MIA-Looney/Garbry Roundabout
MIA County · est $1.0M
Bid dateThursday, May 17—
MIA County · est $1.0M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 89 more items below.
| Item | Quantity | R1Double Jay Construction INC | R2Eagle Bridge CO | R3R B Jergens Contractors INC | R4Brumbaugh Construction INC | R5Barrett Paving Materials INC | R6John R Jurgensen Company | % of bid |
|---|---|---|---|---|---|---|---|---|
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 917 CY | $137 | $140 | $148 | $139 | $137 | $154 | 19% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 293 CY | $165 | $150 | $165 | $167 | $180 | $172 | 7% |
| 452E19200 NON-REINFORCED CONCRETE PAVEMENT, MISC.: TRUCK APR | 467 SY | $99.90 | $90.00 |
| Item | Quantity | R1Double Jay Construction INC | R2Eagle Bridge CO | R3R B Jergens Contractors INC | R4Brumbaugh Construction INC | R5Barrett Paving Materials INC | R6John R Jurgensen Company |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $9,080 | $4,000 | $8,500 | $4,411 | $7,000 | $5,015 |
| 202E23000 PAVEMENT REMOVED | 55 SY | $16.50 | $11.00 | $7.10 | $6.00 | $20.00 | $45.06 |
| 202E32500 CURB AND GUTTER REMOVED | 1,186 FT | $5.40 | $3.00 | $2.60 | $3.75 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $137 |
| $110 |
| $85.00 |
| $125 |
| 7% |
| 203E20000 EMBANKMENT | 3,800 CY | $12.25 | $16.00 | $13.50 | $23.00 | $20.00 | $15.98 | 7% |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 4,386 SY | $10.10 | $6.00 | $5.70 | $7.25 | $4.00 | $8.12 | 7% |
| 304E20000 AGGREGATE BASE | 1,055 CY | $38.85 | $50.00 | $35.00 | $49.00 | $58.00 | $62.94 | 6% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (228 CY | $150 | $160 | $157 | $152 | $160 | $181 | 5% |
| 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN | 1,208 FT | $23.20 | $20.00 | $23.40 | $22.50 | $15.00 | $24.24 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $27,500 | $25,000 | $40,000 | $27,017 | $9,000 | $40,000 | 4% |
| 611E10600 24" CONDUIT, TYPE C | 368 FT | $71.10 | $80.00 | $105 | $83.00 | $85.00 | $113 | 4% |
| 609E50000 4" CONCRETE TRAFFIC ISLAND | 445 SY | $54.00 | $41.00 | $49.40 | $58.00 | $41.00 | $46.63 | 4% |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 1,053 FT | $20.15 | $15.00 | $19.00 | $12.50 | $25.00 | $23.93 | 3% |
| 659E00300 TOPSOIL | 536 CY | $38.50 | $10.00 | $43.70 | $41.00 | $50.00 | $49.12 | 3% |
| 608E52000 CURB RAMP, TYPE A2 | 2,252 SF | $9.15 | $9.00 | $10.60 | $8.75 | $6.50 | $17.31 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $20,001 | $21,000 | $20,500 | $20,000 | $54,000 | $29,446 | 3% |
| 895E10020 MANUFACTURED WATER QUALITY STRUCTURE, TYPE 2 | 1 EACH | $17,592 | $18,500 | $15,545 | $20,653 | $23,000 | $33,755 | 3% |
| 609E26000 CURB, TYPE 6 | 913 FT | $17.75 | $18.00 | $17.40 | $27.00 | $13.00 | $23.69 | 2% |
| 625E14501 LIGHT POLE FOUNDATION, AS PER PLAN | 8 EACH | $1,980 | $1,804 | $2,415 | $2,001 | $1,200 | $2,300 | 2% |
| 832E30000 EROSION CONTROL | 14,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 611E98180 CATCH BASIN, NO. 3A | 7 EACH | $1,992 | $2,500 | $2,138 | $1,751 | $2,700 | $2,376 | 2% |
| $5.00 |
| $6.13 |
| 202E58000 MANHOLE REMOVED | 4 EACH | $585 | $500 | $380 | $530 | $500 | $1,096 |
| 202E58100 CATCH BASIN REMOVED | 8 EACH | $267 | $150 | $318 | $375 | $400 | $1,096 |
| 202E75000 FENCE REMOVED | 244 FT | $6.50 | $7.00 | $3.50 | $6.75 | $5.00 | $6.75 |
| 203E10000 EXCAVATION | 516 CY | $11.05 | $20.00 | $11.50 | $12.60 | $24.00 | $12.81 |
| 204E10000 SUBGRADE COMPACTION | 5,683 SY | $1.25 | $2.50 | $1.60 | $1.00 | $1.80 | $1.89 |
| 204E13000 EXCAVATION OF SUBGRADE | 284 CY | $13.65 | $20.00 | $19.10 | $12.00 | $20.00 | $20.91 |
| 204E30010 GRANULAR MATERIAL, TYPE B | 284 CY | $28.40 | $40.00 | $31.50 | $40.00 | $38.00 | $45.23 |
| 204E45000 PROOF ROLLING | 3 HOUR | $176 | $150 | $255 | $250 | $100 | $191 |
| 204E50000 GEOTEXTILE FABRIC | 568 SY | $1.70 | $1.00 | $1.95 | $2.85 | $1.50 | $3.40 |
| 623E40500 REFERENCE MONUMENT, TYPE A | 1 EACH | $483 | $1,250 | $300 | $500 | $700 | $819 |
| 623E40520 RIGHT-OF-WAY MONUMENT | 11 EACH | $195 | $250 | $85.00 | $550 | $400 | $886 |
| 861E10000 GEOGRID FOR SUBGRADE STABILIZATION | 285 SY | $2.30 | $2.00 | $2.05 | $5.00 | $3.50 | $5.12 |
| 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1 | 22 SY | $50.90 | $65.00 | $68.90 | $90.00 | $120 | $99.62 |
| 601E21060 TIED CONCRETE BLOCK MAT, TYPE 2 | 31 SY | $43.90 | $65.00 | $66.60 | $100 | $90.00 | $137 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $110 | $200 | $63.00 | $100 | $65.00 | $120 |
| 659E10000 SEEDING AND MULCHING | 4,831 SY | $2.60 | $2.00 | $0.95 | $1.60 | $1.15 | $0.90 |
| 659E14000 REPAIR SEEDING AND MULCHING | 242 SY | $0.55 | $1.45 | $0.95 | $1.45 | $1.00 | $0.90 |
| 659E15000 INTER-SEEDING | 242 SY | $0.55 | $1.45 | $0.55 | $1.45 | $1.00 | $0.50 |
| 659E20000 COMMERCIAL FERTILIZER | 1.09 TON | $990 | $750 | $630 | $834 | $600 | $600 |
| 659E31000 LIME | 1 ACRE | $275 | $250 | $31.50 | $250 | $250 | $30.00 |
| 659E35000 WATER | 27 MGAL | $11.00 | $10.00 | $1.05 | $10.00 | $10.00 | $1.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $11,000 | $6,000 | $5,355 | $6,000 | $8,500 | $5,485 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $6,270 | $8,000 | $8,925 | $7,000 | $9,000 | $6,076 |
| 605E05200 4" UNCLASSIFIED PIPE UNDERDRAINS | 50 FT | $8.75 | $7.00 | $14.40 | $6.50 | $11.00 | $8.61 |
| 605E06000 4" BASE PIPE UNDERDRAINS | 1,683 FT | $7.35 | $7.00 | $6.95 | $9.30 | $11.00 | $14.10 |
| 611E00410 4" CONDUIT, TYPE F FOR UNDERDRAIN OUTLET | 272 FT | $16.25 | $10.00 | $15.20 | $13.40 | $15.00 | $31.86 |
| 611E04400 12" CONDUIT, TYPE B | 195 FT | $54.10 | $65.00 | $66.70 | $64.00 | $68.00 | $84.24 |
| 611E04600 12" CONDUIT, TYPE C | 304 FT | $43.70 | $60.00 | $55.80 | $46.00 | $68.00 | $106 |
| 611E04900 12" CONDUIT, TYPE D | 36 FT | $30.40 | $25.00 | $42.90 | $43.00 | $54.00 | $83.03 |
| 611E05900 15" CONDUIT, TYPE B | 174 FT | $49.90 | $60.00 | $68.00 | $57.00 | $78.00 | $84.54 |
| 611E06100 15" CONDUIT, TYPE C | 56 FT | $75.60 | $55.00 | $117 | $53.00 | $78.00 | $111 |
| 611E98470 CATCH BASIN, NO. 2-2B | 3 EACH | $1,190 | $1,250 | $1,314 | $920 | $1,700 | $1,314 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 2 EACH | $316 | $550 | $659 | $321 | $600 | $965 |
| 611E99574 MANHOLE, NO. 3 | 6 EACH | $2,278 | $3,000 | $2,845 | $1,752 | $2,800 | $2,895 |
| 611E99582 MANHOLE, NO. 3 WITH 90" BASE I.D. AND 8" WEIR | 1 EACH | $8,183 | $9,250 | $7,403 | $8,844 | $8,500 | $17,610 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 1 EACH | $344 | $550 | $612 | $450 | $600 | $965 |
| 611E99660 MANHOLE RECONSTRUCTED TO GRADE | 3 EACH | $746 | $1,200 | $1,800 | $1,489 | $1,000 | $3,093 |
| 611E99661 MANHOLE RECONSTRUCTED TO GRADE, AS PER PLAN | 1 EACH | $746 | $650 | $1,800 | $2,052 | $1,000 | $2,327 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 2 EACH | $278 | $175 | $383 | $270 | $400 | $327 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" DEPTH | 1,827 SY | $4.15 | $4.01 | $5.90 | $4.15 | $5.00 | $4.29 |
| 407E10000 TACK COAT | 672 GAL | $6.60 | $2.51 | $2.45 | $6.25 | $2.70 | $2.50 |
| 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1 | 54 SY | $68.40 | $50.00 | $64.80 | $71.00 | $49.00 | $60.00 |
| 609E98000 CURB, MISC.: MOUNTABLE CURB, AS PER PLAN | 371 FT | $18.35 | $15.00 | $20.90 | $26.00 | $15.00 | $31.13 |
| 638E10400 FIRE HYDRANT ADJUSTED TO GRADE | 1 EACH | $1,840 | $1,000 | $1,452 | $550 | $900 | $1,372 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 4 EACH | $170 | $150 | $334 | $225 | $280 | $653 |
| 611E01800 8" CONDUIT, TYPE B, FOR SANITARY | 50 FT | $34.20 | $25.00 | $105 | $40.00 | $65.00 | $46.33 |
| 611E02000 8" CONDUIT, TYPE C, FOR SANITARY | 50 FT | $24.75 | $20.00 | $95.00 | $30.00 | $60.00 | $41.43 |
| 625E25408 CONDUIT, 2", 725.051 | 841 FT | $3.30 | $3.01 | $7.50 | $3.33 | $8.50 | $7.13 |
| 625E25500 CONDUIT, 3", 725.04 | 329 FT | $22.00 | $20.05 | $29.10 | $22.25 | $30.00 | $27.68 |
| 625E29000 TRENCH | 1,170 FT | $8.25 | $7.52 | $9.45 | $8.34 | $8.50 | $9.00 |
| 625E30700 PULL BOX, 725.08, 18" | 11 EACH | $770 | $702 | $792 | $778 | $900 | $754 |
| 625E32000 GROUND ROD | 8 EACH | $132 | $120 | $210 | $133 | $185 | $200 |
| 625E36000 PLASTIC CAUTION TAPE | 1,170 FT | $0.35 | $0.30 | $0.20 | $0.30 | $0.67 | $0.15 |
| 625E40000 SPECIAL - MAINTAIN EXISTING LIGHTING | 1 LS | $2,640 | $2,406 | $16,560 | $2,670 | $6,000 | $15,772 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 362 FT | $11.55 | $10.52 | $10.50 | $11.00 | $10.50 | $10.00 |
| 630E04100 GROUND MOUNTED SUPPORT, NO. 4 POST, TYPE S | 140 FT | $12.65 | $11.53 | $11.60 | $12.00 | $11.50 | $11.00 |
| 630E08510 STREET NAME SIGN SUPPORT, NO. 2 POST | 72 FT | $10.45 | $9.52 | $9.95 | $10.50 | $9.50 | $9.50 |
| 630E08600 SIGN POST REFLECTOR | 8 EACH | $33.00 | $30.07 | $57.80 | $61.00 | $30.00 | $55.00 |
| 630E80100 SIGN, FLAT SHEET | 324.57 SF | $20.00 | $17.04 | $13.90 | $14.75 | $17.00 | $13.25 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 13 EACH | $16.00 | $15.03 | $21.00 | $22.00 | $15.00 | $20.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 8 EACH | $22.00 | $20.05 | $31.50 | $33.00 | $20.00 | $30.00 |
| 644E00100 EDGE LINE, 4" | 0.21 MILE | $7,400 | $6,776 | $7,097 | $7,500 | $6,760 | $6,760 |
| 644E00200 LANE LINE, 4" | 0.15 MILE | $6,200 | $5,648 | $5,916 | $6,300 | $5,635 | $5,635 |
| 644E00300 CENTER LINE | 0.18 MILE | $9,400 | $8,530 | $8,935 | $9,500 | $8,510 | $8,510 |
| 644E00400 CHANNELIZING LINE, 8" | 677 FT | $2.25 | $2.05 | $2.15 | $2.25 | $2.05 | $2.05 |
| 644E00720 CHEVRON MARKING | 99 FT | $5.95 | $5.41 | $5.65 | $6.00 | $5.40 | $5.40 |
| 644E01300 LANE ARROW | 12 EACH | $192 | $175 | $184 | $195 | $175 | $175 |
| 644E01520 DOTTED LINE, 12" | 216 FT | $2.20 | $2.00 | $2.10 | $2.25 | $2.00 | $2.00 |
| 644E20800 YIELD LINE | 87 FT | $6.50 | $5.91 | $6.20 | $6.50 | $5.90 | $5.90 |
| 647E20010 CROSSWALK LINE, TYPE B90 | 390 FT | $16.50 | $15.03 | $15.80 | $16.70 | $15.00 | $15.00 |
| 661E14000 PERENNIALS, FROSTY ELEGANCE DAYLILY | 90 EACH | $27.50 | $110 | $47.40 | $120 | $130 | $45.15 |
| 661E14000 PERENNIALS, HIDECOTE LAVENDER | 21 EACH | $27.50 | $100 | $41.20 | $110 | $130 | $39.20 |
| 661E14000 PERENNIALS, MAIDEN GRASS | 10 EACH | $55.00 | $100 | $54.80 | $110 | $145 | $52.15 |
| 666E10011 PRUNING EXISTING TREE, 16 TO 24-INCH DIAMETER, AS | 2 EACH | $330 | $1,500 | $1,050 | $750 | $1,187 | $100 |
| 690E98000 SPECIAL - BENCH STONE | 35 EACH | $252 | $1,250 | $650 | $950 | $560 | $50.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $72.00 | $65.00 | $70.00 | $70.00 | $65.00 | $76.34 |
| 614E12420 DETOUR SIGNING | 1 LS | $10,208 | $12,500 | $9,750 | $14,000 | $9,280 | $9,000 |
| 614E20100 WORK ZONE LANE LINE, CLASS I, 4", 642 PAINT | 0.07 MILE | $11,250 | $5,012 | $10,735 | $11,370 | $10,225 | $10,225 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 0.26 MILE | $11,535 | $10,023 | $11,010 | $11,650 | $10,485 | $10,485 |
| 614E22100 WORK ZONE EDGE LINE, CLASS I, 4", 642 PAINT | 0.18 MILE | $11,375 | $5,813 | $10,855 | $11,500 | $10,340 | $10,340 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 37 FT | $2.75 | $10.02 | $2.60 | $2.75 | $2.50 | $2.50 |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 50 SY | $114 | $120 | $85.20 | $80.00 | $120 | $139 |
| 616E10000 WATER | 50 MGAL | $99.00 | $15.00 | $60.00 | $10.00 | $10.00 | $89.06 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $8,318 | $10,000 | $8,000 | $11,000 | $4,619 | $7,069 |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $1,315 | $1,750 | $200 | $1,400 | $800 | $1,766 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,885 | $20,000 | $11,750 | $10,513 | $11,000 | $17,066 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 917 CY | $137 | $126k | 13% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 293 CY | $165 | $48k | 5% |
| 452E19200 NON-REINFORCED CONCRETE PAVEMENT, MISC.: TRUCK APR | 467 SY | $99.9 | $47k | 5% |
| 203E20000 EMBANKMENT | 3,800 CY | $12.25 | $47k | 5% |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 4,386 SY | $10.1 | $44k | 5% |
| 304E20000 AGGREGATE BASE | 1,055 CY | $38.85 | $41k | 4% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (228 CY | $150 | $34k | 3% |
| 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN | 1,208 FT | $23.2 | $28k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $27,500 | $28k | 3% |
| 611E10600 24" CONDUIT, TYPE C | 368 FT | $71.1 | $26k | 3% |