LOR-IR 90-11.78
LOR County · est $2.3M
Bid dateThursday, August 23—
LOR County · est $2.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 10%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 82 more items below.
| Item | Quantity | R1J D Williamson Construction CO INC | R2Kokosing Construction Company INC | R3Great Lakes Construction CO | R4Beaver Excavating Company | R5Mosser Construction INC | % of bid |
|---|---|---|---|---|---|---|---|
| 513E10261 STRUCTURAL STEEL MEMBERS, LEVEL 3, AS PER PLAN | 345,720 LB | $1.50 | $1.85 | $1.42 | $1.46 | $1.90 | 28% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $175,000 | $115,000 | $310,000 | $270,000 | $325,000 | 9% |
| 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN | 119,339 LB | $1.35 | $1.40 | $1.40 | $1.30 | $1.55 | 9% |
| Item | Quantity | R1J D Williamson Construction CO INC | R2Kokosing Construction Company INC | R3Great Lakes Construction CO | R4Beaver Excavating Company | R5Mosser Construction INC |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $6,500 | $10,000 | $2,900 | $10,000 | $15,000 |
| 202E23000 PAVEMENT REMOVED | 589 SY | $15.00 | $21.00 | $28.00 | $22.00 | $42.00 |
| 202E30700 CONCRETE BARRIER REMOVED | 99 FT | $19.00 | $28.00 | $21.00 | $35.00 | $44.00 |
| 202E38000 GUARDRAIL REMOVED |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 273 CY | $550 | $1,000 | $1,000 | $835 | $1,025 | 8% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100,000 | $100,000 | $100,000 | $100,000 | 5% |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 16,970 SF | $5.25 | $5.00 | $3.98 | $5.00 | $3.98 | 5% |
| 526E30010 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 289 SY | $275 | $250 | $330 | $230 | $350 | 4% |
| 511E42512 CLASS QC1 CONCRETE WITH QC/QA, PIER CAP | 108 CY | $700 | $700 | $730 | $695 | $995 | 4% |
| 516E11211 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S | 157 FT | $470 | $540 | $600 | $500 | $575 | 4% |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 16,970 SF | $3.60 | $3.50 | $3.98 | $3.50 | $3.98 | 3% |
| 519E00100 SPECIAL - COMPOSITE FIBER WRAP SYSTEM | 1,457 SF | $35.00 | $64.00 | $19.50 | $48.00 | $60.00 | 3% |
| 511E34451 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE | 84 CY | $600 | $540 | $780 | $580 | $505 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $50,000 | $64,000 | $30,000 | $100,000 | $56,000 | 3% |
| 511E45712 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT | 95 CY | $525 | $600 | $960 | $530 | $825 | 3% |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $45,000 | $73,000 | $84,000 | $40,000 | $34,000 | 2% |
| 607E39900 VANDAL PROTECTION FENCE, 6' STRAIGHT, COATED FABRI | 436 FT | $77.00 | $75.00 | $74.75 | $75.00 | $75.50 | 2% |
| 618E40101 RUMBLE STRIPS, (ASPHALT CONCRETE), AS PER PLAN | 2,290 FT | $12.50 | $13.75 | $12.00 | $15.00 | $17.00 | 2% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 123 CY | $230 | $225 | $225 | $225 | $225 | 2% |
| 622E41000 PORTABLE BARRIER, 32" | 3,140 FT | $8.50 | $9.00 | $13.00 | $40.00 | $20.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $24,000 | $10,000 | $43,000 | $20,000 | $20,000 | 1% |
| 669 FT |
| $1.00 |
| $3.00 |
| $1.50 |
| $2.00 |
| $1.50 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 1 EACH | $61.00 | $250 | $100 | $100 | $100 |
| 203E10000 EXCAVATION | 347 CY | $19.00 | $55.00 | $22.00 | $25.00 | $45.00 |
| 203E20000 EMBANKMENT | 8 CY | $40.00 | $15.00 | $40.00 | $84.00 | $50.00 |
| 204E10000 SUBGRADE COMPACTION | 828 SY | $5.25 | $2.50 | $3.00 | $4.00 | $4.50 |
| 204E45000 PROOF ROLLING | 2 HOUR | $250 | $135 | $300 | $375 | $100 |
| 606E15050 GUARDRAIL, TYPE MGS | 462.5 FT | $18.50 | $18.00 | $18.60 | $18.60 | $18.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 2 EACH | $2,100 | $2,000 | $2,175 | $2,175 | $2,000 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 3 EACH | $2,100 | $2,000 | $2,115 | $2,115 | $2,000 |
| 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 2 EACH | $305 | $300 | $550 | $550 | $300 |
| 622E10160 CONCRETE BARRIER, SINGLE SLOPE, TYPE D | 69 FT | $65.00 | $160 | $110 | $110 | $185 |
| 622E25000 CONCRETE BARRIER END SECTION, TYPE D | 1 EACH | $4,000 | $2,700 | $4,400 | $2,700 | $3,300 |
| 622E25050 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 1 EACH | $4,000 | $3,000 | $4,400 | $3,000 | $3,500 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (1-WAY) | 77 EACH | $3.05 | $10.00 | $7.00 | $5.00 | $7.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (1-WAY) | 17 EACH | $7.50 | $10.00 | $7.00 | $7.00 | $7.00 |
| 601E21060 TIED CONCRETE BLOCK MAT, TYPE 2 | 83 SY | $60.00 | $65.00 | $75.00 | $50.00 | $55.00 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 6 CY | $155 | $320 | $130 | $300 | $175 |
| 659E00100 SOIL ANALYSIS TEST | 1 EACH | $50.00 | $150 | $50.00 | $200 | $50.00 |
| 659E00300 TOPSOIL | 95 CY | $53.00 | $43.00 | $30.05 | $40.00 | $20.00 |
| 659E10000 SEEDING AND MULCHING | 850 SY | $1.50 | $3.40 | $3.40 | $3.40 | $3.40 |
| 659E14000 REPAIR SEEDING AND MULCHING | 43 SY | $3.05 | $0.40 | $0.40 | $0.40 | $0.40 |
| 659E20000 COMMERCIAL FERTILIZER | 0.12 TON | $815 | $515 | $515 | $515 | $515 |
| 659E31000 LIME | 0.18 ACRE | $10.00 | $100 | $100 | $100 | $100 |
| 659E35000 WATER | 3 MGAL | $10.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 2,900 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 0.2 CY | $2,300 | $6,500 | $7,000 | $2,900 | $3,200 |
| 611E05200 12" CONDUIT, TYPE F707.05 TYPE C OR 707.21 | 34 FT | $68.00 | $100 | $75.00 | $125 | $70.00 |
| 611E98180 CATCH BASIN, NO. 3A | 1 EACH | $2,100 | $3,500 | $3,000 | $2,400 | $2,500 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE1 1/2" | 574 SY | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 304E20000 AGGREGATE BASE | 136 CY | $51.50 | $95.00 | $75.00 | $70.00 | $105 |
| 407E10000 TACK COAT | 43 GAL | $3.05 | $3.00 | $3.00 | $3.00 | $3.00 |
| 441E50701 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (18 CY | $375 | $365 | $365 | $365 | $365 |
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 45 CY | $320 | $310 | $310 | $310 | $310 |
| 442E20200 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 24 CY | $310 | $300 | $300 | $300 | $300 |
| 609E24510 CURB, TYPE 4-C | 63 FT | $31.00 | $40.00 | $42.00 | $45.00 | $32.00 |
| 618E40100 RUMBLE STRIPS, (ASPHALT CONCRETE) | 1,094 FT | $2.75 | $2.34 | $2.40 | $1.75 | $5.15 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 24 FT | $13.00 | $10.00 | $17.50 | $17.50 | $17.50 |
| 630E80100 SIGN, FLAT SHEET | 6 SF | $26.00 | $25.00 | $30.00 | $30.00 | $30.00 |
| 630E80101 SIGN, FLAT SHEET, AS PER PLAN | 0.8 SF | $26.00 | $75.00 | $43.75 | $43.75 | $43.75 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 3 EACH | $15.00 | $50.00 | $10.00 | $10.00 | $100 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $15.00 | $50.00 | $10.00 | $10.00 | $100 |
| 646E10000 EDGE LINE, 4" | 1.26 MILE | $4,250 | $4,200 | $4,200 | $4,200 | $7,755 |
| 646E10100 LANE LINE, 4" | 0.63 MILE | $2,850 | $2,800 | $2,800 | $2,800 | $7,075 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $62.00 | $75.00 | $65.00 | $65.00 | $60.00 |
| 614E11630 INCREASED BARRIER DELINEATION | 3,830 FT | $2.35 | $0.30 | $1.45 | $1.45 | $2.45 |
| 614E12336 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL) | 6 EACH | $2,050 | $2,500 | $1,845 | $1,845 | $1,845 |
| 614E12800 WORK ZONE RAISED PAVEMENT MARKER | 585 EACH | $6.00 | $18.00 | $7.50 | $7.50 | $5.75 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (1-WAY) | 71 EACH | $16.50 | $5.00 | $8.00 | $8.00 | $16.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 77 EACH | $15.00 | $10.00 | $12.50 | $12.50 | $15.00 |
| 614E18600 PORTABLE CHANGEABLE MESSAGE SIGN | 18 SNMT | $1,000 | $500 | $750 | $750 | $950 |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 1.96 MILE | $2,200 | $2,150 | $7,500 | $7,500 | $2,150 |
| 614E22350 WORK ZONE EDGE LINE, CLASS III, 4", 642 PAINT | 1 MILE | $1,800 | $1,725 | $750 | $750 | $1,725 |
| 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, 8" | 1,365 FT | $1.05 | $1.00 | $2.20 | $2.20 | $1.00 |
| 616E10000 WATER | 1 MGAL | $5.50 | $110 | $60.00 | $300 | $10.00 |
| 622E41020 PORTABLE BARRIER, 32", BRIDGE MOUNTED | 690 FT | $12.00 | $18.00 | $13.00 | $25.00 | $24.00 |
| 202E22900 APPROACH SLAB REMOVED | 160 SY | $25.00 | $40.00 | $50.00 | $45.00 | $52.00 |
| 202E23501 WEARING COURSE REMOVED, AS PER PLAN | 1,065 SY | $12.50 | $10.00 | $10.00 | $7.00 | $17.00 |
| 502E11101 STRUCTURE FOR MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $12,000 | $25,000 | $15,000 | $40,000 | $15,000 |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $7,500 | $15,000 | $75,000 | $70,000 | $25,000 |
| 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN | 160 CY | $81.00 | $140 | $50.00 | $130 | $85.00 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 300 LB | $2.00 | $1.40 | $3.00 | $2.00 | $1.15 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 198 EACH | $18.00 | $20.00 | $20.00 | $25.00 | $32.00 |
| 512E10101 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), AS | 986 SY | $20.00 | $23.00 | $12.00 | $23.00 | $22.00 |
| 512E10601 CONCRETE REPAIR BY EPOXY INJECTION, AS PER PLAN | 50 FT | $105 | $80.00 | $40.00 | $90.00 | $41.00 |
| 512E33000 TYPE 2 WATERPROOFING | 79 SY | $19.00 | $60.00 | $25.00 | $30.00 | $15.00 |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 235 SY | $13.00 | $12.00 | $35.00 | $12.00 | $19.00 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 5,673 EACH | $3.20 | $4.50 | $3.00 | $3.05 | $2.95 |
| 514E10000 FINAL INSPECTION REPAIR | 20 EACH | $50.00 | $1.00 | $150 | $1.00 | $150 |
| 516E13001 1/4" PREFORMED EXPANSION JOINT FILLER, AS PER PLAN | 18 SF | $12.00 | $5.00 | $10.00 | $5.00 | $10.00 |
| 516E44001 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 6 EACH | $850 | $1,000 | $1,200 | $1,100 | $1,350 |
| 516E44101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 1 EACH | $1,300 | $2,000 | $1,300 | $1,600 | $1,475 |
| 516E44101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 5 EACH | $945 | $1,500 | $1,400 | $1,100 | $1,350 |
| 516E44201 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 6 EACH | $1,050 | $1,500 | $1,500 | $1,200 | $1,350 |
| 516E44201 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 1 EACH | $1,600 | $2,000 | $880 | $1,600 | $1,350 |
| 516E44201 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 5 EACH | $875 | $1,000 | $940 | $1,000 | $1,350 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 147 CY | $75.00 | $120 | $150 | $68.00 | $85.00 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 70 SF | $128 | $120 | $90.00 | $120 | $100 |
| 619E16010 FIELD OFFICE, TYPE B | 9 MNTH | $1,300 | $1,500 | $3,400 | $3,800 | $2,400 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $11,500 | $20,000 | $10,000 | $30,000 | $20,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 513E10261 STRUCTURAL STEEL MEMBERS, LEVEL 3, AS PER PLAN | 345,720 LB | $1.5 | $519k | 23% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $175,000 | $175k | 8% |
| 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN | 119,339 LB | $1.35 | $161k | 7% |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 273 CY | $550 | $150k | 7% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 4% |
| 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT | 16,970 SF | $5.25 | $89k | 4% |
| 526E30010 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 289 SY | $275 | $79k | 4% |
| 511E42512 CLASS QC1 CONCRETE WITH QC/QA, PIER CAP | 108 CY | $700 | $76k | 3% |
| 516E11211 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S | 157 FT | $470 | $74k | 3% |
| 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT | 16,970 SF | $3.6 | $61k | 3% |