CUY-East 49th Street/Harvard Ave
CUY County · est $1.5M
Bid dateThursday, July 26—
CUY County · est $1.5M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 40 more items below.
| Item | Quantity | R1Anthony Allega Cement Contractor | R2INC Perk Company INC | R3Shelly Company | R4Karvo Companies INC | % of bid |
|---|---|---|---|---|---|---|
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 1,135 CY | $197 | $173 | $173 | $175 | 17% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (1583 CY | $137 | $125 | $125 | $131 | 17% |
| 255E10161 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 3,500 SY | $50.96 | $45.00 | $45.00 | $114 | 14% |
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN | 3,000 SY | $28.28 | $22.00 |
| Item | Quantity | R1Anthony Allega Cement Contractor | R2INC Perk Company INC | R3Shelly Company | R4Karvo Companies INC |
|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $9,240 | $11,800 | $9,900 | $9,900 |
| 202E23000 PAVEMENT REMOVED | 11 SY | $39.22 | $100 | $100 | $6.70 |
| 202E30000 WALK REMOVED | 258 SF | $9.23 | $5.00 | $5.00 | $5.85 |
| 202E32000 CURB REMOVED | 1,305 FT | $2.40 | $8.50 | $8.50 | $6.40 |
| 608E52000 CURB RAMP |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $33.50 |
| $28.00 |
| 7% |
| 255E10161 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 549 SY | $131 | $136 | $136 | $123 | 6% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T=3") | 32,452 SY | $1.78 | $2.05 | $2.05 | $2.29 | 5% |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 36 EACH | $1,350 | $950 | $975 | $875 | 4% |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 28,200 LB | $1.72 | $1.25 | $1.50 | $1.25 | 4% |
| 608E10001 4" CONCRETE WALK, AS PER PLAN | 3,028 SF | $15.95 | $9.00 | $9.00 | $8.20 | 4% |
| 255E10161 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 276 SY | $158 | $165 | $165 | $163 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $41,450 | $168,500 | $220,500 | $131,000 | 3% |
| 452E19200 NON-REINFORCED CONCRETE PAVEMENT, MISC.: CONCRETE | 351 SY | $116 | $85.00 | $85.00 | $98.00 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $87,500 | $40,000 | $30,000 | 3% |
| 609E26001 CURB, TYPE 6, AS PER PLAN, CLASS QC MS | 617 FT | $47.88 | $37.00 | $37.00 | $12.75 | 2% |
| 611E99154 INLET RECONSTRUCTED TO GRADE | 10 EACH | $2,853 | $1,100 | $1,500 | $1,200 | 2% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 100 CY | $224 | $300 | $155 | $150 | 2% |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 15 EACH | $1,019 | $1,400 | $1,200 | $1,200 | 1% |
| 407E20000 NON-TRACKING TACK COAT | 4,225 GAL | $3.53 | $2.85 | $2.85 | $2.25 | 1% |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 30 EACH | $456 | $750 | $675 | $675 | 1% |
| 646E10500 CROSSWALK LINE | 3,000 FT | $4.20 | $3.75 | $3.75 | $3.75 | 1% |
| 250 SF |
| $25.20 |
| $32.50 |
| $32.50 |
| $15.80 |
| 608E53020 DETECTABLE WARNING | 8 SF | $47.73 | $200 | $200 | $32.50 |
| 623E39500 MONUMENT BOX ADJUSTED TO GRADE | 10 EACH | $392 | $750 | $700 | $700 |
| 653E10001 TOPSOIL FURNISHED AND PLACED, AS PER PLAN | 42 CY | $90.40 | $72.00 | $200 | $95.00 |
| 832E30000 EROSION CONTROL | 7,500 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 609E14001 CURB, TYPE 2-A, AS PER PLAN, CLASS QC MS | 300 FT | $9.14 | $15.00 | $15.00 | $23.00 |
| 609E24501 CURB, TYPE 4-B, AS PER PLAN, CLASS QC MS | 516 FT | $4.88 | $30.00 | $30.00 | $13.70 |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 2 EACH | $1,232 | $1,100 | $1,100 | $1,100 |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 2,200 LB | $0.67 | $3.00 | $3.00 | $2.65 |
| 646E10100 LANE LINE, 4" | 1.25 MILE | $1,344 | $1,200 | $1,200 | $1,200 |
| 646E10200 CENTER LINE, DOUBLE SOLID | 0.13 MILE | $6,160 | $5,500 | $5,500 | $5,500 |
| 646E10200 CENTER LINE, PASS PROHIBITED | 0.42 MILE | $6,160 | $5,500 | $5,500 | $5,500 |
| 646E10300 CHANNELIZING LINE, 8" | 980 FT | $2.02 | $1.80 | $1.80 | $1.80 |
| 646E10400 STOP LINE | 420 FT | $12.32 | $11.00 | $11.00 | $11.00 |
| 646E20300 LANE ARROW | 50 EACH | $162 | $145 | $145 | $145 |
| 646E20350 LANE REDUCTION ARROW | 1 EACH | $308 | $275 | $275 | $275 |
| 646E20400 WORD ON PAVEMENT, 72" | 4 EACH | $196 | $175 | $175 | $175 |
| 646E20502 DOTTED LINE, 4" | 250 FT | $3.36 | $3.00 | $3.00 | $3.00 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 10 CY | $47.38 | $125 | $100 | $8.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 100 HOUR | $44.80 | $75.00 | $65.00 | $37.50 |
| 614E20000 WORK ZONE LANE LINE, CLASS I, 4" | 2.5 MILE | $560 | $500 | $500 | $500 |
| 614E20550 WORK ZONE LANE LINE, CLASS III, 4", 642 PAINT | 1.25 MILE | $560 | $500 | $500 | $500 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 1.1 MILE | $2,016 | $1,800 | $1,800 | $1,800 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.55 MILE | $1,008 | $900 | $900 | $900 |
| 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, 8" | 1,960 FT | $0.84 | $0.75 | $0.75 | $0.75 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 980 FT | $0.84 | $0.75 | $0.75 | $0.75 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 840 FT | $2.80 | $2.50 | $2.50 | $2.50 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 240 FT | $2.80 | $2.50 | $2.50 | $2.50 |
| 614E27000 WORK ZONE CROSSWALK LINE, CLASS I | 6,000 FT | $1.40 | $1.25 | $1.25 | $1.25 |
| 614E27620 WORK ZONE CROSSWALK LINE, CLASS III, 642 PAINT | 3,000 FT | $1.40 | $1.25 | $1.25 | $1.25 |
| 614E30000 WORK ZONE ARROW, CLASS I | 100 EACH | $39.20 | $35.00 | $35.00 | $35.00 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 50 EACH | $39.20 | $35.00 | $35.00 | $35.00 |
| 616E10000 WATER | 5 MGAL | $386 | $1.00 | $1.00 | $2.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,868 | $22,340 | $6,000 | $20,000 |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $1,120 | $2,200 | $1,800 | $2,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $11,225 | $5,500 | $2,500 | $3,900 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 1,135 CY | $197.04 | $224k | 16% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (1583 CY | $136.72 | $216k | 15% |
| 255E10161 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 3,500 SY | $50.96 | $178k | 13% |
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN | 3,000 SY | $28.28 | $85k | 6% |
| 255E10161 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 549 SY | $131.19 | $72k | 5% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T=3") | 32,452 SY | $1.78 | $58k | 4% |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 36 EACH | $1,350 | $49k | 3% |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 28,200 LB | $1.72 | $49k | 3% |
| 608E10001 4" CONCRETE WALK, AS PER PLAN | 3,028 SF | $15.95 | $48k | 3% |
| 255E10161 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 276 SY | $158.07 | $44k | 3% |