TRU-Culverts-FY2018
TRU County · est $0.3M
Bid dateThursday, March 22—
TRU County · est $0.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 49 more items below.
| Item | Quantity | R1S E T INC | R2Shelly & Sands INC | R3Marucci & Gaffney Excavating CO | R4Rudzik Excavating INC | R5Lockhart Concrete CO | % of bid |
|---|---|---|---|---|---|---|---|
| 833E10000 CONDUIT RENEWAL USING SPRAY APPLIED STRUCTURAL LIN | 51 FT | $1,710 | $1,300 | $1,550 | $1,925 | $2,000 | 28% |
| 611E96476 18' X 5' CONDUIT, TYPE A, 706.05 | 38 FT | $1,457 | $1,500 | $1,250 | $1,863 | $4,808 | 18% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 44 CY | $610 | $700 | $500 | $818 | $250 | 9% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI |
| Item | Quantity | R1S E T INC | R2Shelly & Sands INC | R3Marucci & Gaffney Excavating CO | R4Rudzik Excavating INC | R5Lockhart Concrete CO |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,000 | $5,000 | $5,000 | $5,000 | $4,500 |
| 202E23000 PAVEMENT REMOVED | 129 SY | $10.00 | $8.00 | $20.00 | $16.00 | $7.00 |
| 202E38000 GUARDRAIL REMOVED | 417 FT | $3.00 | $1.69 | $1.00 | $5.00 | $5.00 |
| 202E98200 REMOVAL MISC.:CHANNEL CLEANOUT | 51 FT | $20.00 | $18.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 14.14 CY |
| $1,441 |
| $1,500 |
| $900 |
| $1,408 |
| $400 |
| 7% |
| 624E10000 MOBILIZATION | 1 LS | $16,500 | $10,000 | $10,000 | $16,500 | $29,000 | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 37 CY | $330 | $150 | $220 | $330 | $200 | 4% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 35 CY | $330 | $230 | $350 | $330 | $245 | 4% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $9,650 | $6,000 | $6,500 | $6,000 | $49,000 | 3% |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $1,525 | $2,000 | $400 | $750 | $300 | 3% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 4,358 LB | $1.74 | $1.80 | $3.00 | $1.25 | $1.00 | 2% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING (TRU-87-12.71) | 1 LS | $7,150 | $52,000 | $75,000 | $30,000 | $20,000 | 2% |
| 659E00300 TOPSOIL | 125 CY | $51.25 | $30.00 | $5.00 | $37.30 | $20.00 | 2% |
| 613E41200 LOW STRENGTH MORTAR BACKFILL | 10 CY | $621 | $640 | $750 | $525 | $75.00 | 2% |
| 203E35120 GRANULAR MATERIAL, TYPE C | 88 CY | $64.00 | $100 | $50.00 | $98.25 | $50.00 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,200 | $3,000 | $5,000 | $9,609 | $19,000 | 2% |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 57 CY | $82.07 | $112 | $100 | $131 | $125 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T-3") | 408 SY | $11.00 | $15.00 | $13.00 | $11.00 | $8.00 | 1% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 2 EACH | $2,145 | $2,100 | $2,100 | $2,145 | $2,200 | 1% |
| 512E33010 TYPE 3 WATERPROOFING | 93 SY | $44.00 | $33.00 | $35.00 | $45.00 | $22.00 | 1% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $4,037 | $10,000 | $30,000 | $15,400 | $7,500 | 1% |
| $40.00 |
| $125 |
| $40.00 |
| 203E10000 EXCAVATION | 65 CY | $25.00 | $18.00 | $36.00 | $100 | $30.00 |
| 204E10000 SUBGRADE COMPACTION | 64 SY | $1.25 | $4.00 | $2.50 | $8.00 | $5.00 |
| 209E72001 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA | 3 STA | $400 | $295 | $550 | $500 | $18.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 200 FT | $16.50 | $18.00 | $16.00 | $16.50 | $26.00 |
| 606E17350 GUARDRAIL, TYPE MGS, 25' LONG-SPAN | 50 FT | $28.00 | $20.00 | $27.00 | $27.50 | $1,800 |
| 606E26050 ANCHOR ASSEMBLY, MGS TYPE B | 2 EACH | $1,870 | $1,900 | $1,800 | $1,870 | $2,100 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 3 CY | $100 | $360 | $175 | $412 | $125 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 2 CY | $100 | $360 | $225 | $481 | $150 |
| 659E10000 SEEDING AND MULCHING | 1,125 SY | $3.20 | $3.00 | $3.00 | $5.00 | $2.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 57 SY | $1.00 | $0.50 | $0.27 | $1.50 | $2.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.15 TON | $500 | $450 | $400 | $900 | $700 |
| 659E31000 LIME | 0.23 ACRE | $121 | $116 | $10.00 | $500 | $500 |
| 659E35000 WATER | 3 MGAL | $51.25 | $0.95 | $0.50 | $1.00 | $50.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E00900 6" CONDUIT, TYPE B | 30 FT | $38.97 | $15.00 | $5.00 | $34.21 | $12.00 |
| 611E01400 6" CONDUIT, TYPE E | 30 FT | $22.46 | $15.00 | $5.00 | $28.19 | $11.00 |
| 611E01500 6" CONDUIT, TYPE F | 30 FT | $22.98 | $15.00 | $5.00 | $25.67 | $10.00 |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 60 FT | $3.00 | $5.00 | $5.00 | $20.00 | $5.00 |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 11 CY | $64.90 | $90.00 | $120 | $266 | $45.00 |
| 407E20000 NON-TRACKING TACK COAT | 46 GAL | $16.50 | $2.70 | $5.00 | $17.00 | $5.00 |
| 408E10001 PRIME COAT, AS PER PLAN | 23 GAL | $16.50 | $3.00 | $16.00 | $25.00 | $4.00 |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 4 CY | $64.00 | $128 | $200 | $270 | $45.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 6 EACH | $6.60 | $8.00 | $7.00 | $6.60 | $6.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 15 FT | $17.00 | $16.00 | $25.00 | $50.00 | $10.00 |
| 630E80100 SIGN, FLAT SHEET, 730.20 | 2 SF | $40.00 | $58.00 | $60.00 | $100 | $15.00 |
| 642E00094 EDGE LINE, 6" | 0.06 MILE | $23,000 | $12,500 | $15,000 | $14,000 | $12,500 |
| 642E00290 CENTER LINE | 0.03 MILE | $23,200 | $17,280 | $20,000 | $18,000 | $16,500 |
| 614E12420 DETOUR SIGNING | 1 LS | $3,630 | $5,000 | $10,000 | $6,800 | $9,000 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 5 CY | $200 | $220 | $100 | $360 | $190 |
| 616E10000 WATER | 1 MGAL | $51.25 | $100 | $1.00 | $5.00 | $50.00 |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,000 | $5,000 | $10,000 | $2,500 | $5,000 |
| 202E11000 STRUCTURE REMOVED (TRU-87-12.71) | 1 LS | $3,250 | $18,000 | $10,000 | $10,000 | $29,000 |
| 203E10000 EXCAVATION | 40 CY | $50.00 | $30.00 | $38.00 | $80.00 | $40.00 |
| 203E35120 GRANULAR MATERIAL, TYPE C (703.16) | 40 CY | $64.00 | $88.00 | $75.00 | $93.25 | $50.00 |
| 204E50000 GEOTEXTILE FABRIC TYPE D | 62 SY | $3.05 | $1.80 | $2.00 | $19.45 | $3.00 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $3,000 | $24,000 | $13,000 | $13,000 | $19,000 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 63 SY | $21.30 | $32.00 | $25.00 | $50.00 | $10.00 |
| 512E33000 TYPE 2 WATERPROOFING | 63 SY | $25.00 | $26.00 | $25.00 | $40.00 | $15.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 30 SF | $5.13 | $3.00 | $5.00 | $13.75 | $2.00 |
| 518E21230 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 1 LS | $943 | $3,000 | $4,000 | $7,229 | $1,000 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 15 FT | $17.00 | $16.00 | $25.00 | $50.00 | $10.00 |
| 630E80100 SIGN, FLAT SHEET, 730.20 | 2 SF | $40.00 | $58.00 | $60.00 | $105 | $15.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 2 EACH | $17.00 | $11.00 | $10.00 | $100 | $15.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $17.00 | $15.00 | $10.00 | $100 | $25.00 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,000 | $6,100 | $4,500 | $2,700 | $7,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 833E10000 CONDUIT RENEWAL USING SPRAY APPLIED STRUCTURAL LIN | 51 FT | $1,710 | $87k | 24% |
| 611E96476 18' X 5' CONDUIT, TYPE A, 706.05 | 38 FT | $1,457 | $55k | 15% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 44 CY | $610 | $27k | 7% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 14.14 CY | $1,441 | $20k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $16,500 | $17k | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 37 CY | $330 | $12k | 3% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 35 CY | $330 | $12k | 3% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $9,650 | $10k | 3% |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $1,525 | $9k | 3% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 4,358 LB | $1.74 | $8k | 2% |