ADA-SR 247-07.76 Slide
ADA County · est $0.5M
Bid dateThursday, October 25—
ADA County · est $0.5M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 26 more items below.
| Item | Quantity | R1D G M INC | R2Alan Stone CO INC | R3Shelly & Sands INC | R4Skeens Excavating INC | R5Kokosing Construction Company INC | % of bid |
|---|---|---|---|---|---|---|---|
| 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER | 640 FT | $141 | $72.00 | $95.00 | $98.00 | $98.00 | 24% |
| 507E00301 STEEL PILES HP14X73, FURNISHED, AS PER PLAN | 1,568 FT | $45.50 | $38.00 | $42.00 | $50.00 | $60.00 | 19% |
| 524E94703 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK, AS PE | 960 FT | $42.00 | $61.00 | $70.00 | $85.00 | $98.00 | 11% |
| 524E95000 DRILLED SHAFTS, MISC.:PLUG PILE, 36" DIAMETER, UNR |
| Item | Quantity | R1D G M INC | R2Alan Stone CO INC | R3Shelly & Sands INC | R4Skeens Excavating INC | R5Kokosing Construction Company INC |
|---|---|---|---|---|---|---|
| 202E38000 GUARDRAIL REMOVED | 938 FT | $1.00 | $3.00 | $3.50 | $20.00 | $3.52 |
| 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A | 1 EACH | $250 | $433 | $175 | $500 | $176 |
| 203E10000 EXCAVATION | 4 CY | $50.00 | $661 | $60.00 | $250 | $345 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (NCHRP 350 OR MASH 201 | 1 EACH | $2,200 | $2,257 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 756 FT |
| $42.75 |
| $63.00 |
| $85.00 |
| $85.00 |
| $98.00 |
| 9% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 95 CY | $247 | $270 | $250 | $280 | $250 | 6% |
| 606E15050 GUARDRAIL, TYPE MGS | 925 FT | $20.00 | $18.00 | $19.00 | $18.50 | $19.12 | 5% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $17,500 | $27,000 | $36,450 | $18,000 | $23,500 | 5% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $14,000 | $3,000 | $3,947 | $8,000 | $2,000 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $14,000 | $35,000 | $36,300 | $8,000 | $19,500 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $50,000 | $10,000 | $15,000 | $20,000 | 3% |
| 203E20000 EMBANKMENT | 344 CY | $25.00 | $5.00 | $10.00 | $15.00 | $20.00 | 2% |
| 622E41000 PORTABLE BARRIER, 32" | 480 FT | $17.00 | $17.00 | $20.00 | $28.00 | $18.00 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.5") | 2,114 SY | $3.25 | $5.50 | $5.25 | $4.00 | $5.25 | 2% |
| 832E30000 EROSION CONTROL | 5,084 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL) | 2 EACH | $1,800 | $1,890 | $1,800 | $2,000 | $1,800 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,500 | $7,000 | $6,723 | $6,000 | $5,000 | 1% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 6 CY | $575 | $1,100 | $980 | $1,000 | $980 | 1% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 25 CY | $120 | $350 | $200 | $400 | $700 | 1% |
| 659E10000 SEEDING AND MULCHING | 1,191 SY | $2.50 | $1.50 | $2.70 | $1.00 | $2.61 | 1% |
| 619E16000 FIELD OFFICE, TYPE A | 3 MNTH | $800 | $1,000 | $2,900 | $200 | $500 | 1% |
| $2,175 |
| $2,400 |
| $2,189 |
| 659E14000 REPAIR SEEDING AND MULCHING | 60 SY | $0.05 | $5.00 | $0.70 | $1.00 | $0.68 |
| 659E20000 COMMERCIAL FERTILIZER | 0.2 TON | $300 | $2,772 | $635 | $400 | $637 |
| 659E31000 LIME | 0.25 ACRE | $80.00 | $736 | $151 | $400 | $151 |
| 659E35000 WATER | 6.4 MGAL | $1.00 | $36.00 | $1.00 | $1.00 | $1.00 |
| 204E10000 SUBGRADE COMPACTION | 43 SY | $12.00 | $4.00 | $8.00 | $50.00 | $10.00 |
| 304E20000 AGGREGATE BASE | 7 CY | $100 | $175 | $125 | $400 | $135 |
| 407E10000 TACK COAT | 205 GAL | $5.89 | $2.00 | $2.00 | $5.00 | $1.95 |
| 621E00100 RPM | 14 EACH | $150 | $158 | $150 | $165 | $150 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 14 EACH | $1.00 | $12.00 | $10.00 | $50.00 | $10.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 48 FT | $11.00 | $12.00 | $10.50 | $15.00 | $10.50 |
| 630E80100 SIGN, FLAT SHEET | 8 SF | $20.00 | $20.00 | $16.00 | $25.00 | $16.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 2 EACH | $55.00 | $108 | $50.00 | $250 | $50.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 1 EACH | $25.00 | $50.00 | $25.00 | $100 | $25.00 |
| 642E00090 EDGE LINE, 4" | 0.39 MILE | $4,000 | $3,884 | $2,500 | $2,800 | $3,700 |
| 642E00290 CENTER LINE | 0.19 MILE | $4,200 | $4,094 | $5,900 | $6,500 | $3,900 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 16 HOUR | $50.00 | $69.00 | $67.00 | $60.00 | $75.00 |
| 614E11630 INCREASED BARRIER DELINEATION | 55 FT | $3.00 | $2.50 | $1.50 | $10.00 | $2.25 |
| 614E13314 BARRIER REFLECTOR, TYPE 3 (BIDIRECTIONAL) | 28 EACH | $12.00 | $9.50 | $8.00 | $10.00 | $9.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 10 EACH | $12.00 | $14.00 | $15.00 | $25.00 | $13.00 |
| 614E22200 WORK ZONE EDGE LINE, CLASS I, 4", 740.06, TYPE I | 0.13 MILE | $6,500 | $6,374 | $6,650 | $2,000 | $10,500 |
| 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I | 24 FT | $10.00 | $8.50 | $14.00 | $20.00 | $8.00 |
| 616E10000 WATER | 1 MGAL | $1.00 | $21.00 | $45.00 | $100 | $50.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER | 640 FT | $141 | $90k | 23% |
| 507E00301 STEEL PILES HP14X73, FURNISHED, AS PER PLAN | 1,568 FT | $45.5 | $71k | 18% |
| 524E94703 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK, AS PE | 960 FT | $42 | $40k | 10% |
| 524E95000 DRILLED SHAFTS, MISC.:PLUG PILE, 36" DIAMETER, UNR | 756 FT | $42.75 | $32k | 8% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 95 CY | $247 | $23k | 6% |
| 606E15050 GUARDRAIL, TYPE MGS | 925 FT | $20 | $19k | 5% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $17,500 | $18k | 4% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $14,000 | $14k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $14,000 | $14k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10k | 3% |