HOL-US 62/SR 39-14.83/04.23
HOL County · est $0.3M
Bid dateThursday, May 17—
HOL County · est $0.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 37 more items below.
| Item | Quantity | R1Americon Industrial Services LLC | R2Eclipse CO LLC | R3Buds INC | % of bid |
|---|---|---|---|---|---|
| 624E10000 MOBILIZATION | 1 LS | $25,300 | $10,000 | $10,000 | 13% |
| 606E15050 GUARDRAIL, TYPE MGS | 1,187.5 FT | $16.00 | $17.64 | $17.80 | 10% |
| 611E19200 42" CONDUIT, TYPE A, 707.02, 707.04, or 707.22 | 74 FT | $235 | $281 | $625 | 9% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $16,500 | $13,000 | $6,500 | 8% |
| 202E11001 STRUCTURE REMOVED, AS PER PLAN | 1 LS | $12,000 | $10,467 | $25,000 | 6% |
| Item | Quantity | R1Americon Industrial Services LLC | R2Eclipse CO LLC | R3Buds INC |
|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 285 SY | $10.00 | $12.32 | $30.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 47 FT | $15.00 | $9.22 | $120 |
| 202E38000 GUARDRAIL REMOVED | 813 FT | $1.25 | $1.68 | $7.00 |
| 203E10000 EXCAVATION | 299 CY | $8.25 | $23.00 | $20.00 |
| 204E10000 SUBGRADE COMPACTION | 372 SY | $1.00 | $1.62 | $8.50 |
| 606E25550 ANCHOR ASSEMBLY, MGS TYPE A |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 70 CY | $165 | $190 | $480 | 6% |
| 602E20000 CONCRETE MASONRY | 11.1 CY | $975 | $1,185 | $1,500 | 5% |
| 614E12420 DETOUR SIGNING | 1 LS | $9,850 | $10,500 | $8,000 | 5% |
| 659E00300 TOPSOIL | 305 CY | $30.00 | $20.00 | $35.00 | 5% |
| 611E16400 36" CONDUIT, TYPE B, 706.01, 706.02, 707.33, or 70 | 51 FT | $175 | $214 | $500 | 4% |
| 601E23000 ARTICULATING CONCRETE BLOCK REVETMENT SYSTEM, TYPE | 51 SY | $155 | $251 | $400 | 4% |
| 304E20000 AGGREGATE BASE | 117 CY | $60.00 | $70.23 | $120 | 4% |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 55 CY | $120 | $111 | $95.00 | 3% |
| 659E10000 SEEDING AND MULCHING | 2,741 SY | $2.25 | $1.19 | $2.00 | 3% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 14 CY | $395 | $790 | $480 | 3% |
| 203E20000 EMBANKMENT | 868 CY | $6.25 | $18.04 | $20.00 | 3% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 30 CY | $175 | $337 | $120 | 3% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (15 CY | $335 | $694 | $480 | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,000 | $9,047 | $5,000 | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,000 | $10,000 | $5,000 | 3% |
| 4 EACH |
| $1,100 |
| $1,244 |
| $1,200 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 3 EACH | $850 | $835 | $850 |
| 601E21070 TIED CONCRETE BLOCK MAT, TYPE 3 | 32 SY | $55.00 | $80.46 | $140 |
| 659E00100 SOIL ANALYSIS TEST | 4 EACH | $100 | $158 | $200 |
| 659E20000 COMMERCIAL FERTILIZER | 0.37 TON | $625 | $525 | $800 |
| 659E31000 LIME | 0.57 ACRE | $80.00 | $131 | $500 |
| 659E35000 WATER | 15 MGAL | $1.00 | $5.25 | $1.00 |
| 670E00710 DITCH EROSION PROTECTION MAT, TYPE A | 36 SY | $16.00 | $5.30 | $5.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 |
| 836E10030 SEEDING AND EROSION CONTROL WITH TURF REINFORCING | 160 SY | $12.25 | $9.55 | $18.00 |
| 605E31100 AGGREGATE DRAINS | 20 FT | $10.00 | $12.86 | $20.00 |
| 611E01400 6" CONDUIT, TYPE E FOR DRAINAGE CONNECTION | 15 FT | $15.00 | $16.85 | $25.00 |
| 611E04600 12" CONDUIT, TYPE C | 78 FT | $53.00 | $42.80 | $85.00 |
| 611E16600 36" CONDUIT, TYPE C, 706.01, 706.02, 707.33, or 70 | 24 FT | $195 | $185 | $300 |
| 611E98470 CATCH BASIN, NO. 2-2B | 1 EACH | $2,000 | $1,571 | $1,500 |
| 611E99574 MANHOLE, NO. 3 | 1 EACH | $4,500 | $4,475 | $4,500 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 102 FT | $3.00 | $5.25 | $4.00 |
| 407E10000 TACK COAT | 20 GAL | $1.00 | $2.63 | $2.00 |
| 408E10001 PRIME COAT, AS PER PLAN | 101 GAL | $2.00 | $6.30 | $25.00 |
| 621E00100 RPM | 4 EACH | $895 | $263 | $300 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 4 EACH | $10.00 | $9.52 | $20.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 BI-DIRECTIONAL | 21 EACH | $6.00 | $5.46 | $8.50 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 41 FT | $9.50 | $15.75 | $12.00 |
| 630E08600 SIGN POST REFLECTOR | 3 EACH | $30.00 | $52.50 | $45.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 3 EACH | $31.00 | $47.25 | $10.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 3 EACH | $15.00 | $10.50 | $10.00 |
| 646E10010 EDGE LINE, 6" | 0.04 MILE | $75,000 | $149,100 | $24,775 |
| 646E10200 CENTER LINE | 0.02 MILE | $125,000 | $148,050 | $40,000 |
| 616E10000 WATER | 10 MGAL | $10.00 | $5.25 | $1.00 |
| 617E10100 COMPACTED AGGREGATE | 20 CY | $65.00 | $78.72 | $120 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,500 | $15,000 | $4,000 |
| 619E16000 FIELD OFFICE, TYPE A | 2 MNTH | $1,500 | $700 | $200 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 624E10000 MOBILIZATION | 1 LS | $25,300 | $25k | 10% |
| 606E15050 GUARDRAIL, TYPE MGS | 1,187.5 FT | $16 | $19k | 7% |
| 611E19200 42" CONDUIT, TYPE A, 707.02, 707.04, or 707.22 | 74 FT | $235 | $17k | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $16,500 | $17k | 7% |
| 202E11001 STRUCTURE REMOVED, AS PER PLAN | 1 LS | $12,000 | $12k | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 70 CY | $165 | $12k | 5% |
| 602E20000 CONCRETE MASONRY | 11.1 CY | $975 | $11k | 4% |
| 614E12420 DETOUR SIGNING | 1 LS | $9,850 | $10k | 4% |
| 659E00300 TOPSOIL | 305 CY | $30 | $9k | 4% |
| 611E16400 36" CONDUIT, TYPE B, 706.01, 706.02, 707.33, or 70 | 51 FT | $175 | $9k | 4% |