WAY-SR 57-02.20
WAY County · est $1.8M
Bid dateThursday, May 17—
WAY County · est $1.8M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 51 more items below.
| Item | Quantity | R1Northstar Asphalt INC | R2Chagrin Valley Paving INC | R3Karvo Companies INC | R4Kokosing Construction Company INC | % of bid |
|---|---|---|---|---|---|---|
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 2,224 CY | $168 | $148 | $163 | $210 | 21% |
| 442E20201 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 2,595 CY | $129 | $130 | $127 | $190 | 19% |
| 255E10161 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 1,500 SY | $110 | $150 | $138 | $133 | 9% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $165,000 | $125,000 | $135,000 | $211,055 |
| Item | Quantity | R1Northstar Asphalt INC | R2Chagrin Valley Paving INC | R3Karvo Companies INC | R4Kokosing Construction Company INC |
|---|---|---|---|---|---|
| 202E32000 CURB REMOVED | 260 FT | $11.00 | $10.00 | $15.00 | $12.85 |
| 203E10000 EXCAVATION (6.5" DEPTH) | 915 CY | $10.00 | $20.00 | $48.00 | $20.00 |
| 623E39500 MONUMENT BOX ADJUSTED TO GRADE | 3 EACH | $350 | $750 | $450 | $400 |
| 202E30000 WALK REMOVED | 741 SF | $6.00 | $5.00 | $3.65 | $5.00 |
| 254E01600 PATCHING PLANED SURFACE |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 9% |
| 301E46001 ASPHALT CONCRETE BASE, PG64-22, AS PER PLAN | 1,126 CY | $141 | $130 | $125 | $165 | 9% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 400 CY | $230 | $230 | $238 | $245 | 5% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (3.25") | 53,374 SY | $1.70 | $3.00 | $2.10 | $1.50 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $75,000 | $75,000 | $72,000 | $100,000 | 4% |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 85 EACH | $620 | $750 | $725 | $800 | 3% |
| 202E23000 PAVEMENT REMOVED | 5,068 SY | $8.75 | $2.00 | $8.40 | $4.00 | 3% |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 36 EACH | $1,150 | $1,150 | $1,150 | $1,150 | 2% |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 18,186 FT | $2.00 | $1.50 | $1.38 | $1.60 | 2% |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 35 EACH | $790 | $900 | $1,150 | $975 | 2% |
| 609E26000 CURB, TYPE 6 | 480 FT | $45.00 | $40.00 | $19.00 | $22.75 | 1% |
| 204E10000 SUBGRADE COMPACTION | 5,068 SY | $3.50 | $0.50 | $1.25 | $4.00 | 1% |
| 608E52000 CURB RAMP | 741 SF | $22.00 | $25.00 | $34.00 | $18.50 | 1% |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 36 EACH | $350 | $1,250 | $1,000 | $250 | 1% |
| 253E02000 PAVEMENT REPAIR | 50 CY | $230 | $230 | $220 | $375 | 1% |
| 407E20000 NON-TRACKING TACK COAT (@0.09 GAL/SY) | 3,302 GAL | $3.30 | $2.00 | $2.10 | $2.50 | 1% |
| 304E20000 AGGREGATE BASE (3" DEPTH) | 422 CY | $25.00 | $53.00 | $100 | $20.00 | 1% |
| 534 SY |
| $2.00 |
| $5.00 |
| $1.00 |
| $1.00 |
| 407E13900 TACK COAT, 702.13 | 1,502 GAL | $2.50 | $2.00 | $1.75 | $2.60 |
| 407E20000 NON-TRACKING TACK COAT (@0.05 GAL/SY) | 2,668 GAL | $3.30 | $2.00 | $2.10 | $2.50 |
| 642E00300 CENTER LINE, TYPE 1 | 4.44 MILE | $300 | $862 | $862 | $780 |
| 642E00390 CHANNELIZING LINE, 8" | 921 FT | $0.55 | $0.50 | $0.50 | $0.55 |
| 642E00500 STOP LINE, TYPE 1 | 331 FT | $2.50 | $3.75 | $3.75 | $3.85 |
| 642E00600 CROSSWALK LINE, TYPE 1 | 702 FT | $2.00 | $2.00 | $2.00 | $2.15 |
| 642E00700 TRANSVERSE/DIAGONAL LINE, TYPE 1 | 175 FT | $2.25 | $3.00 | $3.00 | $3.00 |
| 642E00900 ISLAND MARKING, TYPE 1 | 150 SF | $2.25 | $2.50 | $2.50 | $3.00 |
| 642E01000 RAILROAD SYMBOL MARKING, TYPE 1 | 7 EACH | $250 | $350 | $350 | $325 |
| 642E01300 LANE ARROW, TYPE 1 | 49 EACH | $45.00 | $75.00 | $75.00 | $45.00 |
| 646E10010 EDGE LINE, 6" | 0.02 MILE | $2,930 | $5,565 | $5,565 | $31,850 |
| 646E10200 CENTER LINE | 0.22 MILE | $4,535 | $8,300 | $8,300 | $32,240 |
| 646E10300 CHANNELIZING LINE, 8" | 255 FT | $1.25 | $1.70 | $1.70 | $1.90 |
| 646E10400 STOP LINE | 96 FT | $9.15 | $13.30 | $13.30 | $10.00 |
| 646E10500 CROSSWALK LINE | 1,080 FT | $5.30 | $6.35 | $6.35 | $4.70 |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 175 FT | $7.25 | $9.40 | $9.40 | $7.00 |
| 646E10800 ISLAND MARKING | 150 SF | $4.14 | $6.70 | $6.70 | $5.00 |
| 646E20000 RAILROAD SYMBOL MARKING | 1 EACH | $500 | $740 | $740 | $600 |
| 646E20300 LANE ARROW | 6 EACH | $150 | $195 | $195 | $176 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 120 HOUR | $65.00 | $75.00 | $65.00 | $60.00 |
| 614E12350 WORK ZONE IMPACT ATTENUATOR | 4 EACH | $1,100 | $1,100 | $1,100 | $1,100 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 55 CY | $180 | $200 | $180 | $100 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL) | 30 EACH | $5.00 | $5.00 | $5.00 | $5.00 |
| 614E13312 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 24 EACH | $7.00 | $7.00 | $5.00 | $5.00 |
| 614E13360 OBJECT MARKER, TWO WAY (BIDIRECTIONAL) | 20 EACH | $12.00 | $12.00 | $10.00 | $10.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 10 SNMT | $900 | $900 | $900 | $600 |
| 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I | 0.42 MILE | $6,500 | $6,500 | $7,400 | $7,400 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 13.32 MILE | $775 | $775 | $775 | $775 |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 0.32 MILE | $3,250 | $3,250 | $5,600 | $5,600 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 3,528 FT | $0.35 | $0.35 | $0.35 | $0.35 |
| 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I | 118 FT | $8.50 | $8.50 | $2.80 | $2.80 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 1,281 FT | $2.50 | $2.50 | $2.50 | $2.50 |
| 616E10000 WATER | 3 MGAL | $100 | $50.00 | $5.00 | $5.00 |
| 622E41000 PORTABLE BARRIER, 32" | 360 FT | $16.00 | $16.00 | $16.00 | $16.00 |
| 622E41020 PORTABLE BARRIER, 32", BRIDGE MOUNTED (UNANCHORED) | 130 FT | $18.00 | $18.00 | $18.00 | $18.00 |
| 202E11301 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 4 CY | $1,500 | $1,500 | $1,500 | $1,500 |
| 202E98200 REMOVAL MISC.: JOINT SEAL | 88 FT | $10.00 | $10.00 | $10.00 | $10.00 |
| 511E53012 CLASS QC2 CONCRETE, MISC.: APPROACH SLAB REPAIR | 3 CY | $385 | $385 | $385 | $385 |
| 511E53012 CLASS QC2 CONCRETE, MISC.: BACKWALL REPAIR | 1 CY | $900 | $900 | $900 | $900 |
| 512E73501 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE | 11 SY | $75.00 | $75.00 | $75.00 | $75.00 |
| 516E31000 JOINT SEALER | 88 FT | $25.00 | $25.00 | $25.00 | $25.00 |
| 519E11100 PATCHING CONCRETE STRUCTURE | 157 SF | $35.00 | $35.00 | $35.00 | $35.00 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $2,500 | $5,000 | $7,500 | $7,500 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $7,500 | $13,500 | $22,000 | $9,500 |
| 619E16010 FIELD OFFICE, TYPE B | 5 MNTH | $750 | $1,500 | $1,750 | $2,350 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,250 | $1,000 | $1,500 | $1,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 2,224 CY | $168 | $374k | 20% |
| 442E20201 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 2,595 CY | $129 | $335k | 18% |
| 255E10161 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 1,500 SY | $110 | $165k | 9% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $165,000 | $165k | 9% |
| 301E46001 ASPHALT CONCRETE BASE, PG64-22, AS PER PLAN | 1,126 CY | $141 | $159k | 8% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 400 CY | $230 | $92k | 5% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (3.25") | 53,374 SY | $1.7 | $91k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $75,000 | $75k | 4% |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 85 EACH | $620 | $53k | 3% |
| 202E23000 PAVEMENT REMOVED | 5,068 SY | $8.75 | $44k | 2% |