MED-US 42-11.60/12.70
MED County · est $0.3M
Bid dateThursday, September 13—
MED County · est $0.3M
Published by ODOTon this contract’s Proposal PDF · EDGE Goal: 6.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 43 more items below.
| Item | Quantity | R1Stanley Miller Construction Company | R2Eclipse CO LLC | R3Lockhart Concrete CO | R4Shelly & Sands INC | R5S E T INC | R6Rudzik Excavating INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 611E94800 8' X 4' CONDUIT, TYPE A, 706.05 | 108 FT | $578 | $585 | $1,270 | $760 | $520 | $688 | 25% |
| 305E13010 9" CONCRETE BASE, CLASS QC1 | 344 SY | $62.00 | $79.50 | $60.00 | $55.00 | $92.00 | $115 | 8% |
| 624E10000 MOBILIZATION | 1 LS | $18,961 | $12,000 | $10,000 | $10,000 |
| Item | Quantity | R1Stanley Miller Construction Company | R2Eclipse CO LLC | R3Lockhart Concrete CO | R4Shelly & Sands INC | R5S E T INC | R6Rudzik Excavating INC |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $3,934 | $6,980 | $4,450 | $3,000 | $4,800 | $5,506 |
| 202E20010 HEADWALL REMOVED | 2 EACH | $150 | $390 | $100 | $450 | $850 | $1,000 |
| 202E38000 GUARDRAIL REMOVED | 291 FT | $2.00 | $2.00 | $3.00 | $2.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $38,900 |
| $13,020 |
| 7% |
| 614E12420 DETOUR SIGNING | 1 LS | $15,389 | $12,910 | $15,000 | $11,000 | $16,676 | $11,325 | 6% |
| 202E35200 PIPE REMOVED, OVER 24" | 141 FT | $100 | $57.00 | $25.00 | $140 | $70.00 | $135 | 6% |
| 203E10000 EXCAVATION | 575 CY | $23.60 | $21.75 | $15.00 | $20.00 | $35.00 | $46.98 | 5% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 30 CY | $445 | $310 | $290 | $500 | $615 | $330 | 5% |
| 511E46511 CLASS QC1 CONCRETE, FOOTING, AS PER PLAN | 25 CY | $496 | $696 | $375 | $1,100 | $775 | $449 | 5% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $10,902 | $7,220 | $9,500 | $4,700 | $6,500 | $5,000 | 4% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN | 534 SY | $20.00 | $14.75 | $6.00 | $20.00 | $16.00 | $28.50 | 4% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (16 CY | $506 | $310 | $270 | $700 | $615 | $330 | 3% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $7,667 | $4,900 | $5,000 | $9,000 | $15,500 | $6,000 | 3% |
| 304E20000 AGGREGATE BASE | 65 CY | $115 | $68.00 | $45.00 | $115 | $68.00 | $86.31 | 3% |
| 511E46011 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 9 CY | $778 | $2,043 | $600 | $2,000 | $2,250 | $2,020 | 3% |
| 203E20000 EMBANKMENT | 219 CY | $29.80 | $21.75 | $15.00 | $30.00 | $10.00 | $73.42 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $5,778 | $9,000 | $9,000 | $5,500 | $13,800 | $6,690 | 2% |
| 659E35000 WATER | 12 MGAL | $400 | $10.00 | $50.00 | $1.00 | $1.00 | $1.00 | 2% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E(NCHRP 350 OR MASH 2016 | 2 EACH | $2,389 | $2,350 | $2,000 | $2,300 | $3,500 | $2,404 | 2% |
| 659E10000 SEEDING AND MULCHING | 2,158 SY | $2.12 | $1.65 | $1.25 | $2.00 | $2.50 | $2.38 | 2% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 2,705 LB | $1.65 | $0.75 | $1.00 | $2.00 | $1.50 | $2.50 | 2% |
| $3.00 |
| $4.00 |
| 202E58101 CATCH BASIN REMOVED, AS PER PLAN | 1 EACH | $100 | $315 | $50.00 | $1,200 | $600 | $800 |
| 204E10000 SUBGRADE COMPACTION | 359 SY | $1.00 | $2.75 | $2.00 | $3.00 | $3.00 | $5.00 |
| 606E15051 GUARDRAIL, TYPE MGS, AS PER PLAN | 81.25 FT | $31.11 | $32.76 | $18.00 | $30.00 | $20.00 | $32.56 |
| 606E17360 GUARDRAIL, TYPE MGS, LONG-SPAN | 43.75 FT | $31.11 | $35.28 | $17.00 | $33.00 | $22.00 | $34.32 |
| 623E38500 MONUMENT ASSEMBLY | 3 EACH | $1,084 | $890 | $350 | $1,400 | $900 | $1,748 |
| 623E40520 RIGHT-OF-WAY MONUMENT | 5 EACH | $259 | $545 | $350 | $450 | $200 | $770 |
| 601E11001 RIPRAP, TYPE D, AS PER PLAN | 17 SY | $144 | $170 | $137 | $300 | $120 | $265 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 19 CY | $136 | $105 | $100 | $160 | $90.00 | $154 |
| 659E14000 REPAIR SEEDING AND MULCHING | 108 SY | $1.00 | $0.50 | $1.25 | $0.45 | $0.50 | $2.38 |
| 659E15000 INTER-SEEDING | 108 SY | $1.00 | $0.50 | $1.25 | $0.10 | $0.15 | $2.63 |
| 659E20000 COMMERCIAL FERTILIZER | 0.3 TON | $600 | $785 | $600 | $450 | $450 | $507 |
| 832E30000 EROSION CONTROL | 2,550 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 503E21100 UNCLASSIFIED EXCAVATION | 77 CY | $31.00 | $30.50 | $20.00 | $53.00 | $40.00 | $40.00 |
| 511E46611 CLASS QC1 CONCRETE, HEADWALL, AS PER PLAN | 1 CY | $861 | $2,436 | $1,000 | $1,500 | $2,500 | $402 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 35 SY | $54.00 | $29.75 | $15.00 | $36.00 | $28.00 | $30.00 |
| 512E33000 TYPE 2 WATERPROOFING | 144 SY | $16.50 | $18.00 | $15.00 | $24.00 | $26.00 | $51.22 |
| 512E33010 TYPE 3 WATERPROOFING | 133 SY | $31.00 | $36.00 | $25.00 | $38.00 | $35.00 | $81.70 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 25 SF | $2.30 | $8.00 | $2.00 | $4.00 | $10.00 | $15.00 |
| 518E21201 POROUS BACKFILL WITH GEOTEXTILE FABRIC, AS PER PLA | 10 CY | $357 | $102 | $60.00 | $240 | $160 | $204 |
| 611E04400 12" CONDUIT, TYPE B | 41 FT | $86.00 | $77.00 | $97.00 | $95.00 | $115 | $93.57 |
| 611E04600 12" CONDUIT, TYPE C | 10 FT | $86.00 | $64.25 | $97.00 | $90.00 | $80.00 | $123 |
| 611E10900 24" CONDUIT, TYPE D | 58 FT | $53.00 | $75.00 | $127 | $80.00 | $65.00 | $102 |
| 611E98470 CATCH BASIN, NO. 2-2B | 2 EACH | $450 | $1,755 | $1,250 | $1,800 | $1,800 | $1,611 |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 4 CY | $120 | $68.00 | $45.00 | $270 | $90.00 | $140 |
| 407E10000 TACK COAT | 88 GAL | $11.12 | $2.75 | $3.00 | $2.00 | $3.00 | $2.75 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 5 CY | $300 | $150 | $80.00 | $350 | $680 | $215 |
| 621E00100 RPM | 2 EACH | $255 | $900 | $65.00 | $900 | $800 | $990 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 2 EACH | $25.00 | $45.00 | $25.00 | $20.00 | $15.00 | $50.00 |
| 626E00102 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL) | 4 EACH | $8.34 | $7.25 | $10.00 | $7.00 | $25.00 | $22.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 12 FT | $13.34 | $21.00 | $10.00 | $20.00 | $9.00 | $7.70 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 14 FT | $13.89 | $26.25 | $12.00 | $25.00 | $10.00 | $27.50 |
| 630E08600 SIGN POST REFLECTOR | 1 EACH | $47.00 | $68.25 | $40.00 | $65.00 | $35.00 | $71.50 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 2 EACH | $73.00 | $78.75 | $85.00 | $75.00 | $20.00 | $82.50 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $23.00 | $10.50 | $35.00 | $10.00 | $20.00 | $11.00 |
| 642E00090 EDGE LINE, 4" | 0.06 MILE | $13,956 | $47,210 | $16,000 | $44,000 | $13,600 | $45,056 |
| 642E00290 CENTER LINE | 0.03 MILE | $27,912 | $43,160 | $27,000 | $44,000 | $27,500 | $20,000 |
| 642E00490 STOP LINE | 12 FT | $3.12 | $8.00 | $40.00 | $7.00 | $5.00 | $100 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 0.03 MILE | $18,167 | $44,330 | $21,000 | $1,300 | $34,000 | $45,216 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,267 | $13,859 | $5,700 | $3,000 | $5,500 | $3,630 |
| 619E16000 FIELD OFFICE, TYPE A | 1 MNTH | $833 | $525 | $750 | $4,000 | $1,800 | $3,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E94800 8' X 4' CONDUIT, TYPE A, 706.05 | 108 FT | $578.25 | $62k | 20% |
| 305E13010 9" CONCRETE BASE, CLASS QC1 | 344 SY | $62 | $21k | 7% |
| 624E10000 MOBILIZATION | 1 LS | $18,961 | $19k | 6% |
| 614E12420 DETOUR SIGNING | 1 LS | $15,389 | $15k | 5% |
| 202E35200 PIPE REMOVED, OVER 24" | 141 FT | $100.4 | $14k | 5% |
| 203E10000 EXCAVATION | 575 CY | $23.6 | $14k | 4% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 30 CY | $445 | $13k | 4% |
| 511E46511 CLASS QC1 CONCRETE, FOOTING, AS PER PLAN | 25 CY | $496 | $12k | 4% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $10,902 | $11k | 4% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN | 534 SY | $20 | $11k | 3% |