE LINE, 6" | 20.1 MILE | $615 | $615 | $646 | $615 |
| 642E00290 CENTER LINE | 10 MILE | $650 | $450 | $473 | $450 |
| 642E00490 STOP LINE | 27 FT | $3.00 | $3.00 | $3.15 | $3.00 |
| 614E12460 WORK ZONE MARKING SIGN | 20 EACH | $180 | $85.00 | $89.25 | $85.00 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 10.5 MILE | $525 | $600 | $551 | $525 |
| 202E22900 APPROACH SLAB REMOVED | 156 SY | $47.78 | $47.78 | $50.20 | $47.78 |
| 202E23000 PAVEMENT REMOVED | 358 SY | $10.51 | $10.51 | $11.05 | $10.51 |
| 204E10000 SUBGRADE COMPACTION | 591 SY | $1.06 | $1.06 | $1.10 | $1.06 |
| 304E20000 AGGREGATE BASE | 86 CY | $72.75 | $72.75 | $76.40 | $72.75 |
| 407E10000 TACK COAT | 52 GAL | $2.10 | $1.90 | $2.10 | $2.00 |
| 424E12001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B, AS P | 22 CY | $160 | $150 | $155 | $166 |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (22 CY | $127 | $134 | $174 | $290 |
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1 | 77 SY | $67.64 | $67.64 | $71.05 | $50.00 |
| 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN | 66 CY | $76.27 | $76.27 | $80.10 | $76.27 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 5,888 LB | $1.23 | $1.23 | $1.30 | $1.23 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 100 LB | $1.23 | $1.23 | $1.30 | $1.23 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 46 EACH | $22.39 | $22.39 | $23.55 | $22.39 |
| 511E45710 CLASS QC1 CONCRETE, ABUTMENT | 3 CY | $1,469 | $1,469 | $1,543 | $1,469 |
| 511E60000 SPECIAL - BRIDGE DECK GROOVING | 159 SY | $22.70 | $22.70 | $23.85 | $22.70 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 65 SY | $12.29 | $12.29 | $12.90 | $12.29 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 40 SF | $12.75 | $12.75 | $13.40 | $12.75 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 133 FT | $40.20 | $40.20 | $42.25 | $40.20 |
| 516E31000 JOINT SEALER | 98 FT | $16.30 | $15.30 | $16.10 | $15.30 |
| 516E31200 SPECIAL - SAWING AND SEALING BITUMINOUS CONCRETE J | 77 FT | $18.57 | $18.57 | $19.50 | $18.57 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 33 CY | $84.09 | $84.09 | $88.30 | $84.09 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 123 FT | $9.57 | $9.57 | $10.05 | $9.57 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 160 FT | $6.29 | $6.29 | $6.60 | $6.29 |
| 526E90020 TYPE B INSTALLATION | 78 SY | $34.54 | $34.54 | $36.30 | $25.00 |
| 601E20000 CRUSHED AGGREGATE SLOPE PROTECTION | 6 SY | $82.95 | $82.95 | $87.10 | $82.95 |
| 617E10100 COMPACTED AGGREGATE | 9 CY | $54.00 | $55.00 | $102 | $57.00 |
| 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE | 2 CY | $390 | $390 | $410 | $390 |
| 848E50000 HAND CHIPPING | 7 SY | $145 | $145 | $152 | $145 |
| 848E50100 TEST SLAB | 1 LS | $1,367 | $1,367 | $1,435 | $1,367 |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 25 LB | $0.30 | $1.25 | $1.20 | $0.75 |
| 202E38602 BRIDGE RAILING REMOVED FOR REUSE | 62.5 FT | $4.00 | $4.00 | $4.20 | $4.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN | 238 SY | $1.65 | $5.85 | $15.00 | $1.10 |
| 407E20000 NON-TRACKING TACK COAT | 37 GAL | $2.10 | $1.90 | $2.10 | $2.00 |
| 424E12001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B, AS P | 8 CY | $160 | $150 | $155 | $166 |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (8 CY | $127 | $134 | $242 | $116 |
| 516E31200 SPECIAL - SAWING AND SEALING BITUMINOUS CONCRETE J | 120 FT | $22.90 | $22.90 | $24.05 | $22.90 |
| 517E75501 BRIDGE RAILING REBUILT, AS PER PLAN | 62.5 FT | $49.20 | $49.20 | $52.00 | $50.00 |
| 517E75601 DEEP BEAM BRIDGE RETROFIT RAILING, AS PER PLAN | 62.5 FT | $78.80 | $78.80 | $82.00 | $89.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (VARIES) | 640 SY | $1.65 | $1.50 | $9.85 | $1.50 |
| 407E20000 NON-TRACKING TACK COAT | 58 GAL | $2.10 | $1.90 | $2.10 | $2.00 |
| 424E12001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B, AS P | 18 CY | $154 | $150 | $155 | $166 |
| 516E31200 SPECIAL - SAWING AND SEALING BITUMINOUS CONCRETE J | 130 FT | $21.39 | $21.39 | $22.50 | $21.39 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $8,000 | $8,500 | $8,000 | $10,000 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $10,000 | $46,000 | $40,000 | $121,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,000 | $9,500 | $10,900 | $3,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 424E12001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B, AS P | 4,957 CY | $160 | $793k | 47% |
| 253E01000 PAVEMENT REPAIR, 8" | 2,675 SY | $27.25 | $73k | 4% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (566 CY | $127 | $72k | 4% |
| 511E34410 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 56 CY | $1,026 | $57k | 3% |
| 253E01000 PAVEMENT REPAIR, 6" | 2,710 SY | $20 | $54k | 3% |
| 526E25010 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 156 SY | $282.32 | $44k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 2% |
| 617E10100 COMPACTED AGGREGATE | 681 CY | $52 | $35k | 2% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $35,000 | $35k | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 2" | 20,373 SY | $1.65 | $34k | 2% |