ASD-US 224-06.56
ASD County · est $1.5M
Bid dateThursday, June 7—
ASD County · est $1.5M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 36 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Karvo Companies INC | R3Melway Paving CO INC | R4Kokosing Construction Company INC | % of bid |
|---|---|---|---|---|---|---|
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 5,717 CY | $144 | $163 | $175 | $160 | 55% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE 1.5" | 139,431 SY | $0.85 | $1.05 | $0.74 | $0.90 | 8% |
| 251E01030 PARTIAL DEPTH PAVEMENT REPAIR (442) | 400 CY | $255 | $295 | $250 | $260 | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $96,590 | $82,000 | $80,000 | $284,925 | 6% |
| Item | Quantity | R1Shelly & Sands INC | R2Karvo Companies INC | R3Melway Paving CO INC | R4Kokosing Construction Company INC |
|---|---|---|---|---|---|
| 202E30000 WALK REMOVED | 48 SF | $8.00 | $43.00 | $10.10 | $8.00 |
| 202E38200 GUARDRAIL REMOVED FOR REUSE | 62.5 FT | $2.00 | $2.00 | $5.10 | $2.00 |
| 202E42810 ANCHOR ASSEMBLY REMOVED FOR REUSE, TYPE E | 1 EACH | $185 | $185 | $252 | $185 |
| 203E20000 EMBANKMENT | 62.5 CY | $56.80 | $56.80 | $101 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 268 CY | $166 | $170 | $250 | $210 | 3% |
| 255E10161 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 100 SY | $432 | $255 | $402 | $475 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $51,000 | $18,500 | $40,000 | 3% |
| 617E10100 COMPACTED AGGREGATE | 866 CY | $42.00 | $29.50 | $50.00 | $52.00 | 2% |
| 809E69000 ADVANCE RADAR DETECTION (WAVETRONIX) | 4 EACH | $6,950 | $9,100 | $9,500 | $9,250 | 2% |
| 809E69100 STOP-BAR RADAR DETECTION (WAVETRONIX) | 4 EACH | $6,750 | $9,700 | $9,000 | $8,700 | 2% |
| 407E10000 TACK COAT | 12,558 GAL | $1.65 | $1.75 | $1.80 | $2.25 | 1% |
| 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA | 13 MILE | $1,500 | $1,610 | $2,000 | $2,000 | 1% |
| 408E10001 PRIME COAT, AS PER PLAN | 5,999 GAL | $3.25 | $3.30 | $2.60 | $4.00 | 1% |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 14.42 MILE | $1,300 | $830 | $705 | $830 | 1% |
| 619E16010 FIELD OFFICE, TYPE B | 5 MNTH | $2,500 | $1,750 | $1,600 | $2,000 | 1% |
| 621E00100 RPM | 539 EACH | $21.50 | $21.50 | $23.00 | $21.50 | 1% |
| 642E00104 EDGE LINE, 6", TYPE 1 | 12.96 MILE | $745 | $600 | $730 | $600 | 1% |
| 618E43000 CENTER LINE, RUMBLE STRIPE (ASPHALT CONCRETE) | 5.29 MILE | $1,560 | $1,175 | $1,100 | $1,845 | 1% |
| 659E00300 TOPSOIL | 54 CY | $140 | $80.00 | $81.00 | $75.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $7,500 | $15,000 | $7,100 | $6,500 | 1% |
| $56.80 |
| 209E15000 RESHAPING UNDER GUARDRAIL | 2.5 STA | $60.00 | $60.00 | $201 | $60.00 |
| 606E16500 GUARDRAIL REBUILT, TYPE 5 | 262.5 FT | $12.40 | $12.40 | $10.05 | $12.40 |
| 606E17000 RAISING TYPE 5 GUARDRAIL | 200 FT | $6.80 | $6.80 | $10.05 | $6.80 |
| 606E27850 ANCHOR ASSEMBLY REBUILT, TYPE E | 1 EACH | $1,485 | $1,485 | $1,760 | $1,485 |
| 608E52000 CURB RAMP | 48 SF | $82.00 | $89.00 | $46.00 | $82.00 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 1 EACH | $800 | $950 | $1,510 | $1,500 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 2 EACH | $400 | $580 | $804 | $1,200 |
| 623E39601 MONUMENT BOX RECONSTRUCTED TO GRADE, AS PER PLAN | 3 EACH | $1,200 | $1,000 | $804 | $900 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 6 EACH | $145 | $145 | $151 | $200 |
| 659E14000 REPAIR SEEDING AND MULCHING | 24 SY | $8.50 | $8.50 | $41.00 | $8.50 |
| 659E15000 INTER-SEEDING | 24 SY | $8.50 | $8.50 | $41.00 | $8.50 |
| 659E20000 COMMERCIAL FERTILIZER | 0.07 TON | $4,500 | $4,500 | $504 | $4,500 |
| 659E31000 LIME | 0.1 ACRE | $750 | $750 | $804 | $750 |
| 659E35000 WATER | 2.7 MGAL | $10.00 | $10.00 | $61.00 | $10.00 |
| 254E01600 PATCHING PLANED SURFACE | 698 SY | $3.00 | $0.50 | $5.50 | $1.50 |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 450 FT | $6.35 | $4.00 | $8.10 | $6.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 539 EACH | $4.00 | $2.50 | $12.00 | $2.39 |
| 632E90020 REMOVAL OF MISCELLANEOUS TRAFFIC SIGNAL ITEM: LOOP | 10 EACH | $595 | $100 | $101 | $100 |
| 632E90500 SIGNALIZATION, MISC.: UNLASH AND RELASH MESSENGER | 148 FT | $5.00 | $25.00 | $6.00 | $5.00 |
| 642E00300 CENTER LINE, TYPE 1 | 7.21 MILE | $570 | $670 | $704 | $670 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 266 FT | $8.50 | $5.00 | $8.10 | $5.00 |
| 644E00400 CHANNELIZING LINE, 8" | 322 FT | $1.40 | $1.30 | $1.60 | $1.30 |
| 644E00500 STOP LINE | 333 FT | $8.50 | $6.00 | $8.10 | $6.00 |
| 644E00601 CROSSWALK LINE, AS PER PLAN | 481 FT | $7.50 | $13.00 | $15.10 | $13.00 |
| 644E01300 LANE ARROW | 6 EACH | $125 | $100 | $101 | $100 |
| 644E40000 SPECIAL - AIR SPEED ZONE MARKING | 1 EACH | $3,100 | $850 | $510 | $850 |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 453 FT | $8.50 | $8.50 | $10.05 | $15.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $65.00 | $65.00 | $86.00 | $65.00 |
| 614E12460 WORK ZONE MARKING SIGN | 73 EACH | $58.00 | $55.00 | $66.00 | $55.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 25 CY | $250 | $150 | $150 | $110 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 333 FT | $2.90 | $2.45 | $3.10 | $2.45 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $4,000 | $1,500 | $2,500 | $4,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 5,717 CY | $144 | $823k | 52% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE 1.5" | 139,431 SY | $0.85 | $119k | 8% |
| 251E01030 PARTIAL DEPTH PAVEMENT REPAIR (442) | 400 CY | $255 | $102k | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $96,590 | $97k | 6% |
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 268 CY | $166 | $44k | 3% |
| 255E10161 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 100 SY | $432 | $43k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 3% |
| 617E10100 COMPACTED AGGREGATE | 866 CY | $42 | $36k | 2% |
| 809E69000 ADVANCE RADAR DETECTION (WAVETRONIX) | 4 EACH | $6,950 | $28k | 2% |
| 809E69100 STOP-BAR RADAR DETECTION (WAVETRONIX) | 4 EACH | $6,750 | $27k | 2% |