SUM-SR 8-07.60 (PART ONE AND PART TWO AND PART THREE)
SUM County · est $59M
Bid dateThursday, July 12—
SUM County · est $59M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 11%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 677 more items below.
| Item | Quantity | R1Kenmore Construction CO INC | R2Shelly & Sands INC | R3Anthony Allega Cement Contractor | R4INC Karvo Companies INC | R5Ruhlin Company | % of bid |
|---|---|---|---|---|---|---|---|
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 90,472 CY | $100 | $109 | $90.20 | $102 | $95.00 | 26% |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 50,927 CY | $48.00 | $50.00 | $43.74 | $50.50 | $55.00 | 7% |
| 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19MM, TYPE A | 15,628 CY | $138 | $130 | $129 | $143 | $133 | 6% |
| 806E00101 |
| Item | Quantity | R1Kenmore Construction CO INC | R2Shelly & Sands INC | R3Anthony Allega Cement Contractor | R4INC Karvo Companies INC | R5Ruhlin Company |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $150,000 | $20,000 | $364,671 | $250,000 | $50,000 |
| 202E20010 HEADWALL REMOVED | 50 EACH | $100 | $180 | $431 | $225 | $250 |
| 202E30000 WALK REMOVED | 4,307 SF | $1.00 | $0.40 | $2.16 | $1.00 | $3.50 |
| 202E30700 CONCRETE BARRIER REMOVED | 26,958 FT | $8.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 12,992 CY |
| $165 |
| $168 |
| $170 |
| $188 |
| $180 |
| 6% |
| 622E10140 CONCRETE BARRIER, SINGLE SLOPE, TYPE C1 | 21,690 FT | $95.00 | $90.00 | $104 | $95.00 | $100 | 6% |
| 202E23000 PAVEMENT REMOVED | 291,552 SY | $7.00 | $4.00 | $6.97 | $7.80 | $10.00 | 6% |
| 452E15060 12.5" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1 | 23,038 SY | $75.00 | $82.00 | $58.95 | $72.50 | $75.00 | 5% |
| 624E10000 MOBILIZATION(PART ONE AND PART TWO AND PART THREE) | 1 LS | $1,600,000 | $1,600,000 | $1,600,000 | $1,300,000 | $1,600,000 | 5% |
| 203E10000 EXCAVATION | 158,861 CY | $9.50 | $10.00 | $13.51 | $15.50 | $18.00 | 4% |
| 622E41011 PORTABLE BARRIER, 50", AS PER PLAN | 117,388 FT | $12.00 | $10.25 | $1.00 | $26.00 | $15.00 | 4% |
| 606E10220 SPECIAL - NOISE BARRIER (REFLECTIVE), OVER 14' TO | 55,582 SF | $25.00 | $21.00 | $20.17 | $22.00 | $30.00 | 4% |
| 206E10500 CEMENT | 10,217 TON | $136 | $140 | $141 | $135 | $135 | 4% |
| 614E11000 MAINTAINING TRAFFIC(PART ONE AND PART TWO AND PART | 1 LS | $1,300,000 | $1,240,000 | $1,366,139 | $800,000 | $2,700,000 | 4% |
| 513E10280 STRUCTURAL STEEL MEMBERS, LEVEL 4 | 472,600 LB | $2.00 | $2.25 | $1.83 | $2.13 | $2.50 | 3% |
| 605E11110 6" SHALLOW PIPE UNDERDRAINS WITH FABRIC WRAP, 707. | 100,953 FT | $8.00 | $10.00 | $9.20 | $7.75 | $9.00 | 2% |
| 206E15010 CEMENT STABILIZED SUBGRADE, 12 INCHES DEEP | 343,989 SY | $2.00 | $1.60 | $2.55 | $2.55 | $1.60 | 2% |
| 622E25014 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 182 EACH | $3,600 | $1,700 | $3,050 | $2,200 | $1,800 | 2% |
| 832E30000 EROSION CONTROL | 650,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 13,534 CY | $48.00 | $52.00 | $48.52 | $48.50 | $50.00 | 2% |
| 611E05900 15" CONDUIT, TYPE B, 706.02 | 6,919 FT | $93.00 | $105 | $131 | $85.00 | $80.00 | 2% |
| $8.00 |
| $5.80 |
| $12.00 |
| $16.00 |
| 202E32000 CURB REMOVED | 652 FT | $2.00 | $2.50 | $5.45 | $2.50 | $4.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 4,216 FT | $12.00 | $11.00 | $17.78 | $19.00 | $4.00 |
| 202E35200 PIPE REMOVED, OVER 24" | 1,148 FT | $15.00 | $14.00 | $16.14 | $14.25 | $15.00 |
| 202E38000 GUARDRAIL REMOVED | 15,810 FT | $2.50 | $2.00 | $2.16 | $2.00 | $2.00 |
| 202E58000 MANHOLE REMOVED | 3 EACH | $450 | $220 | $431 | $550 | $200 |
| 202E58100 CATCH BASIN REMOVED | 8 EACH | $300 | $165 | $431 | $350 | $375 |
| 202E58200 INLET REMOVED | 44 EACH | $200 | $300 | $431 | $700 | $250 |
| 202E70110 SPECIAL - PIPE CLEANOUT, 24" AND UNDER | 528 FT | $12.00 | $10.00 | $16.05 | $12.40 | $50.00 |
| 202E70120 SPECIAL - PIPE CLEANOUT, 27" TO 48" | 278 FT | $15.00 | $24.00 | $32.10 | $23.65 | $65.00 |
| 202E98200 REMOVAL MISC.: CHANNEL CLEANOUT | 250 FT | $13.00 | $12.00 | $14.40 | $14.00 | $11.00 |
| 203E10000 EXCAVATION | 337 CY | $20.00 | $7.50 | $21.93 | $25.00 | $11.50 |
| 203E20000 EMBANKMENT | 17,057 CY | $8.00 | $7.00 | $6.96 | $4.50 | $12.00 |
| 203E35001 GRANULAR EMBANKMENT, AS PER PLAN | 92 CY | $60.00 | $55.00 | $102 | $125 | $65.00 |
| 204E10000 SUBGRADE COMPACTION | 19,734 SY | $1.20 | $1.30 | $0.70 | $1.00 | $1.50 |
| 204E13000 EXCAVATION OF SUBGRADE | 19,600 CY | $15.00 | $16.00 | $14.48 | $19.85 | $18.00 |
| 204E30011 GRANULAR MATERIAL, TYPE B, AS PER PLAN "A" | 11,647 CY | $50.00 | $45.00 | $41.67 | $45.00 | $50.00 |
| 204E30011 GRANULAR MATERIAL, TYPE B, AS PER PLAN "B" | 900 CY | $54.00 | $45.00 | $41.64 | $45.00 | $45.00 |
| 204E30041 GRANULAR MATERIAL, TYPE E, AS PER PLAN "A" | 2,321 CY | $60.00 | $50.00 | $51.94 | $48.00 | $45.00 |
| 204E30041 GRANULAR MATERIAL, TYPE E, AS PER PLAN "B" | 249 CY | $62.00 | $80.00 | $57.57 | $57.00 | $50.00 |
| 204E30041 GRANULAR MATERIAL, TYPE E, AS PER PLAN "C" | 358 CY | $52.00 | $50.00 | $50.45 | $54.00 | $50.00 |
| 204E45000 PROOF ROLLING | 184 HOUR | $125 | $330 | $249 | $150 | $300 |
| 204E50000 GEOTEXTILE FABRIC, 712.09 | 14,502 SY | $1.50 | $0.40 | $1.23 | $1.00 | $2.50 |
| 204E50001 GEOTEXTILE FABRIC, AS PER PLAN "A" | 8,919 SY | $7.50 | $0.40 | $7.06 | $5.75 | $2.50 |
| 204E50001 GEOTEXTILE FABRIC, AS PER PLAN "B" | 1,286 SY | $2.50 | $4.00 | $5.72 | $4.80 | $2.50 |
| 204E50001 GEOTEXTILE FABRIC, AS PER PLAN "C" | 237 SY | $3.00 | $4.00 | $13.14 | $1.90 | $2.50 |
| 204E50001 GEOTEXTILE FABRIC, AS PER PLAN "D" | 214 SY | $3.00 | $1.30 | $8.10 | $1.95 | $2.50 |
| 204E50100 GEOTEXTILE FABRIC, 712.09, TYPE A | 31 SY | $5.00 | $0.45 | $3.49 | $7.00 | $2.50 |
| 206E11000 CURING COAT | 343,989 SY | $0.40 | $1.00 | $1.07 | $0.75 | $0.95 |
| 206E30000 MIXTURE DESIGN FOR CHEMICALLY STABILIZED SOILS | 1 LS | $52,000 | $60,000 | $53,500 | $55,000 | $57,000 |
| 209E60201 LINEAR GRADING, AS PER PLAN | 168 STA | $130 | $40.00 | $63.11 | $290 | $150 |
| 209E72001 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA | 17 STA | $160 | $80.00 | $223 | $70.00 | $30.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 14,374 FT | $17.00 | $18.00 | $18.57 | $17.60 | $17.60 |
| 606E26050 ANCHOR ASSEMBLY, MGS TYPE B | 3 EACH | $1,650 | $2,000 | $2,088 | $1,930 | $1,930 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 25 EACH | $1,900 | $2,400 | $2,510 | $2,320 | $2,320 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 26 EACH | $800 | $940 | $968 | $895 | $895 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 17 EACH | $1,900 | $2,300 | $2,364 | $2,185 | $2,185 |
| 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 14 EACH | $400 | $26.00 | $568 | $525 | $525 |
| 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4 | 4 EACH | $675 | $1,000 | $1,060 | $980 | $980 |
| 608E10000 4" CONCRETE WALK | 4,334 SF | $6.00 | $5.90 | $6.16 | $3.55 | $6.00 |
| 608E15001 8" CONCRETE WALK, AS PER PLAN | 319 SF | $10.00 | $13.00 | $10.54 | $7.55 | $8.00 |
| 622E10160 CONCRETE BARRIER, SINGLE SLOPE, TYPE D | 324 FT | $100 | $130 | $102 | $99.00 | $110 |
| 622E10200 BARRIER TRANSITION | 12 EACH | $3,700 | $3,500 | $4,708 | $4,600 | $3,000 |
| 622E25000 CONCRETE BARRIER END SECTION, TYPE D | 4 EACH | $3,000 | $3,400 | $2,996 | $3,500 | $2,500 |
| 622E25015 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 9 EACH | $3,200 | $3,700 | $3,531 | $2,600 | $2,750 |
| 622E25050 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 2 EACH | $2,500 | $5,400 | $2,729 | $3,400 | $2,700 |
| 622E90000 BARRIER, MISC.: CONCRETE BARRIER, TYPE B50 | 139 FT | $150 | $220 | $219 | $350 | $69.00 |
| 622E90000 BARRIER, MISC.:CONCRETE BARRIER, TYPE B | 206 FT | $120 | $145 | $167 | $182 | $11.00 |
| 623E38500 MONUMENT ASSEMBLY | 39 EACH | $500 | $950 | $1,698 | $1,050 | $450 |
| 623E40520 RIGHT-OF-WAY MONUMENT | 2 EACH | $225 | $140 | $271 | $365 | $160 |
| 690E98000 SPECIAL - MISC.:MISC.: VERTICAL CLEARANCE | 1 EACH | $4,000 | $260 | $1,000 | $600 | $1,300 |
| 861E10000 GEOGRID FOR SUBGRADE STABILIZATION | 15,493 SY | $2.00 | $1.15 | $1.89 | $1.95 | $1.50 |
| 861E10001 GEOGRID FOR SUBGRADE STABILIZATION, AS PER PLAN | 7,029 SY | $2.00 | $1.30 | $2.33 | $2.20 | $2.00 |
| 606E16001 GUARDRAIL REBUILT, AS PER PLAN | 5,860 FT | $20.00 | $14.00 | $14.23 | $13.50 | $13.50 |
| 601E11000 RIPRAP USING 6" REINFORCED CONCRETE SLAB | 20 SY | $100 | $130 | $358 | $185 | $145 |
| 601E20000 CRUSHED AGGREGATE SLOPE PROTECTION | 1,379 SY | $30.00 | $23.00 | $46.47 | $33.00 | $20.00 |
| 601E20001 CRUSHED AGGREGATE SLOPE PROTECTION, AS PER PLAN | 1,550 SY | $25.00 | $29.00 | $17.66 | $16.50 | $20.00 |
| 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1 | 56 SY | $90.00 | $105 | $162 | $155 | $100 |
| 601E21060 TIED CONCRETE BLOCK MAT, TYPE 2 | 347 SY | $70.00 | $74.00 | $51.06 | $100 | $50.00 |
| 601E32004 ROCK CHANNEL PROTECTION, TYPE A WITH FABRIC FILTER | 14 CY | $120 | $46.00 | $86.33 | $175 | $100 |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH FABRIC FILTER | 4 CY | $150 | $130 | $158 | $195 | $90.00 |
| 601E32110 ROCK CHANNEL PROTECTION, TYPE B WITH AGGREGATE FIL | 52 CY | $130 | $56.00 | $164 | $134 | $100 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 57 CY | $130 | $185 | $468 | $220 | $100 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH FABRIC FILTER | 12 CY | $150 | $150 | $255 | $200 | $100 |
| 601E32210 ROCK CHANNEL PROTECTION, TYPE C WITH AGGREGATE FIL | 36 CY | $160 | $158 | $335 | $270 | $100 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $200 | $300 | $321 | $5.00 | $300 |
| 659E00300 TOPSOIL | 16,902 CY | $12.00 | $9.00 | $8.83 | $9.50 | $6.00 |
| 659E10000 SEEDING AND MULCHING | 125,217 SY | $0.50 | $0.60 | $0.60 | $0.57 | $0.56 |
| 659E14000 REPAIR SEEDING AND MULCHING | 6,112 SY | $0.75 | $0.50 | $0.54 | $0.70 | $0.50 |
| 659E15000 INTER-SEEDING | 6,112 SY | $0.10 | $0.01 | $0.01 | $0.01 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 17.05 TON | $700 | $750 | $803 | $800 | $750 |
| 659E31000 LIME | 25.26 ACRE | $200 | $200 | $214 | $0.01 | $200 |
| 659E35000 WATER | 677 MGAL | $1.00 | $0.01 | $0.01 | $0.01 | $1.00 |
| 659E40000 MOWING | 2 MSF | $1.00 | $1.00 | $1.07 | $5.00 | $1.00 |
| 660E25000 SODDING STAKED | 30,000 SY | $6.50 | $7.00 | $7.22 | $7.99 | $6.75 |
| 670E00700 DITCH EROSION PROTECTION | 9,929 SY | $1.90 | $2.00 | $2.09 | $2.60 | $1.95 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $50,000 | $3,000 | $3,183 | $3,000 | $2,975 |
| 690E98400 SPECIAL - MISC.:STORM WATER POLLUTION PREVENTION I | 1 LS | $10,000 | $70,000 | $67,384 | $65,000 | $80,000 |
| 602E20000 CONCRETE MASONRY | 25.2 CY | $1,600 | $1,900 | $2,195 | $2,000 | $1,700 |
| 605E11111 6" SHALLOW PIPE UNDERDRAINS WITH FABRIC WRAP, AS P | 10,800 FT | $8.00 | $11.00 | $6.16 | $7.75 | $15.00 |
| 605E13410 6" UNCLASSIFIED PIPE UNDERDRAINS WITH FABRIC WRAP, | 4,451 FT | $10.00 | $15.00 | $9.99 | $8.00 | $11.00 |
| 605E13411 6" UNCLASSIFIED PIPE UNDERDRAINS WITH FABRIC WRAP, | 227 FT | $10.00 | $15.00 | $7.57 | $8.00 | $15.00 |
| 605E13510 6" ROCK CUT UNDERDRAINS WITH FABRIC WRAP, 707.31 | 10,197 FT | $11.00 | $14.00 | $9.20 | $8.50 | $11.00 |
| 605E14020 6" BASE PIPE UNDERDRAINS WITH FABRIC WRAP, 707.31 | 40,808 FT | $6.50 | $8.50 | $6.59 | $6.15 | $7.00 |
| 605E14021 6" BASE PIPE UNDERDRAINS WITH FABRIC WRAP, AS PER | 5,069 FT | $6.50 | $10.50 | $7.00 | $6.15 | $10.00 |
| 605E31100 AGGREGATE DRAINS | 50 FT | $10.00 | $7.00 | $98.91 | $13.00 | $21.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 1,063 FT | $13.00 | $20.00 | $35.69 | $17.00 | $18.00 |
| 611E00900 6" CONDUIT, TYPE B | 5,802 FT | $23.00 | $19.00 | $35.91 | $20.00 | $18.00 |
| 611E00901 6" CONDUIT, TYPE B, AS PER PLAN | 449 FT | $26.00 | $20.00 | $29.47 | $20.00 | $17.00 |
| 611E01100 6" CONDUIT, TYPE C | 200 FT | $8.00 | $18.00 | $30.60 | $18.50 | $25.00 |
| 611E01400 6" CONDUIT, TYPE E | 400 FT | $8.00 | $18.00 | $32.89 | $13.00 | $25.00 |
| 611E01500 6" CONDUIT, TYPE F | 400 FT | $8.00 | $18.00 | $32.89 | $13.00 | $16.00 |
| 611E04400 12" CONDUIT, TYPE B, 706.02 | 170 FT | $84.00 | $75.00 | $132 | $85.00 | $72.00 |
| 611E05700 15" CONDUIT, TYPE A, 706.02 | 188 FT | $96.00 | $99.00 | $231 | $65.00 | $90.00 |
| 611E05901 15" CONDUIT, TYPE B, AS PER PLAN, 706.02 | 112 FT | $64.00 | $65.00 | $104 | $65.00 | $80.00 |
| 611E06100 15" CONDUIT, TYPE C, 706.02 | 24 FT | $80.00 | $91.00 | $138 | $90.00 | $80.00 |
| 611E06700 15" CONDUIT, TYPE F, 706.05 OR 707.21 | 1,190 FT | $68.00 | $75.00 | $103 | $65.00 | $60.00 |
| 611E07400 18" CONDUIT, TYPE B, 706.02 | 108 FT | $104 | $125 | $258 | $320 | $95.00 |
| 611E07600 18" CONDUIT, TYPE C706.02 | 154 FT | $70.00 | $72.00 | $108 | $82.00 | $120 |
| 611E08200 18" CONDUIT, TYPE F, 707.05 TYPE C OR 707.21 | 126 FT | $72.00 | $75.00 | $102 | $65.00 | $75.00 |
| 611E08900 21" CONDUIT, TYPE B, 706.02 | 172 FT | $110 | $129 | $303 | $120 | $80.00 |
| 611E09100 21" CONDUIT, TYPE C, 706.02 | 88 FT | $70.00 | $78.00 | $110 | $67.00 | $110 |
| 611E10200 24" CONDUIT, TYPE A | 161 FT | $120 | $71.00 | $110 | $95.00 | $80.00 |
| 611E10200 24" CONDUIT, TYPE A, 707.01, 707.21 | 10 FT | $250 | $109 | $63.91 | $260 | $100 |
| 611E10200 24" CONDUIT, TYPE A706.02 | 179 FT | $155 | $160 | $200 | $200 | $140 |
| 611E11700 27" CONDUIT, TYPE A706.02 | 235 FT | $165 | $164 | $179 | $170 | $110 |
| 611E11900 27" CONDUIT, TYPE B, 706.02 | 32 FT | $170 | $105 | $158 | $165 | $80.00 |
| 611E16200 36" CONDUIT, TYPE A, 706.02 | 217 FT | $180 | $198 | $223 | $210 | $150 |
| 611E22200 54" CONDUIT, TYPE A, 706.02 | 328 FT | $305 | $267 | $430 | $275 | $400 |
| 611E52900 34" X 53" CONDUIT, TYPE A, 706.04 | 192 FT | $275 | $248 | $355 | $190 | $300 |
| 611E53200 48" X 76" CONDUIT, TYPE A, 706.04 | 175 FT | $490 | $650 | $606 | $390 | $500 |
| 611E98150 CATCH BASIN, NO. 3 | 1 EACH | $2,900 | $3,100 | $3,988 | $3,500 | $3,000 |
| 611E98180 CATCH BASIN, NO. 3A | 14 EACH | $1,900 | $2,700 | $2,965 | $2,250 | $2,000 |
| 611E98300 CATCH BASIN, NO. 5 | 2 EACH | $2,100 | $3,100 | $3,069 | $2,600 | $3,500 |
| 611E98341 CATCH BASIN, NO. 5A | 1 EACH | $3,800 | $5,800 | $11,494 | $5,600 | $3,500 |
| 611E98370 CATCH BASIN, NO. 6 | 3 EACH | $2,100 | $2,600 | $3,398 | $2,200 | $2,200 |
| 611E98410 CATCH BASIN, NO. 8 | 1 EACH | $2,700 | $3,600 | $6,624 | $2,900 | $3,500 |
| 611E98450 CATCH BASIN, NO. 2-2A | 1 EACH | $1,700 | $2,100 | $1,933 | $1,475 | $1,200 |
| 611E98470 CATCH BASIN, NO. 2-2B | 1 EACH | $1,700 | $2,000 | $1,878 | $1,475 | $1,200 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 4 EACH | $700 | $880 | $1,024 | $950 | $800 |
| 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE | 2 EACH | $1,700 | $1,300 | $1,398 | $1,150 | $850 |
| 611E99110 INLET, NO. 3 FOR SINGLE SLOPE BARRIER, TYPE C1 | 61 EACH | $6,400 | $7,000 | $11,142 | $5,500 | $5,000 |
| 611E99111 INLET, NO. 3 FOR SINGLE SLOPE BARRIER, TYPE C1, AS | 2 EACH | $7,000 | $7,600 | $10,730 | $5,700 | $7,000 |
| 611E99500 INLET, MISC.:BARRIER MEDIAN INLET 3B | 8 EACH | $5,500 | $8,300 | $11,653 | $6,200 | $7,000 |
| 611E99574 MANHOLE, NO. 3 | 9 EACH | $3,100 | $3,900 | $3,090 | $3,900 | $4,000 |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 2 EACH | $500 | $1,100 | $1,111 | $950 | $1,000 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 28 EACH | $200 | $345 | $415 | $200 | $200 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 1,000 LB | $1.10 | $1.00 | $2.20 | $1.59 | $2.00 |
| 837E10000 LINER PIPE, 18" ID 707.12, OR SS937 TYPE A | 199 FT | $240 | $85.00 | $161 | $150 | $200 |
| 837E10000 LINER PIPE, 24" ID 707.12, OR SS937 TYPE A | 238 FT | $250 | $60.00 | $195 | $182 | $250 |
| 837E10000 LINER PIPE, 27" ID 707.12, OR SS937 TYPE A | 233 FT | $345 | $60.00 | $225 | $210 | $250 |
| 837E10000 LINER PIPE, 36" ID 707.12, OR SS937 TYPE A | 582 FT | $425 | $120 | $301 | $281 | $250 |
| 837E10000 LINER PIPE, 54" ID 707.12, OR SS937 TYPE A | 202 FT | $785 | $158 | $622 | $581 | $400 |
| 837E20000 BACKFILL FOR LINER PIPE | 126 CY | $500 | $255 | $187 | $175 | $250 |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR | 520 SY | $45.00 | $35.00 | $58.79 | $38.00 | $65.00 |
| 253E01000 PAVEMENT REPAIR | 520 SY | $70.00 | $82.00 | $89.51 | $57.00 | $80.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE | 10,332 SY | $2.00 | $1.20 | $2.25 | $1.45 | $2.25 |
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 2,605 CY | $100 | $109 | $95.03 | $106 | $121 |
| 407E20500 SPECIAL - TACK COAT, TRACKLESS TACK | 879 GAL | $3.00 | $3.00 | $4.21 | $2.75 | $6.00 |
| 407E20510 SPECIAL - TACK COAT, TRACKLESS TACK FOR INTERMEDIA | 1,193 GAL | $3.00 | $3.00 | $4.21 | $2.75 | $6.00 |
| 408E10000 PRIME COAT | 1,566 GAL | $3.50 | $3.00 | $2.64 | $3.45 | $3.25 |
| 424E10000 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE A | 75 CY | $200 | $200 | $301 | $224 | $300 |
| 441E10000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG | 415 CY | $133 | $140 | $152 | $161 | $200 |
| 441E10200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 446 (72 CY | $165 | $142 | $184 | $177 | $245 |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (126 CY | $135 | $145 | $210 | $168 | $180 |
| 441E50701 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (485 CY | $200 | $210 | $199 | $255 | $275 |
| 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19MM, TYPE A | 281 CY | $140 | $130 | $129 | $142 | $135 |
| 442E90000 ASPHALT CONCRETE, MISC.: ANTI-SEGREGATION EQUIPMEN | 522 CY | $1.00 | $0.60 | $2.74 | $5.00 | $5.85 |
| 452E12050 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS | 98 SY | $67.00 | $148 | $104 | $61.50 | $60.00 |
| 452E14020 10" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1 WI | 143 SY | $87.00 | $92.00 | $105 | $141 | $100 |
| 452E14050 10" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS | 84 SY | $86.00 | $182 | $102 | $136 | $100 |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 6 FT | $45.00 | $75.00 | $90.84 | $48.00 | $50.00 |
| 609E14000 CURB, TYPE 2-A | 9 FT | $25.00 | $50.00 | $19.65 | $15.95 | $42.00 |
| 609E24511 CURB, TYPE 4-C, AS PER PLAN | 944 FT | $15.00 | $37.00 | $20.20 | $24.80 | $20.00 |
| 609E26000 CURB, TYPE 6 | 1,291 FT | $18.00 | $33.00 | $19.16 | $11.50 | $17.00 |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 247 CY | $50.00 | $104 | $122 | $140 | $75.00 |
| 617E20000 SHOULDER PREPARATION | 3,914 SY | $1.00 | $1.00 | $2.71 | $2.50 | $0.50 |
| 617E25000 WATER | 11 MGAL | $10.00 | $5.00 | $373 | $5.00 | $25.00 |
| 618E40600 RUMBLE STRIPS, (ASPHALT CONCRETE) | 1 MILE | $1,000 | $800 | $722 | $675 | $675 |
| 806E00101 ASPHALT CONCRETE SURFACE COURSE, 12.5MM, TYPE A, A | 235 CY | $165 | $168 | $170 | $191 | $190 |
| 407E20510 SPECIAL - TACK COAT, TRACKLESS TACK FOR INTERMEDIA | 35,283 GAL | $3.00 | $3.00 | $4.21 | $2.75 | $3.00 |
| 442E90000 ASPHALT CONCRETE, MISC.:ANTI-SEGREGATION EQUIPMENT | 20,541 CY | $1.50 | $0.60 | $2.74 | $2.50 | $5.85 |
| 614E12801 WORK ZONE RAISED PAVEMENT MARKER, AS PER PLAN | 2,263 EACH | $22.00 | $22.00 | $23.38 | $21.98 | $21.98 |
| 618E40600 RUMBLE STRIPS, (ASPHALT CONCRETE) | 19 MILE | $900 | $700 | $722 | $675 | $675 |
| 638E07901 8" GATE VALVE AND VALVE BOX, AS PER PLAN | 1 EACH | $1,300 | $1,500 | $2,053 | $1,100 | $2,100 |
| 638E09201 12" CUTTING-IN SLEEVE, VALVE AND VALVE BOX, AS PER | 2 EACH | $4,000 | $5,700 | $5,221 | $6,500 | $4,800 |
| 638E09401 8" X 8" TAPPING SLEEVE, VALVE AND VALVE BOX, AS PE | 2 EACH | $5,000 | $4,300 | $9,059 | $6,700 | $6,400 |
| 638E10400 FIRE HYDRANT ADJUSTED TO GRADE | 1 EACH | $800 | $940 | $2,064 | $1,000 | $1,700 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 4 EACH | $225 | $275 | $372 | $465 | $350 |
| 638E98600 WATER WORK, MISC.: 12" WATER MAIN DUCTILE IRON PIP | 397 FT | $160 | $125 | $171 | $140 | $180 |
| 638E98600 WATER WORK, MISC.: 8" WATER MAIN DUCTILE IRON PIPE | 124 FT | $150 | $147 | $251 | $130 | $130 |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 1 EACH | $575 | $1,100 | $806 | $1,050 | $360 |
| 611E99661 MANHOLE RECONSTRUCTED TO GRADE, AS PER PLAN | 1 EACH | $1,500 | $1,400 | $2,226 | $1,200 | $360 |
| 625E00450 CONNECTION, FUSED PULL APART | 33 EACH | $70.00 | $79.00 | $80.69 | $85.00 | $72.00 |
| 625E00460 CONNECTION, UNFUSED PULL APART | 33 EACH | $70.00 | $79.00 | $87.13 | $85.00 | $77.75 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 18 EACH | $70.00 | $79.00 | $86.24 | $85.00 | $76.95 |
| 625E10490 LIGHT POLE, CONVENTIONAL : A12B40 | 8 EACH | $2,000 | $2,600 | $2,428 | $2,250 | $2,167 |
| 625E10490 LIGHT POLE, CONVENTIONAL : A12BB40 | 14 EACH | $2,100 | $2,900 | $2,749 | $2,750 | $2,453 |
| 625E10490 LIGHT POLE, CONVENTIONAL : AT12B34.2 | 5 EACH | $1,900 | $2,000 | $2,258 | $2,150 | $2,015 |
| 625E10490 LIGHT POLE, CONVENTIONAL : AT15B34.2 | 1 EACH | $1,900 | $2,000 | $2,309 | $2,200 | $2,060 |
| 625E10490 LIGHT POLE, CONVENTIONAL : AT18B34.2 | 2 EACH | $2,100 | $2,200 | $2,657 | $2,550 | $2,371 |
| 625E14000 LIGHT POLE FOUNDATION, 24" X 6' DEEP | 8 EACH | $1,300 | $890 | $1,575 | $1,850 | $1,405 |
| 625E14300 MEDIAN LIGHT POLE FOUNDATION, 8' DEEP | 22 EACH | $3,500 | $5,400 | $833 | $3,150 | $744 |
| 625E23200 NO. 4 AWG 5000 VOLT DISTRIBUTION CABLE | 11,910 FT | $2.50 | $2.30 | $2.99 | $3.00 | $2.67 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 3,712 FT | $1.00 | $1.30 | $1.23 | $2.00 | $1.10 |
| 625E24100 1-1/2" DUCT CABLE WITH TWO NO. 4 AWG 5000 VOLT CAB | 3,102 FT | $7.00 | $4.00 | $8.91 | $7.00 | $7.95 |
| 625E25600 CONDUIT, 4", 725.04 | 710 FT | $35.00 | $26.00 | $43.54 | $30.00 | $38.85 |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 3" | 302 FT | $52.00 | $36.00 | $57.38 | $38.00 | $51.20 |
| 625E25910 CONDUIT CLEANED AND CABLES REMOVED | 88 FT | $9.00 | $1.00 | $10.98 | $0.50 | $9.80 |
| 625E26251 LUMINAIRE, CONVENTIONAL, AS PER PLAN: 200 WATT, TY | 8 EACH | $345 | $369 | $423 | $265 | $378 |
| 625E26251 LUMINAIRE, CONVENTIONAL, AS PER PLAN: 310 WATT, TY | 36 EACH | $345 | $369 | $409 | $270 | $365 |
| 625E29002 TRENCH, 24" DEEP | 2,992 FT | $5.29 | $5.00 | $6.39 | $10.00 | $5.70 |
| 625E29900 JUNCTION BOX | 6 EACH | $1,600 | $1,600 | $1,967 | $1,750 | $1,755 |
| 625E29910 TRANSITION JUNCTION BOX | 2 EACH | $2,200 | $1,600 | $2,606 | $1,750 | $2,325 |
| 625E30700 PULL BOX, 725.08, 18" | 8 EACH | $750 | $792 | $891 | $800 | $795 |
| 625E31510 PULL BOX REMOVED | 7 EACH | $240 | $105 | $284 | $100 | $254 |
| 625E32000 GROUND ROD | 38 EACH | $125 | $184 | $142 | $235 | $127 |
| 625E36000 PLASTIC CAUTION TAPE | 2,992 FT | $0.30 | $0.25 | $0.30 | $0.20 | $0.27 |
| 625E40000 SPECIAL - MAINTAIN EXISTING LIGHTING | 1 LS | $950 | $60,000 | $1,123 | $98,000 | $1,003 |
| 625E75400 LIGHT POLE REMOVED | 30 EACH | $400 | $105 | $481 | $200 | $430 |
| 625E75500 LIGHT POLE FOUNDATION REMOVED | 30 EACH | $350 | $105 | $397 | $100 | $355 |
| 625E75801 DISCONNECT CIRCUIT, AS PER PLAN | 3 EACH | $175 | $210 | $213 | $235 | $190 |
| 625E98000 LIGHTING, MISC.: RESTORE SERVICE TO UNDERPASS LIGH | 1 EACH | $3,800 | $10,000 | $4,455 | $3,200 | $3,975 |
| 625E98000 LIGHTING, MISC.: RESTORE STRUCTURE GROUNDING | 1 EACH | $1,600 | $2,600 | $1,916 | $6,700 | $1,710 |
| 625E98000 LIGHTING, MISC.: RESUE EXISTING CIRCUIT CABLE | 1 EACH | $1,100 | $528 | $1,378 | $1,200 | $1,230 |
| 625E98000 LIGHTING, MISC.:GROUND PULL BOX LID | 8 EACH | $75.00 | $105 | $97.50 | $50.00 | $87.00 |
| 620E00500 DELINEATOR, POST MOUNTED | 99 EACH | $44.00 | $47.00 | $61.83 | $45.00 | $45.00 |
| 621E00100 RPM | 1,626 EACH | $22.90 | $23.00 | $24.75 | $24.50 | $23.70 |
| 625E32000 GROUND ROD | 15 EACH | $200 | $250 | $262 | $235 | $250 |
| 626E00100 BARRIER REFLECTOR | 843 EACH | $7.00 | $7.00 | $7.49 | $7.00 | $7.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 336 FT | $12.50 | $10.00 | $10.93 | $10.00 | $10.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 284.8 FT | $11.00 | $12.00 | $12.57 | $11.50 | $11.50 |
| 630E03101 GROUND MOUNTED SUPPORT, NO. 3 POST, AS PER PLAN | 272 FT | $25.00 | $18.00 | $18.58 | $17.00 | $17.00 |
| 630E11206 OVERHEAD SIGN SUPPORT, TYPE TC-16.21, DESIGN 13 | 1 EACH | $9,700 | $15,000 | $15,574 | $14,250 | $14,250 |
| 630E45500 OVERHEAD SIGN SUPPORT, TYPE TC-7.65, DESIGN 8 | 1 EACH | $35,000 | $40,000 | $42,186 | $38,600 | $38,600 |
| 630E75000 SIGN ATTACHMENT ASSEMBLY | 43 EACH | $500 | $500 | $530 | $585 | $485 |
| 630E79100 SIGN HANGER ASSEMBLY, MAST ARM | 2 EACH | $275 | $360 | $377 | $345 | $345 |
| 630E79610 SIGN SUPPORT ASSEMBLY, BARRIER MOUNTED | 27 EACH | $675 | $550 | $574 | $525 | $525 |
| 630E80100 SIGN, FLAT SHEET | 604.6 SF | $18.00 | $13.00 | $13.66 | $12.50 | $12.50 |
| 630E80100 SIGN, FLAT SHEET, 730.20 | 12 SF | $35.00 | $18.00 | $19.13 | $17.50 | $17.50 |
| 630E80101 SIGN, FLAT SHEET, AS PER PLAN | 107.3 SF | $21.00 | $22.00 | $22.95 | $21.00 | $21.00 |
| 630E80224 SIGN, OVERHEAD EXTRUSHEET | 132 SF | $20.00 | $23.00 | $24.32 | $22.25 | $22.25 |
| 630E82000 SIGN BACKING ASSEMBLY | 24 EACH | $125 | $153 | $158 | $145 | $145 |
| 630E84010 CONCRETE BARRIER MEDIAN OVERHEAD SIGN SUPPORT FOUN | 7 EACH | $13,500 | $14,000 | $10,765 | $9,850 | $9,850 |
| 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION | 8 EACH | $4,900 | $5,500 | $5,705 | $5,220 | $5,220 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 95 EACH | $15.00 | $10.00 | $10.93 | $10.00 | $10.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 7 EACH | $50.00 | $47.00 | $49.18 | $45.00 | $45.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 37 EACH | $18.00 | $10.00 | $10.93 | $10.00 | $10.00 |
| 630E86003 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 8 EACH | $90.00 | $42.00 | $43.72 | $40.00 | $40.00 |
| 630E86011 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT | 2 EACH | $60.00 | $232 | $240 | $220 | $220 |
| 630E87100 REMOVAL OF OVERHEAD MOUNTED SIGN AND REERECTION | 26 EACH | $500 | $184 | $191 | $175 | $175 |
| 630E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL | 5 EACH | $200 | $396 | $410 | $375 | $375 |
| 630E89400 REMOVAL OF OVERHEAD SIGN SUPPORT AND REERECTION, T | 5 EACH | $6,500 | $12,000 | $12,732 | $11,650 | $11,650 |
| 630E89401 REMOVAL OF OVERHEAD SIGN SUPPORT AND REERECTION, T | 1 EACH | $7,600 | $17,000 | $17,951 | $16,425 | $16,425 |
| 630E89702 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL | 2 EACH | $1,300 | $2,000 | $2,131 | $1,950 | $1,950 |
| 630E89902 REMOVAL OF MISCELLANEOUS TRAFFIC CONTROL ITEM, BAR | 25 EACH | $290 | $130 | $137 | $125 | $125 |
| 630E89902 REMOVAL OF MISCELLANEOUS TRAFFIC CONTROL ITEM, BEA | 4 EACH | $450 | $338 | $350 | $320 | $320 |
| 630E97700 SIGNING, MISC.: OVERHEAD SIGN CLEARANCE | 7 EACH | $1,500 | $2,300 | $2,459 | $2,250 | $2,250 |
| 646E10000 EDGE LINE, 4" | 0.72 MILE | $2,400 | $5,900 | $2,770 | $2,400 | $2,589 |
| 646E10010 EDGE LINE, 6" | 28.79 MILE | $2,600 | $3,800 | $2,985 | $2,950 | $2,790 |
| 646E10100 LANE LINE, 4" | 0.41 MILE | $1,000 | $4,000 | $1,338 | $1,500 | $1,250 |
| 646E10110 LANE LINE, 6" | 25.95 MILE | $1,300 | $2,500 | $1,498 | $1,500 | $1,400 |
| 646E10200 CENTER LINE | 0.72 MILE | $7,000 | $7,000 | $8,025 | $5,800 | $7,500 |
| 646E10300 CHANNELIZING LINE, 8" | 2,694 FT | $1.95 | $2.20 | $2.09 | $1.90 | $1.95 |
| 646E10310 CHANNELIZING LINE, 12" | 10,017 FT | $2.00 | $2.80 | $2.14 | $2.25 | $2.00 |
| 646E10400 STOP LINE | 393 FT | $12.50 | $14.00 | $13.38 | $11.00 | $12.50 |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 467 FT | $10.00 | $9.00 | $11.77 | $8.75 | $11.00 |
| 646E10620 CHEVRON MARKING | 693 FT | $11.00 | $10.00 | $11.77 | $8.75 | $11.00 |
| 646E10800 ISLAND MARKING | 373 SF | $10.00 | $7.80 | $10.97 | $4.00 | $10.25 |
| 646E20300 LANE ARROW | 55 EACH | $200 | $200 | $214 | $160 | $200 |
| 646E20350 LANE REDUCTION ARROW | 1 EACH | $500 | $420 | $535 | $295 | $500 |
| 646E20502 DOTTED LINE, 4" | 725 FT | $1.75 | $5.00 | $1.87 | $4.00 | $1.75 |
| 646E20504 DOTTED LINE, 6" | 13,315 FT | $1.80 | $2.00 | $1.93 | $2.00 | $1.80 |
| 646E20600 BIKE LANE SYMBOL MARKING | 8 EACH | $450 | $260 | $482 | $395 | $450 |
| 646E50000 REMOVAL OF PAVEMENT MARKING | 4 EACH | $100 | $420 | $958 | $400 | $895 |
| 625E25401 CONDUIT, 2", 725.04, AS PER PLAN | 638 FT | $30.00 | $10.00 | $33.90 | $12.00 | $30.25 |
| 625E25501 CONDUIT, 3", 725.04, AS PER PLAN | 55 FT | $44.00 | $21.00 | $53.57 | $22.00 | $47.80 |
| 625E25601 CONDUIT, 4", 725.04, AS PER PLAN | 28 FT | $65.00 | $26.00 | $78.73 | $40.00 | $70.25 |
| 625E25903 CONDUIT, JACKED OR DRILLED, 725.04, AS PER PLAN, 3 | 428 FT | $60.00 | $36.00 | $68.36 | $38.00 | $61.00 |
| 625E29000 TRENCH | 707 FT | $7.00 | $5.00 | $8.07 | $10.00 | $7.20 |
| 625E30701 PULL BOX, 725.08, 18", AS PER PLAN | 5 EACH | $750 | $790 | $891 | $800 | $795 |
| 625E30707 PULL BOX, 725.08, 24", AS PER PLAN | 2 EACH | $900 | $950 | $1,104 | $900 | $985 |
| 625E31510 PULL BOX REMOVED | 2 EACH | $150 | $105 | $200 | $100 | $179 |
| 625E32001 GROUND ROD, AS PER PLAN | 7 EACH | $120 | $184 | $142 | $235 | $127 |
| 625E36001 PLASTIC CAUTION TAPE, AS PER PLAN | 707 FT | $0.30 | $0.25 | $0.30 | $0.20 | $0.27 |
| 625E39520 PULL BOX CLEANED | 2 EACH | $300 | $105 | $368 | $25.00 | $329 |
| 632E05001 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 6 EACH | $830 | $920 | $949 | $800 | $847 |
| 632E05061 VEHICULAR SIGNAL HEAD, (LED), 4-SECTION, 12" LENS, | 4 EACH | $945 | $1,000 | $1,132 | $950 | $1,010 |
| 632E05081 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 2 EACH | $1,200 | $1,200 | $1,489 | $1,200 | $1,329 |
| 632E26500 DETECTOR LOOP | 4 EACH | $1,600 | $1,584 | $2,017 | $1,450 | $1,800 |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 9 EACH | $1,800 | $1,690 | $2,146 | $1,100 | $1,915 |
| 632E27200 LOOP DETECTOR TIE IN | 9 EACH | $400 | $158 | $497 | $40.00 | $444 |
| 632E30500 MESSENGER WIRE, MISC.: UNLASH AND RELASH MESSENGER | 179 FT | $16.00 | $2.00 | $22.30 | $4.00 | $19.90 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 665 FT | $8.00 | $2.60 | $9.18 | $2.20 | $8.19 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 497 FT | $8.00 | $3.00 | $9.44 | $2.40 | $8.42 |
| 632E64010 SIGNAL SUPPORT FOUNDATION | 5 EACH | $2,800 | $3,600 | $3,278 | $5,100 | $2,925 |
| 632E65200 LOOP DETECTOR LEAD-IN CABLE | 866 FT | $1.70 | $2.20 | $2.07 | $1.00 | $1.85 |
| 632E68300 POWER CABLE, 3 CONDUCTOR, NO. 6 AWG | 397 FT | $4.70 | $5.00 | $5.52 | $2.00 | $4.93 |
| 632E70001 POWER SERVICE, AS PER PLAN | 2 EACH | $2,100 | $1,500 | $2,555 | $1,600 | $2,280 |
| 632E70400 CONDUIT RISER, 2" DIAMETER | 1 EACH | $500 | $420 | $626 | $250 | $559 |
| 632E75133 SIGNAL SUPPORT, TYPE TC-12.30 DESIGN 5 POLE, WITH | 1 EACH | $15,500 | $15,600 | $18,695 | $1,250 | $16,682 |
| 632E80203 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 2, AS PER PL | 1 EACH | $6,100 | $6,000 | $7,325 | $1,250 | $6,536 |
| 632E80403 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 4, AS PER PL | 1 EACH | $8,800 | $7,900 | $10,332 | $1,250 | $9,220 |
| 632E80503 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 11, AS PER P | 2 EACH | $9,300 | $10,000 | $12,146 | $1,250 | $10,838 |
| 632E90201 REUSE OF VEHICULAR SIGNAL HEAD, AS PER PLAN | 2 EACH | $270 | $260 | $313 | $200 | $279 |
| 632E90400 SIGNALIZATION, MISC.: TEST HOLE PERFORMED | 5 EACH | $180 | $520 | $222 | $200 | $198 |
| 632E90400 SIGNALIZATION, MISC.:REUSE CABLE | 2 EACH | $600 | $1,000 | $706 | $200 | $630 |
| 633E01581 CONTROLLER UNIT, TYPE TS2/A2, WITH CABINET, TYPE T | 2 EACH | $15,000 | $14,500 | $17,466 | $16,000 | $15,585 |
| 633E39000 CONTROLLER, MASTER, TRAFFIC RESPONSIVE | 1 EACH | $8,800 | $8,400 | $10,324 | $10,000 | $9,213 |
| 633E67001 CABINET RISER, AS PER PLAN | 4 EACH | $600 | $475 | $686 | $600 | $612 |
| 633E67101 CABINET FOUNDATION, AS PER PLAN | 2 EACH | $1,900 | $1,500 | $2,353 | $2,750 | $2,100 |
| 633E67201 CONTROLLER WORK PAD, AS PER PLAN | 2 EACH | $500 | $528 | $639 | $400 | $570 |
| 633E67301 PREEMPTION, AS PER PLAN | 2 EACH | $795 | $1,050 | $909 | $800 | $811 |
| 633E67310 PREEMPTION RECEIVING UNIT | 2 EACH | $3,700 | $1,050 | $4,444 | $4,000 | $3,965 |
| 633E67320 PREEMPTION DETECTOR CABLE | 221 FT | $8.00 | $3.00 | $10.02 | $3.40 | $8.94 |
| 633E67350 PREEMPTION PHASE SELECTOR | 2 EACH | $3,700 | $5,200 | $4,540 | $4,400 | $4,051 |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 2 EACH | $4,500 | $5,200 | $5,255 | $4,500 | $4,689 |
| 633E99000 CONTROLLER ITEM, MISC.: CABINET WIRING AND MODIFIC | 1 EACH | $2,000 | $1,500 | $2,297 | $1,250 | $2,050 |
| 633E99000 CONTROLLER ITEM, MISC.: PROGRAMMING OF NEW SIGNAL | 1 EACH | $560 | $520 | $658 | $400 | $588 |
| AA2 633E67401 PREEMPTION CONFIRMATION LIGHT, AS PER PLANRAB LIGH | 6 EACH | $503 | $1,050 | $564 | $200 | $1,500 |
| AA2 815E30001 SPREAD SPECTRUM RADIO, AS PER PLAN, INTUICOM COMMU | 2 EACH | $2,390 | $2,600 | $2,678 | $1,750 | $3,500 |
| AA2 816E30001 VIDEO DETECTION SYSTEM, AS PER PLAN, ECONOLITE AUT | 2 EACH | $19,100 | $21,000 | $21,382 | $17,500 | $15,000 |
| 202E30700 CONCRETE BARRIER REMOVED | 557 FT | $10.00 | $13.00 | $11.75 | $31.14 | $13.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE | 18,000 SY | $2.00 | $1.50 | $3.33 | $2.85 | $3.15 |
| 254E01010 PAVEMENT PLANING, PORTLAND CEMENT CONCRETE | 803 SY | $10.00 | $8.00 | $10.17 | $12.75 | $20.00 |
| 407E20500 SPECIAL - TACK COAT, TRACKLESS TACK | 1,350 GAL | $3.00 | $3.00 | $4.21 | $2.75 | $3.00 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 17 CY | $50.00 | $84.00 | $47.84 | $95.00 | $150 |
| 441E50201 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (407 CY | $190 | $250 | $176 | $212 | $155 |
| 442E10001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 750 CY | $185 | $168 | $170 | $222 | $230 |
| 611E04400 12" CONDUIT, TYPE B | 145 FT | $88.00 | $50.00 | $273 | $121 | $65.00 |
| 611E97010 SLOTTED DRAIN, TYPE 2, 12" | 780 FT | $125 | $105 | $96.32 | $76.50 | $130 |
| 611E98450 CATCH BASIN, NO. 2-2A | 1 EACH | $1,700 | $2,000 | $1,726 | $1,450 | $1,200 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 1 EACH | $500 | $1,000 | $957 | $950 | $800 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 3,600 HOUR | $70.00 | $50.00 | $65.27 | $65.00 | $75.00 |
| 614E11500 WORKSITE TRAFFIC SUPERVISOR | 48 MNTH | $4,000 | $10,000 | $11,353 | $7,000 | $4,200 |
| 614E11630 INCREASED BARRIER DELINEATION | 15,299 FT | $0.75 | $3.00 | $0.29 | $3.00 | $3.00 |
| 614E12336 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL) | 72 EACH | $2,200 | $1,800 | $2,532 | $1,780 | $1,878 |
| 614E12410 SPEED ZONE AHEAD SYMBOL SIGN | 2 EACH | $75.00 | $184 | $398 | $175 | $175 |
| 614E12420 DETOUR SIGNING | 1 LS | $55,000 | $70,000 | $46,304 | $67,775 | $67,775 |
| 614E12460 WORK ZONE MARKING SIGN | 12 EACH | $75.00 | $79.00 | $398 | $155 | $120 |
| 614E12470 WORK ZONE SPEED LIMIT SIGN | 52 EACH | $75.00 | $160 | $286 | $155 | $155 |
| 614E12484 WORK ZONE INCREASED PENALTIES SIGN | 44 EACH | $145 | $160 | $283 | $155 | $155 |
| 614E12756 WORK ZONE CROSSOVER LIGHTING SYSTEM | 2 EACH | $25,200 | $26,000 | $28,241 | $39,800 | $25,200 |
| 614E12800 WORK ZONE RAISED PAVEMENT MARKER | 1,156 EACH | $22.00 | $12.00 | $12.84 | $12.00 | $12.00 |
| 614E12801 WORK ZONE RAISED PAVEMENT MARKER, AS PER PLAN | 1,481 EACH | $26.00 | $22.00 | $23.38 | $22.00 | $17.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 190 CY | $150 | $200 | $160 | $190 | $203 |
| 614E13200 BARRIER REFLECTOR, TYPE A | 76 EACH | $8.00 | $10.00 | $3.70 | $10.00 | $10.00 |
| 614E13300 BARRIER REFLECTOR, TYPE B | 8,379 EACH | $7.00 | $5.50 | $3.75 | $5.25 | $5.25 |
| 614E13302 BARRIER REFLECTOR, TYPE B2 | 1,201 EACH | $10.00 | $6.00 | $3.80 | $5.75 | $5.75 |
| 614E13350 OBJECT MARKER, ONE WAY | 2,187 EACH | $12.00 | $14.00 | $10.22 | $13.50 | $13.50 |
| 614E13360 OBJECT MARKER, TWO WAY | 1,833 EACH | $13.00 | $17.00 | $8.39 | $16.50 | $16.50 |
| 614E18000 MAINTAINING TRAFFIC, MISC.:BRIDGE DECK AND PAVEMEN | 300,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 60 SNMT | $1,200 | $900 | $571 | $625 | $520 |
| 614E20001 WORK ZONE LANE LINE, CLASS I, AS PER PLAN | 45.99 MILE | $485 | $500 | $519 | $485 | $485 |
| 614E21001 WORK ZONE CENTER LINE, CLASS I, AS PER PLAN | 1.47 MILE | $1,000 | $1,000 | $1,070 | $1,000 | $1,000 |
| 614E22001 WORK ZONE EDGE LINE, CLASS I, AS PER PLAN | 269.65 MILE | $715 | $750 | $765 | $715 | $715 |
| 614E23001 WORK ZONE CHANNELIZING LINE, CLASS I, AS PER PLAN | 95,384 FT | $0.60 | $0.60 | $0.64 | $0.60 | $0.60 |
| 614E24001 WORK ZONE DOTTED LINE, CLASS I, AS PER PLAN | 77,958 FT | $0.60 | $0.60 | $0.64 | $0.60 | $0.60 |
| 614E25000 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS I | 4,264 FT | $2.35 | $2.40 | $2.51 | $2.35 | $2.35 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 590 FT | $2.75 | $2.90 | $2.94 | $2.75 | $2.75 |
| 614E30000 WORK ZONE ARROW, CLASS I | 114 EACH | $45.00 | $47.00 | $48.15 | $45.00 | $45.00 |
| 614E32700 WORK ZONE ISLAND MARKING, CLASS I | 1,078 SF | $3.25 | $3.00 | $3.48 | $3.25 | $3.25 |
| 614E98000 WORK ZONE PAVEMENT MARKING, MISC.:THERMOPLASTIC ED | 111.06 MILE | $1,275 | $1,300 | $1,364 | $1,275 | $1,275 |
| 614E98000 WORK ZONE PAVEMENT MARKING, MISC.:THERMOPLASTIC LA | 56.72 MILE | $650 | $680 | $696 | $650 | $650 |
| 614E98100 WORK ZONE PAVEMENT MARKING, MISC.:HERMOPLASTIC TRA | 1,465 FT | $5.50 | $5.50 | $5.89 | $5.50 | $5.50 |
| 614E98100 WORK ZONE PAVEMENT MARKING, MISC.:THERMOPLASTIC CH | 33,901 FT | $0.65 | $0.70 | $0.70 | $0.65 | $0.65 |
| 614E98100 WORK ZONE PAVEMENT MARKING, MISC.:THERMOPLASTIC DO | 39,971 FT | $0.55 | $0.60 | $0.70 | $0.55 | $0.55 |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $125,000 | $50,000 | $207,609 | $1,000,000 | $60,000 |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 419 SY | $75.00 | $58.00 | $36.94 | $59.33 | $80.00 |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 1,188 SY | $50.00 | $44.00 | $28.34 | $35.19 | $40.00 |
| 616E10000 WATER | 800 MGAL | $40.00 | $44.00 | $39.84 | $20.00 | $30.00 |
| 621E00100 RPM | 750 EACH | $24.15 | $23.00 | $24.75 | $24.15 | $23.70 |
| 622E10140 CONCRETE BARRIER, SINGLE SLOPE, TYPE C1 | 310 FT | $180 | $130 | $118 | $184 | $140 |
| 622E25014 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 4 EACH | $3,900 | $3,000 | $2,729 | $2,700 | $2,700 |
| 622E41000 PORTABLE BARRIER, 32" | 49,160 FT | $12.00 | $7.00 | $1.00 | $20.85 | $13.50 |
| 622E41020 PORTABLE BARRIER, 32", BRIDGE MOUNTED | 540 FT | $35.00 | $28.00 | $21.02 | $36.00 | $19.00 |
| 622E41031 PORTABLE BARRIER, 50", BRIDGE MOUNTED, AS PER PLAN | 1,080 FT | $35.00 | $28.00 | $23.88 | $30.00 | $15.00 |
| 622E41050 PORTABLE BARRIER, "Y" CONNECTOR | 3 EACH | $500 | $1,100 | $937 | $3,050 | $2,150 |
| 622E90000 BARRIER, MISC.: CONCRETE BARRIER, TYPE B50 | 247 FT | $140 | $115 | $219 | $260 | $500 |
| 630E07001 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W8X18, AS | 136.2 FT | $30.00 | $68.00 | $71.04 | $65.00 | $65.00 |
| 630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION | 6 EACH | $415 | $440 | $464 | $425 | $425 |
| 630E80201 SIGN, GROUND MOUNTED EXTRUSHEET, AS PER PLAN | 796.5 SF | $15.00 | $21.00 | $21.86 | $20.00 | $20.00 |
| 630E84501 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION, | 6 EACH | $800 | $920 | $956 | $875 | $875 |
| 690E13000 SPECIAL - RUMBLE STRIPS | 1,844 FT | $10.00 | $4.00 | $8.89 | $2.50 | $3.50 |
| 615E25001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B, AS PER | 1,000 SY | $45.00 | $32.00 | $90.68 | $26.00 | $65.00 |
| 615E25001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B, AS PER | 1,000 SY | $35.00 | $33.00 | $90.68 | $43.00 | $75.00 |
| 615E25001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B, AS PER | 24,252 SY | $25.00 | $22.00 | $20.38 | $25.30 | $24.00 |
| 615E25001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B, AS PER | 28,468 SY | $20.00 | $18.00 | $22.66 | $14.00 | $20.00 |
| 202E75260 VANDAL PROTECTION FENCE REMOVED | 7 FT | $20.00 | $410 | $36.28 | $32.00 | $32.00 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 1,560 SY | $21.50 | $23.00 | $23.78 | $15.75 | $16.50 |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 1,560 SY | $12.00 | $12.50 | $23.78 | $19.85 | $20.00 |
| 516E15000 STRUCTURAL JOINT OR JOINT SEALER, MISC.:REPAIR SID | 1 EACH | $2,000 | $4,000 | $3,745 | $3,500 | $1,885 |
| 519E11100 PATCHING CONCRETE STRUCTURE | 156 SF | $85.00 | $92.00 | $88.28 | $102 | $85.00 |
| 530E00600 SPECIAL - STRUCTURE, MISC.:CONCRETE SPALL REMOVAL | 96 SF | $5.00 | $21.00 | $26.75 | $42.00 | $5.00 |
| 607E39931 VANDAL PROTECTION FENCE, 12' CURVED, COATED FABRIC | 7 FT | $150 | $417 | $450 | $397 | $395 |
| 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA | 195 SF | $65.00 | $100 | $90.95 | $99.50 | $65.00 |
| 513E90000 STRUCTURAL STEEL, MISC.:STEEL BEAM REPAIRS | 2,400 LB | $1.25 | $8.00 | $1.07 | $2.70 | $12.50 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $200,000 | $172,000 | $374,500 | $325,000 | $150,000 |
| 202E22900 APPROACH SLAB REMOVED | 560 SY | $25.00 | $21.00 | $32.10 | $30.00 | $35.00 |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $50,000 | $26,000 | $37,450 | $45,000 | $40,000 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $18,000 | $32,000 | $58,850 | $50,000 | $50,000 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $12,000 | $41,000 | $10,700 | $25,000 | $20,000 |
| 507E00100 STEEL PILES HP10X42, FURNISHED | 1,320 FT | $30.00 | $22.00 | $37.45 | $23.00 | $40.00 |
| 507E00150 STEEL PILES HP10X42, DRIVEN | 1,220 FT | $15.00 | $15.00 | $10.70 | $30.00 | $13.00 |
| 507E93300 STEEL POINTS OR SHOES | 20 EACH | $140 | $90.00 | $214 | $130 | $125 |
| 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN | 282,482 LB | $1.05 | $1.00 | $1.18 | $1.07 | $1.33 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 146 LB | $3.00 | $1.00 | $1.07 | $1.80 | $5.00 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 1,180 EACH | $15.00 | $24.00 | $17.12 | $18.50 | $20.00 |
| 511E21534 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE | 834 CY | $625 | $692 | $861 | $615 | $700 |
| 511E33501 SEMI-INTEGRAL DIAPHRAGM GUIDE, AS PER PLAN | 4 EACH | $3,900 | $1,800 | $3,638 | $1,850 | $2,600 |
| 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 152 CY | $560 | $456 | $589 | $630 | $500 |
| 511E43212 CLASS QC1 CONCRETE WITH QC/QA, PIER | 85 CY | $700 | $790 | $1,177 | $725 | $850 |
| 511E45712 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT | 130 CY | $475 | $700 | $792 | $450 | $550 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 1,555 SY | $21.50 | $23.00 | $23.78 | $15.75 | $16.50 |
| 512E33000 TYPE 2 WATERPROOFING | 27 SY | $30.00 | $35.00 | $32.10 | $18.00 | $23.00 |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 440 SY | $12.00 | $13.00 | $23.78 | $20.00 | $20.00 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 12,465 EACH | $3.25 | $3.00 | $3.85 | $3.40 | $3.25 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 30,400 SF | $4.00 | $6.50 | $3.56 | $4.25 | $6.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 30,400 SF | $4.00 | $2.00 | $3.56 | $1.50 | $2.00 |
| 514E10000 FINAL INSPECTION REPAIR | 29 EACH | $1.00 | $1.00 | $1.07 | $170 | $300 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 181 SF | $8.00 | $11.00 | $14.98 | $7.00 | $8.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 322 FT | $35.00 | $24.00 | $53.50 | $48.00 | $35.00 |
| 516E44101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 30 EACH | $680 | $960 | $642 | $805 | $1,000 |
| 516E44201 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 30 EACH | $1,000 | $980 | $942 | $830 | $1,400 |
| 518E12300 SCUPPERS, INCLUDING SUPPORTS | 1 EACH | $980 | $1,400 | $1,391 | $1,450 | $1,700 |
| 518E12301 SCUPPERS, INCLUDING SUPPORTS, AS PER PLAN | 3 EACH | $1,000 | $1,400 | $1,391 | $1,450 | $1,700 |
| 518E21200 POROUS BACKFILL WITH FILTER FABRIC | 194 CY | $60.00 | $70.00 | $107 | $85.00 | $88.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 310 FT | $10.00 | $5.00 | $10.70 | $12.00 | $15.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 62 FT | $30.00 | $5.00 | $21.40 | $12.00 | $12.00 |
| 526E25011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 666 SY | $270 | $276 | $257 | $270 | $300 |
| 526E90010 TYPE A INSTALLATION | 292 FT | $110 | $119 | $139 | $80.00 | $125 |
| 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA | 252 SF | $65.00 | $100 | $88.28 | $88.00 | $65.00 |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 122 CF | $300 | $317 | $385 | $435 | $297 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $140,000 | $180,000 | $288,900 | $275,000 | $150,000 |
| 202E22900 APPROACH SLAB REMOVED | 582 SY | $25.00 | $24.00 | $32.10 | $30.00 | $35.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $28,000 | $12,000 | $32,100 | $65,000 | $40,000 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $12,000 | $18,000 | $53,500 | $15,000 | $45,000 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 235,708 LB | $1.05 | $1.00 | $1.18 | $1.05 | $1.33 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 576 EACH | $15.00 | $20.00 | $17.12 | $18.00 | $20.00 |
| 511E21534 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE | 809 CY | $640 | $709 | $883 | $610 | $700 |
| 511E33501 SEMI-INTEGRAL DIAPHRAGM GUIDE, AS PER PLAN | 4 EACH | $3,900 | $1,900 | $3,638 | $1,800 | $2,700 |
| 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 166 CY | $580 | $430 | $589 | $625 | $450 |
| 511E41010 CLASS QC1 CONCRETE, PIER ABOVE FOOTINGS | 41 CY | $725 | $900 | $1,873 | $950 | $1,100 |
| 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING | 34 CY | $500 | $985 | $813 | $585 | $700 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 1,940 SY | $21.50 | $22.00 | $23.78 | $21.50 | $16.50 |
| 512E33000 TYPE 2 WATERPROOFING | 9 SY | $30.00 | $35.00 | $32.10 | $18.00 | $25.00 |
| 513E10260 STRUCTURAL STEEL MEMBERS, LEVEL 3 | 13,253 LB | $10.00 | $10.50 | $11.77 | $7.50 | $5.00 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 9,870 EACH | $3.50 | $3.00 | $4.28 | $3.70 | $3.50 |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 28,500 SF | $8.00 | $9.50 | $9.84 | $7.35 | $8.00 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIM | 28,500 SF | $2.00 | $2.00 | $0.80 | $0.80 | $2.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 29,500 SF | $1.50 | $1.50 | $1.61 | $1.00 | $1.25 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 29,500 SF | $1.00 | $1.00 | $1.61 | $1.00 | $1.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 51 MNHR | $120 | $100 | $161 | $23.20 | $100 |
| 514E10000 FINAL INSPECTION REPAIR | 29 EACH | $275 | $200 | $482 | $170 | $200 |
| 516E10010 ARMORLESS PREFORMED JOINT SEAL | 220 FT | $35.00 | $47.00 | $32.10 | $33.00 | $35.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 41 SF | $7.00 | $7.00 | $10.70 | $5.50 | $7.50 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 555 SF | $8.00 | $7.00 | $14.98 | $7.00 | $7.55 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 236 FT | $34.00 | $25.00 | $53.50 | $50.00 | $34.00 |
| 516E44101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 14 EACH | $693 | $960 | $749 | $805 | $1,000 |
| 516E44101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 14 EACH | $805 | $960 | $813 | $805 | $1,100 |
| 516E44101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 14 EACH | $1,044 | $960 | $1,043 | $805 | $1,400 |
| 516E44101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 14 EACH | $657 | $960 | $674 | $805 | $1,000 |
| 516E44101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 14 EACH | $1,092 | $960 | $1,059 | $805 | $1,200 |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $25,000 | $26,500 | $80,250 | $60,000 | $40,000 |
| 518E12200 SCUPPERS, INCLUDING SUPPORTS | 5 EACH | $988 | $1,250 | $1,498 | $1,400 | $2,000 |
| 518E12500 SCUPPER, MISC.: TEMPORARY SCUPPERS ON EXISTING BRI | 5 EACH | $800 | $1,500 | $1,070 | $2,400 | $2,400 |
| 518E21200 POROUS BACKFILL WITH FILTER FABRIC | 132 CY | $60.00 | $70.00 | $107 | $82.00 | $90.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 230 FT | $10.00 | $5.00 | $9.63 | $12.00 | $16.00 |
| 518E40011 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 90 FT | $30.00 | $5.00 | $21.40 | $12.00 | $34.00 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 100 SF | $85.00 | $88.00 | $96.30 | $108 | $85.00 |
| 526E25011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 611 SY | $270 | $265 | $257 | $280 | $325 |
| 526E90030 TYPE C INSTALLATION | 220 FT | $120 | $180 | $139 | $145 | $165 |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 17,700 SF | $8.00 | $8.50 | $11.77 | $8.70 | $10.00 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIM | 17,700 SF | $2.00 | $2.00 | $0.54 | $2.15 | $3.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 17,700 SF | $1.50 | $1.50 | $1.07 | $3.50 | $2.50 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 17,700 SF | $1.00 | $1.00 | $1.07 | $3.50 | $2.25 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 26 MNHR | $120 | $100 | $171 | $23.36 | $110 |
| 514E10000 FINAL INSPECTION REPAIR | 16 EACH | $275 | $300 | $482 | $170 | $300 |
| 516E45305 REFURBISH BEARING DEVICE, AS PER PLAN | 20 EACH | $250 | $550 | $1.07 | $500 | $200 |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $12,500 | $14,000 | $1.07 | $10,000 | $20,000 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 1,500 SY | $25.00 | $22.00 | $23.78 | $15.75 | $16.50 |
| 513E90000 STRUCTURAL STEEL, MISC.:STEEL BEAM REPAIRS | 1,200 LB | $15.00 | $8.00 | $1.07 | $9.30 | $11.00 |
| 202E22901 APPROACH SLAB REMOVED, AS PER PLAN | 604 SY | $25.00 | $25.00 | $32.10 | $35.00 | $80.00 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 460 LB | $3.00 | $2.00 | $1.13 | $3.00 | $2.25 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 880 SY | $21.50 | $22.00 | $23.78 | $15.75 | $16.50 |
| 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS | 1,415 SY | $7.50 | $8.00 | $7.13 | $7.00 | $7.50 |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 880 SY | $12.00 | $12.00 | $23.78 | $19.85 | $20.00 |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 15,200 SF | $8.00 | $8.50 | $11.77 | $7.65 | $7.00 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIM | 15,200 SF | $2.00 | $2.00 | $0.54 | $1.00 | $1.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 15,200 SF | $1.00 | $1.00 | $1.07 | $1.35 | $2.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 15,200 SF | $1.00 | $1.00 | $1.07 | $1.40 | $1.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 28 MNHR | $120 | $100 | $161 | $23.20 | $120 |
| 514E10000 FINAL INSPECTION REPAIR | 16 EACH | $275 | $300 | $482 | $170 | $300 |
| 526E25011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 604 SY | $270 | $315 | $284 | $325 | $300 |
| 526E90010 TYPE A INSTALLATION | 217 FT | $120 | $158 | $139 | $190 | $125 |
| 530E00600 SPECIAL - STRUCTURE, MISC.:CONCRETE SPALL REMOVAL | 357 SF | $5.00 | $21.00 | $21.40 | $24.57 | $5.00 |
| 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA | 546 SF | $65.00 | $100 | $85.44 | $89.00 | $65.00 |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 91 CF | $150 | $320 | $364 | $435 | $300 |
| 513E90000 STRUCTURAL STEEL, MISC.:STEEL BEAM REPAIRS | 1,100 LB | $4.50 | $8.00 | $1.07 | $9.50 | $11.00 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 20 SF | $120 | $100 | $357 | $98.00 | $150 |
| 202E22901 APPROACH SLAB REMOVED, AS PER PLAN | 607 SY | $25.00 | $24.00 | $32.10 | $35.00 | $80.00 |
| 202E98200 REMOVAL MISC.:PIPE ENCASEMENT REMOVAL | 24 FT | $75.00 | $370 | $268 | $120 | $125 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $5,000 | $6,400 | $6,420 | $2,000 | $8,000 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $5,000 | $2,700 | $6,420 | $1,200 | $5,000 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 512 LB | $3.00 | $3.00 | $1.13 | $3.00 | $2.08 |
| 511E50210 CLASS QC1 CONCRETE, SUBSTRUCTURE | 2 CY | $2,500 | $6,500 | $5,350 | $3,500 | $2,500 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 674 SY | $21.50 | $23.00 | $23.78 | $15.75 | $16.50 |
| 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS | 1,422 SY | $7.50 | $23.00 | $7.13 | $7.00 | $7.50 |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 19,300 SF | $9.00 | $10.00 | $11.77 | $14.75 | $7.00 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIM | 19,300 SF | $2.00 | $2.00 | $0.54 | $0.90 | $2.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 19,300 SF | $1.00 | $1.00 | $1.07 | $1.00 | $1.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 19,300 SF | $1.00 | $1.00 | $1.07 | $1.00 | $1.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 27 MNHR | $120 | $100 | $161 | $23.20 | $100 |
| 514E10000 FINAL INSPECTION REPAIR | 15 EACH | $275 | $300 | $482 | $170 | $200 |
| 517E75501 BRIDGE RAILING REBUILT, AS PER PLAN | 7 FT | $200 | $180 | $284 | $175 | $175 |
| 526E25011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 607 SY | $270 | $340 | $278 | $325 | $300 |
| 526E90010 TYPE A INSTALLATION | 252 FT | $120 | $200 | $139 | $190 | $125 |
| 530E00600 SPECIAL - STRUCTURE, MISC.:CONCRETE SPALL REMOVAL | 216 SF | $5.00 | $21.00 | $26.75 | $36.95 | $5.00 |
| 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA | 846 SF | $65.00 | $150 | $80.25 | $95.00 | $65.00 |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 105 CF | $150 | $300 | $364 | $435 | $300 |
| 513E90000 STRUCTURAL STEEL, MISC.:STEEL BEAM REPAIRS | 1,000 LB | $15.00 | $7.00 | $10.70 | $9.50 | $11.00 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 20 SF | $120 | $100 | $357 | $98.00 | $150 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $20,000 | $100,000 | $50,290 | $95,000 | $50,000 |
| 202E22901 APPROACH SLAB REMOVED, AS PER PLAN | 606 SY | $25.00 | $24.00 | $32.10 | $35.00 | $80.00 |
| 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN | 4,177 LB | $1.05 | $2.00 | $1.18 | $2.00 | $1.30 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 475 LB | $3.00 | $2.00 | $1.18 | $2.00 | $2.18 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 436 EACH | $15.00 | $26.00 | $17.12 | $25.00 | $20.00 |
| 511E34410 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 31 CY | $725 | $3,600 | $1,498 | $3,500 | $1,900 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 4,575 SY | $21.50 | $22.00 | $23.78 | $15.75 | $15.00 |
| 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS | 7,980 SY | $5.50 | $7.50 | $7.13 | $7.00 | $5.50 |
| 513E90000 STRUCTURAL STEEL, MISC.:STEEL BEAM REPAIRS | 10,000 LB | $5.00 | $7.00 | $5.35 | $13.65 | $11.00 |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 101,600 SF | $6.00 | $6.50 | $9.63 | $6.40 | $6.00 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIM | 101,600 SF | $1.00 | $1.00 | $0.35 | $1.07 | $1.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 101,600 SF | $1.00 | $1.00 | $0.35 | $1.25 | $1.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 101,600 SF | $1.00 | $1.00 | $0.35 | $1.00 | $1.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 160 MNHR | $120 | $100 | $161 | $23.20 | $100 |
| 514E10000 FINAL INSPECTION REPAIR | 91 EACH | $200 | $200 | $357 | $170 | $200 |
| 516E11210 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S | 227 FT | $400 | $700 | $567 | $650 | $500 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 20 SF | $8.00 | $8.00 | $8.56 | $20.00 | $7.00 |
| 516E45305 REFURBISH BEARING DEVICE, AS PER PLAN | 28 EACH | $2,000 | $1,500 | $428 | $2,150 | $500 |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $18,000 | $20,000 | $5,350 | $35,000 | $25,000 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 385 SF | $85.00 | $88.00 | $80.25 | $90.00 | $85.00 |
| 526E25011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 606 SY | $270 | $340 | $278 | $325 | $300 |
| 526E90010 TYPE A INSTALLATION | 224 FT | $120 | $200 | $139 | $190 | $125 |
| 530E00600 SPECIAL - STRUCTURE, MISC.:CONCRETE SPALL REMOVAL | 3,054 SF | $3.00 | $21.00 | $16.05 | $8.55 | $5.00 |
| 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA | 264 SF | $65.00 | $150 | $88.38 | $86.00 | $65.00 |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 93 CF | $300 | $316 | $364 | $435 | $300 |
| 202E22901 APPROACH SLAB REMOVED, AS PER PLAN | 604 SY | $25.00 | $23.00 | $32.10 | $35.00 | $80.00 |
| 202E98100 REMOVAL MISC.:PLUG EXISTING SCUPPER | 56 EACH | $60.00 | $132 | $107 | $125 | $150 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 461 LB | $3.00 | $3.00 | $1.18 | $3.00 | $2.25 |
| 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS | 1,392 SY | $7.50 | $7.00 | $7.13 | $7.00 | $7.50 |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 15,300 SF | $8.00 | $8.50 | $11.77 | $7.50 | $7.50 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIM | 15,300 SF | $2.00 | $2.00 | $0.54 | $1.20 | $1.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 15,300 SF | $2.00 | $2.00 | $1.07 | $1.25 | $1.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 15,300 SF | $1.00 | $1.00 | $1.07 | $1.45 | $1.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 27 MNHR | $120 | $100 | $161 | $23.20 | $105 |
| 514E10000 FINAL INSPECTION REPAIR | 16 EACH | $275 | $300 | $482 | $170 | $200 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 3 SF | $150 | $88.00 | $1,552 | $380 | $150 |
| 526E25011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 604 SY | $270 | $340 | $284 | $325 | $300 |
| 526E90010 TYPE A INSTALLATION | 218 FT | $120 | $200 | $139 | $190 | $125 |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 91 CF | $300 | $315 | $364 | $435 | $300 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 1,000 SY | $25.00 | $22.00 | $23.78 | $15.75 | $16.50 |
| 513E90000 STRUCTURAL STEEL, MISC.:STEEL BEAM REPAIRS | 1,100 LB | $4.50 | $7.00 | $1.07 | $9.90 | $10.00 |
| 202E75260 VANDAL PROTECTION FENCE REMOVED | 502 FT | $10.00 | $6.00 | $6.24 | $5.50 | $5.50 |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 5,500 SF | $11.00 | $12.00 | $30.50 | $12.60 | $7.00 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIM | 5,500 SF | $3.00 | $3.00 | $2.38 | $1.50 | $1.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 5,500 SF | $2.00 | $2.00 | $2.38 | $5.30 | $2.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 5,500 SF | $2.00 | $2.00 | $2.38 | $5.30 | $1.00 |
| 514E00505 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 8 MNHR | $120 | $100 | $357 | $23.20 | $100 |
| 514E10000 FINAL INSPECTION REPAIR | 4 EACH | $300 | $300 | $535 | $170 | $250 |
| 607E40000 SPECIAL - VANDAL PROTECTION FENCE | 502 FT | $140 | $80.00 | $89.01 | $78.50 | $75.50 |
| 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA | 96 SF | $65.00 | $100 | $96.30 | $196 | $65.00 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 530 SY | $25.00 | $23.00 | $23.78 | $15.75 | $16.50 |
| 513E90000 STRUCTURAL STEEL, MISC.:STEEL BEAM REPAIRS | 500 LB | $4.50 | $7.00 | $1.07 | $10.00 | $11.00 |
| 202E22901 APPROACH SLAB REMOVED, AS PER PLAN | 604 SY | $25.00 | $23.00 | $32.10 | $35.00 | $80.00 |
| 202E98100 REMOVAL MISC.:PLUG EXISTING SCUPPER | 81 EACH | $84.00 | $132 | $107 | $125 | $150 |
| 204E50000 GEOTEXTILE FABRIC | 30 SY | $10.00 | $31.00 | $2.41 | $30.00 | $3.00 |
| 503E21100 UNCLASSIFIED EXCAVATION | 20 CY | $34.00 | $100 | $58.85 | $100 | $35.00 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 474 LB | $3.00 | $3.00 | $1.18 | $3.00 | $2.19 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 1,475 SY | $21.50 | $22.00 | $23.78 | $15.75 | $16.50 |
| 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS | 2,464 SY | $7.50 | $7.00 | $7.13 | $7.00 | $7.50 |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 36,200 SF | $7.00 | $7.50 | $9.84 | $6.85 | $7.00 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIM | 36,200 SF | $1.50 | $1.50 | $0.80 | $1.56 | $1.50 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 36,200 SF | $1.00 | $1.00 | $1.61 | $1.80 | $1.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 36,200 SF | $1.00 | $1.00 | $1.61 | $1.80 | $1.00 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 49 MNHR | $120 | $100 | $161 | $23.20 | $105 |
| 514E10000 FINAL INSPECTION REPAIR | 28 EACH | $275 | $300 | $482 | $170 | $200 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 18 SF | $150 | $88.00 | $357 | $102 | $150 |
| 526E25011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 604 SY | $270 | $340 | $278 | $325 | $300 |
| 526E90010 TYPE A INSTALLATION | 230 FT | $120 | $200 | $139 | $190 | $125 |
| 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA | 324 SF | $65.00 | $100 | $88.28 | $94.40 | $65.00 |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 96 CF | $300 | $316 | $364 | $435 | $300 |
| 513E90000 STRUCTURAL STEEL, MISC.:STEEL BEAM REPAIRS | 2,000 LB | $6.00 | $7.00 | $1.07 | $9.50 | $12.00 |
| 202E22901 APPROACH SLAB REMOVED, AS PER PLAN | 604 SY | $25.00 | $22.00 | $32.10 | $35.00 | $80.00 |
| 202E98100 REMOVAL MISC.:PLUG EXISTING SCUPPER | 49 EACH | $87.00 | $132 | $107 | $125 | $125 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 470 LB | $3.00 | $3.00 | $1.23 | $3.00 | $2.50 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 1,225 SY | $21.50 | $23.00 | $23.78 | $15.75 | $16.50 |
| 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS | 1,399 SY | $7.50 | $7.00 | $7.13 | $7.00 | $7.50 |
| 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL | 15,200 SF | $7.00 | $7.50 | $11.77 | $8.05 | $7.00 |
| 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIM | 15,200 SF | $2.00 | $2.00 | $0.54 | $1.00 | $1.00 |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 15,200 SF | $2.00 | $2.00 | $1.07 | $1.50 | $1.00 |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 15,200 SF | $1.00 | $1.00 | $1.07 | $1.50 | $2.25 |
| 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR | 29 MNHR | $120 | $100 | $161 | $23.20 | $105 |
| 514E10000 FINAL INSPECTION REPAIR | 17 EACH | $275 | $300 | $482 | $170 | $200 |
| 516E45305 REFURBISH BEARING DEVICE, AS PER PLAN | 28 EACH | $250 | $800 | $428 | $500 | $500 |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $7,500 | $8,000 | $5,350 | $15,000 | $25,000 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 24 SF | $150 | $88.00 | $238 | $95.00 | $150 |
| 526E25011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 604 SY | $270 | $340 | $278 | $325 | $300 |
| 526E90010 TYPE A INSTALLATION | 270 FT | $120 | $200 | $139 | $190 | $125 |
| 530E00600 SPECIAL - STRUCTURE, MISC.:CONCRETE SPALL REMOVAL | 39 SF | $15.00 | $21.00 | $53.50 | $57.50 | $15.00 |
| 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA | 297 SF | $65.00 | $100 | $88.28 | $98.00 | $65.00 |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 113 CF | $300 | $300 | $364 | $435 | $300 |
| 513E90000 STRUCTURAL STEEL, MISC.:STEEL BEAM REPAIRS | 1,300 LB | $4.50 | $7.00 | $9.63 | $10.00 | $11.00 |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $15,000 | $8,000 | $9,095 | $22,700 | $10,000 |
| 202E75000 FENCE REMOVED | 2,321 FT | $1.00 | $3.00 | $2.83 | $2.50 | $2.50 |
| 203E10000 EXCAVATION | 40 CY | $16.00 | $25.00 | $49.14 | $50.00 | $40.00 |
| 203E20000 EMBANKMENT | 89 CY | $10.00 | $20.00 | $22.09 | $40.00 | $16.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 137.5 FT | $21.00 | $19.00 | $19.91 | $18.40 | $21.00 |
| 606E26000 ANCHOR ASSEMBLY, TYPE B | 1 EACH | $1,700 | $2,000 | $2,088 | $1,930 | $2,500 |
| 607E15000 FENCE, TYPE 47 | 20 FT | $1.00 | $30.00 | $32.31 | $28.50 | $28.50 |
| 601E37500 PAVED GUTTER, TYPE 1-2 | 265 FT | $30.00 | $75.00 | $43.87 | $55.00 | $55.00 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $300 | $300 | $321 | $5.00 | $300 |
| 659E00300 TOPSOIL | 26 CY | $20.00 | $50.00 | $53.50 | $50.00 | $126 |
| 659E10000 SEEDING AND MULCHING | 232 SY | $0.56 | $0.60 | $0.60 | $2.50 | $0.56 |
| 659E14000 REPAIR SEEDING AND MULCHING | 12 SY | $1.00 | $0.50 | $0.54 | $4.00 | $0.50 |
| 659E15000 INTER-SEEDING | 12 SY | $0.01 | $0.50 | $0.01 | $0.01 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.06 TON | $750 | $800 | $803 | $800 | $750 |
| 659E31000 LIME | 0.05 ACRE | $200 | $200 | $214 | $5.00 | $200 |
| 659E35000 WATER | 2 MGAL | $1.00 | $1.00 | $0.01 | $0.01 | $1.00 |
| 659E40000 MOWING | 1 MSF | $1.00 | $1.00 | $1.07 | $0.01 | $1.00 |
| 602E20000 CONCRETE MASONRY | 0.6 CY | $2,000 | $3,000 | $3,822 | $2,475 | $3,500 |
| 611E05200 12" CONDUIT, TYPE F | 34 FT | $72.00 | $70.00 | $74.43 | $100 | $70.00 |
| 611E06400 15" CONDUIT, TYPE D | 23 FT | $75.00 | $45.00 | $64.76 | $61.00 | $60.00 |
| 611E98450 CATCH BASIN, NO. 2-2A | 1 EACH | $1,900 | $1,500 | $1,802 | $1,500 | $2,000 |
| 625E32000 GROUND ROD | 1 EACH | $200 | $260 | $273 | $250 | $250 |
| 626E00100 BARRIER REFLECTOR | 3 EACH | $8.00 | $7.00 | $7.87 | $7.20 | $7.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 7 FT | $12.50 | $15.00 | $16.39 | $15.00 | $15.00 |
| 630E20800 OVERHEAD SIGN SUPPORT, TYPE TC-12.30, DESIGN 8 | 1 EACH | $14,750 | $19,000 | $20,164 | $18,450 | $18,450 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 2 EACH | $100 | $200 | $213 | $195 | $195 |
| 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION | 1 EACH | $4,500 | $4,800 | $5,027 | $4,600 | $4,600 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $50.00 | $47.00 | $49.18 | $45.00 | $45.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 1 EACH | $18.00 | $10.00 | $10.92 | $10.00 | $10.00 |
| 630E87100 REMOVAL OF OVERHEAD MOUNTED SIGN AND REERECTION | 2 EACH | $410 | $132 | $137 | $125 | $125 |
| 630E87520 REMOVAL OF POLE MOUNTED SIGN AND REERECTION | 2 EACH | $100 | $105 | $109 | $100 | $100 |
| 630E89706 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL, TYP | 1 EACH | $1,200 | $2,000 | $2,142 | $1,960 | $1,960 |
| 606E10200 SPECIAL - NOISE BARRIER (REFLECTIVE), 10' HEIGHT A | 56 SF | $40.00 | $30.00 | $32.72 | $22.00 | $72.25 |
| 606E10210 SPECIAL - NOISE BARRIER (REFLECTIVE), OVER 10' TO | 304 SF | $30.00 | $13.00 | $26.63 | $22.00 | $34.00 |
| 606E10810 SPECIAL - NOISE BARRIER, MISC.:NOISE WALL POST AND | 6 EACH | $6,800 | $3,600 | $5,350 | $4,500 | $4,600 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $14,000 | $65,000 | $33,170 | $46,000 | $25,000 |
| 511E34011 CLASS QC2 CONCRETE, SUPERSTRUCTURE, AS PER PLAN | 21 CY | $800 | $4,500 | $1,819 | $2,450 | $1,050 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 132 SY | $21.50 | $22.00 | $23.78 | $15.75 | $16.50 |
| 606E10211 SPECIAL - NOISE BARRIER (REFLECTIVE), OVER 10' TO | 1,247 SF | $49.00 | $20.00 | $46.55 | $42.00 | $45.00 |
| 606E10920 SPECIAL - NOISE BARRIER, MISC.:NOISE BARRIER (REFL | 322 SF | $25.00 | $17.00 | $24.50 | $23.00 | $24.00 |
| 659E00300 TOPSOIL | 203 CY | $20.00 | $40.00 | $46.01 | $43.00 | $34.00 |
| 659E10000 SEEDING AND MULCHING | 1,833 SY | $0.56 | $0.60 | $0.60 | $1.00 | $0.56 |
| 659E20000 COMMERCIAL FERTILIZER | 0.41 TON | $750 | $800 | $803 | $800 | $750 |
| 659E35000 WATER | 10 MGAL | $1.00 | $0.10 | $0.01 | $0.01 | $1.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $5,000 | $3,100 | $1,172 | $7,500 | $7,000 |
| 832E30000 EROSION CONTROL | 2,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 50 FT | $20.00 | $36.00 | $48.69 | $70.00 | $35.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 10 FT | $19.00 | $30.00 | $41.09 | $35.00 | $30.00 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 2 EACH | $200 | $440 | $375 | $350 | $400 |
| 202E98400 REMOVAL MISC.: NOISE BARRIER PANEL | 2,667 SF | $5.00 | $5.00 | $17.54 | $18.40 | $6.00 |
| 512E10001 SEALING OF CONCRETE SURFACES, AS PER PLAN | 242 SY | $21.50 | $22.00 | $23.78 | $15.85 | $16.50 |
| 606E10220 SPECIAL - NOISE BARRIER (REFLECTIVE), OVER 14' TO | 203 SF | $67.00 | $60.00 | $76.51 | $80.00 | $50.00 |
| 606E10310 SPECIAL - NOISE BARRIER (ABSORPTIVE), OVER 10' TO | 506 SF | $135 | $62.00 | $76.51 | $80.00 | $60.00 |
| 606E10320 SPECIAL - NOISE BARRIER (ABSORPTIVE), OVER 14' TO | 1,958 SF | $130 | $60.00 | $71.69 | $66.00 | $52.00 |
| 607E98000 FENCE, MISC.: TEMPORARY FENCE | 174 FT | $12.00 | $4.00 | $9.64 | $25.00 | $1.25 |
| 608E10000 4" CONCRETE WALK | 132 SF | $15.00 | $29.00 | $24.08 | $50.00 | $18.00 |
| 608E41000 CONCRETE STEPS, TYPE B | 20 FT | $175 | $500 | $294 | $500 | $150 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 50 HOUR | $70.00 | $50.00 | $65.27 | $65.00 | $75.00 |
| 614E11630 INCREASED BARRIER DELINEATION | 80 FT | $0.75 | $2.00 | $0.26 | $2.50 | $2.50 |
| 614E12336 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL) | 1 EACH | $2,200 | $1,800 | $2,537 | $1,895 | $1,929 |
| 614E13300 BARRIER REFLECTOR, TYPE B | 4 EACH | $7.50 | $8.00 | $3.25 | $1,895 | $8.50 |
| 614E13350 OBJECT MARKER, ONE WAY | 5 EACH | $13.00 | $14.00 | $10.98 | $13.50 | $13.50 |
| 622E41000 PORTABLE BARRIER, 32" | 240 FT | $60.00 | $25.00 | $8.41 | $43.50 | $8.95 |
| 202E23000 PAVEMENT REMOVED | 13 SY | $20.00 | $30.00 | $311 | $38.50 | $30.00 |
| 203E10000 EXCAVATION | 59 CY | $20.00 | $25.00 | $68.50 | $38.00 | $19.00 |
| 202E75000 FENCE REMOVED | 130 FT | $4.00 | $12.00 | $2.83 | $2.50 | $1.00 |
| 607E98000 FENCE, MISC.:WOOD FENCE | 130 FT | $30.00 | $35.00 | $39.12 | $34.50 | $34.50 |
| 659E10000 SEEDING AND MULCHING | 484 SY | $0.56 | $0.60 | $0.60 | $2.00 | $0.56 |
| 659E20000 COMMERCIAL FERTILIZER | 0.06 TON | $750 | $790 | $803 | $800 | $750 |
| 659E31000 LIME | 0.1 ACRE | $200 | $200 | $214 | $5.00 | $200 |
| 659E35000 WATER | 1 MGAL | $1.00 | $0.50 | $0.01 | $0.01 | $1.00 |
| 605E12211 6" DEEP PIPE UNDERDRAINS WITH FABRIC WRAP, AS PER | 229 FT | $10.00 | $17.00 | $70.46 | $34.50 | $19.00 |
| 441E10000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG | 2 CY | $1,000 | $1,000 | $2,529 | $800 | $200 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 235 LB | $3.00 | $0.90 | $1.34 | $1.50 | $1.13 |
| 511E46210 CLASS QC1 CONCRETE | 8 CY | $450 | $643 | $1,017 | $635 | $450 |
| 524E94401 DRILLED SHAFTS, 18" DIAMETER, AS PER PLAN | 580 FT | $75.00 | $90.00 | $63.13 | $74.00 | $60.00 |
| 524E95100 DRILLED SHAFTS, MISC.:70 MM INCLINOMETER CASING | 1 EACH | $1,000 | $840 | $642 | $880 | $2,200 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $300,000 | $300,000 | $254,904 | $375,000 | $315,000 |
| 108E10000 SPECIAL - CPM PROGRESS SCHEDULE(PART ONE AND PART | 1 LS | $15,000 | $36,000 | $9,204 | $29,600 | $265,000 |
| 619E16021 FIELD OFFICE, TYPE C, AS PER PLAN(PART ONE AND PAR | 46 MNTH | $2,500 | $5,800 | $4,645 | $4,500 | $4,700 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING(PART ONE | 1 LS | $220,000 | $472,000 | $229,461 | $345,000 | $460,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 90,472 CY | $100 | $9.05M | 15% |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 50,927 CY | $48 | $2.44M | 4% |
| 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19MM, TYPE A | 15,628 CY | $138 | $2.16M | 4% |
| 806E00101 ASPHALT CONCRETE SURFACE COURSE, 12.5MM, TYPE A, A | 12,992 CY | $165 | $2.14M | 4% |
| 622E10140 CONCRETE BARRIER, SINGLE SLOPE, TYPE C1 | 21,690 FT | $95 | $2.06M | 4% |
| 202E23000 PAVEMENT REMOVED | 291,552 SY | $7 | $2.04M | 3% |
| 452E15060 12.5" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1 | 23,038 SY | $75 | $1.73M | 3% |
| 624E10000 MOBILIZATION(PART ONE AND PART TWO AND PART THREE) | 1 LS | $1,600,000 | $1.60M | 3% |
| 203E10000 EXCAVATION | 158,861 CY | $9.5 | $1.51M | 3% |
| 622E41011 PORTABLE BARRIER, 50", AS PER PLAN | 117,388 FT | $12 | $1.41M | 2% |