CUY-CU FY2018
CUY County · est $0.4M
Bid dateThursday, April 19—
CUY County · est $0.4M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 44 more items below.
| Item | Quantity | R1Eclipse CO LLC | R2Americon Industrial Services LLC | R3Catts Construction INC | R4Burton Scot Contractors LLC | R5Lockhart Concrete CO | % of bid |
|---|---|---|---|---|---|---|---|
| 611E94801 8' X 4' CONDUIT, TYPE A, 706.05, AS PER PLAN | 3 F, (66 FT | $600 | $900 | $645 | $600 | $5,800 | 13% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 143 CY | $232 | $220 | $295 | $225 | $225 | 11% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 52 CY | $474 | $490 | $432 | $400 | $270 | 8% |
| 611E20701 |
| Item | Quantity | R1Eclipse CO LLC | R2Americon Industrial Services LLC | R3Catts Construction INC | R4Burton Scot Contractors LLC | R5Lockhart Concrete CO |
|---|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 573 SY | $9.00 | $10.00 | $12.00 | $20.00 | $6.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 111 FT | $8.50 | $15.00 | $12.75 | $100 | $10.00 |
| 202E35200 PIPE REMOVED, OVER 24" | 91 FT | $31.50 | $35.00 | $15.50 | $150 | $20.00 |
| 202E38000 GUARDRAIL REMOVED | 518 FT | $3.50 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 90 FT |
| $237 |
| $425 |
| $472 |
| $450 |
| $200 |
| 7% |
| 614E12420 DETOUR SIGNING | 1 LS | $18,900 | $15,000 | $18,000 | $11,515 | $13,000 | 6% |
| 606E15050 GUARDRAIL, TYPE MGS | 662.5 FT | $22.00 | $17.00 | $25.00 | $20.80 | $18.00 | 5% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $14,500 | $10,000 | $5,120 | $7,500 | $10,000 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $14,044 | $10,000 | $11,000 | $20,000 | $29,000 | 5% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 21 CY | $651 | $675 | $955 | $600 | $200 | 5% |
| 611E07200 18" CONDUIT, TYPE A, 706.02 | 74 FT | $182 | $155 | $103 | $115 | $94.00 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $12,915 | $40,000 | $17,700 | $10,000 | $39,000 | 4% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 6 CY | $2,151 | $1,800 | $2,170 | $3,500 | $1,000 | 4% |
| 613E41200 LOW STRENGTH MORTAR BACKFILL | 119 CY | $97.50 | $125 | $95.00 | $125 | $70.00 | 4% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $9,500 | $5,000 | $6,320 | $5,000 | $17,000 | 3% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 4 EACH | $2,268 | $2,100 | $2,605 | $2,160 | $21.00 | 3% |
| 503E21100 UNCLASSIFIED EXCAVATION | 389 CY | $20.50 | $55.00 | $48.00 | $35.00 | $20.00 | 3% |
| 304E20000 AGGREGATE BASE | 112 CY | $60.00 | $60.00 | $97.00 | $75.00 | $45.00 | 2% |
| 832E30000 EROSION CONTROL | 6,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,831 | $7,500 | $2,900 | $25,000 | $4,000 | 2% |
| 202E11000 STRUCTURE REMOVED | 1 LS | $5,682 | $10,000 | $13,000 | $13,050 | $19,000 | 2% |
| $1.00 |
| $1.80 |
| $1.50 |
| $2.00 |
| 202E58100 CATCH BASIN REMOVED | 1 EACH | $410 | $350 | $490 | $500 | $50.00 |
| 203E10000 EXCAVATION | 200 CY | $14.00 | $10.00 | $38.00 | $25.00 | $15.00 |
| 203E20000 EMBANKMENT | 200 CY | $11.50 | $12.00 | $19.00 | $15.00 | $15.00 |
| 204E10000 SUBGRADE COMPACTION | 684 SY | $1.50 | $1.25 | $1.00 | $5.00 | $1.00 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 2 EACH | $888 | $850 | $1,020 | $845 | $1,000 |
| 623E40520 RIGHT-OF-WAY MONUMENT | 1 EACH | $377 | $500 | $295 | $1,500 | $350 |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 37 CY | $118 | $105 | $151 | $200 | $100 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 2 CY | $166 | $125 | $375 | $350 | $95.00 |
| 659E00100 SOIL ANALYSIS TEST | 6 EACH | $158 | $200 | $59.00 | $50.00 | $250 |
| 659E00300 TOPSOIL | 178 CY | $20.50 | $30.00 | $50.00 | $40.00 | $20.00 |
| 659E10000 SEEDING AND MULCHING | 1,600 SY | $1.50 | $5.00 | $3.25 | $2.55 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.22 TON | $525 | $600 | $533 | $400 | $700 |
| 659E31000 LIME | 0.33 ACRE | $105 | $150 | $133 | $100 | $500 |
| 659E35000 WATER | 9 MGAL | $3.00 | $5.00 | $1.00 | $9.00 | $50.00 |
| 602E20000 CONCRETE MASONRY | 4.8 CY | $1,107 | $1,100 | $1,525 | $2,000 | $700 |
| 605E31100 AGGREGATE DRAINS | 50 FT | $15.00 | $12.00 | $11.00 | $20.00 | $10.00 |
| 611E00900 6" CONDUIT, TYPE B | 50 FT | $33.00 | $25.00 | $23.00 | $15.00 | $15.00 |
| 611E01400 6" CONDUIT, TYPE E | 50 FT | $15.00 | $15.00 | $23.00 | $10.00 | $15.00 |
| 611E01500 6" CONDUIT, TYPE F | 50 FT | $15.00 | $20.00 | $23.00 | $10.00 | $15.00 |
| 611E04600 12" CONDUIT, TYPE C | 48 FT | $72.50 | $82.00 | $130 | $180 | $75.00 |
| 611E06100 15" CONDUIT, TYPE C | 10 FT | $87.00 | $140 | $161 | $200 | $90.00 |
| 407E10000 TACK COAT | 35 GAL | $5.50 | $2.00 | $5.00 | $10.00 | $3.00 |
| 621E00100 RPM | 3 EACH | $625 | $1,835 | $1,636 | $595 | $65.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 3 EACH | $7.50 | $20.00 | $5.00 | $25.00 | $50.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 13 EACH | $6.50 | $7.00 | $7.25 | $6.00 | $12.00 |
| 642E00094 EDGE LINE, 6" | 0.06 MILE | $52,500 | $12,000 | $49,575 | $12,000 | $11,000 |
| 642E00290 CENTER LINE | 0.03 MILE | $52,500 | $16,000 | $49,850 | $16,000 | $19,000 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 30 CY | $70.50 | $60.00 | $25.00 | $15.00 | $40.00 |
| 410E13000 TRAFFIC COMPACTED SURFACE, TYPE C | 30 CY | $70.50 | $50.00 | $25.00 | $30.00 | $45.00 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 0.03 MILE | $52,500 | $16,000 | $52,650 | $16,000 | $21,000 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 0.06 MILE | $52,500 | $12,000 | $52,375 | $12,000 | $11,000 |
| 616E10000 WATER | 3 MGAL | $3.00 | $10.00 | $20.00 | $52.01 | $50.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $5,164 | $5,000 | $23,625 | $15,000 | $10,000 |
| 503E21104 UNCLASSIFIED EXCAVATION, INCLUDING ROCK | 4 CY | $84.50 | $100 | $670 | $500 | $50.00 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 2,586 LB | $1.00 | $2.00 | $2.75 | $3.00 | $1.00 |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 1 CY | $2,223 | $1,275 | $2,610 | $3,500 | $500 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 31 SY | $34.50 | $60.00 | $43.50 | $50.00 | $15.00 |
| 512E33000 TYPE 2 WATERPROOFING | 162 SY | $17.00 | $40.00 | $20.50 | $35.00 | $15.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 24 SF | $8.00 | $10.00 | $5.60 | $25.00 | $2.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 5 CY | $116 | $185 | $175 | $200 | $50.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E94801 8' X 4' CONDUIT, TYPE A, 706.05, AS PER PLAN | 3 F, (66 FT | $600 | $40k | 11% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 143 CY | $231.5 | $33k | 9% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 52 CY | $473.5 | $25k | 7% |
| 611E20701 48" CONDUIT, TYPE A, AS PER PLAN | 90 FT | $236.5 | $21k | 6% |
| 614E12420 DETOUR SIGNING | 1 LS | $18,900 | $19k | 5% |
| 606E15050 GUARDRAIL, TYPE MGS | 662.5 FT | $22 | $15k | 4% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $14,500 | $15k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $14,044 | $14k | 4% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 21 CY | $650.5 | $14k | 4% |
| 611E07200 18" CONDUIT, TYPE A, 706.02 | 74 FT | $181.5 | $13k | 4% |