DEL-US 36-22.83
DEL County · est $0.3M
Bid dateThursday, October 25—
DEL County · est $0.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 12 more items below.
| Item | Quantity | R1Bridge Specialists INC | R2Shelly & Sands INC | R3Complete General Construction Company | R4Sunesis Construction CO | % of bid |
|---|---|---|---|---|---|---|
| 848E20001 SURFACE PREPARATION USING HYDRODEMOLITION, AS PER | 928 SY | $61.00 | $72.00 | $73.00 | $52.04 | 23% |
| 848E10201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 928 SY | $47.00 | $60.00 | $30.00 | $74.76 | 18% |
| 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING | 475 FT | $70.00 | $72.00 | $80.00 | $79.46 | 13% |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $15,600 | $8,750 | $20,000 |
| Item | Quantity | R1Bridge Specialists INC | R2Shelly & Sands INC | R3Complete General Construction Company | R4Sunesis Construction CO |
|---|---|---|---|---|---|
| 202E23500 WEARING COURSE REMOVED | 95 SY | $11.00 | $29.00 | $20.00 | $46.61 |
| 202E38001 GUARDRAIL REMOVED, AS PER PLAN | 87.5 FT | $2.50 | $2.50 | $2.88 | $7.18 |
| 202E42001 ANCHOR ASSEMBLY REMOVED, TYPE A, AS PER PLAN | 1 EACH | $175 | $180 | $201 | $504 |
| 606E13000 GUARDRAIL, TYPE 5 | 87.5 FT | $17.50 | $18.00 | $20.15 | $19.86 |
| 606E35141 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $18,097 |
| 6% |
| 624E10000 MOBILIZATION | 1 LS | $14,350 | $10,000 | $10,000 | $41,374 | 6% |
| 516E46201 BEARING DEVICE, ROCKER, AS PER PLAN | 2 EACH | $4,810 | $6,500 | $4,700 | $7,571 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $7,930 | $16,500 | $7,000 | $7,283 | 3% |
| 516E46700 RESET BEARING | 8 EACH | $975 | $390 | $1,000 | $1,996 | 3% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 5 CY | $1,500 | $1,470 | $950 | $1,710 | 3% |
| 514E27700 FIELD PAINTING, MISC.:ROCKERS AND MAIN MEMBERS | 25 SF | $296 | $200 | $450 | $750 | 3% |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 548 FT | $13.00 | $16.00 | $15.00 | $22.33 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,915 | $2,200 | $3,000 | $2,563 | 3% |
| 848E50201 FULL DEPTH REPAIR, AS PER PLAN | 5 CY | $1,235 | $1,800 | $2,000 | $3,004 | 3% |
| 848E30201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE | 23 CY | $234 | $160 | $162 | $241 | 2% |
| 614E12420 DETOUR SIGNING | 1 LS | $5,362 | $4,600 | $14,000 | $4,980 | 2% |
| 516E11211 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S | 36 FT | $84.50 | $74.00 | $225 | $123 | 1% |
| 516E31001 JOINT SEALER, AS PER PLAN | 109 FT | $26.00 | $31.00 | $30.00 | $2.50 | 1% |
| 519E11100 PATCHING CONCRETE STRUCTURE | 25 SF | $97.00 | $212 | $200 | $177 | 1% |
| 848E50001 HAND CHIPPING, AS PER PLAN | 31 SY | $65.00 | $23.00 | $100 | $153 | 1% |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $2,000 | $1,500 | $2,000 | $1,850 | 1% |
| 1 EACH |
| $750 |
| $775 |
| $864 |
| $851 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 407E10000 TACK COAT | 8 GAL | $2.00 | $2.00 | $15.00 | $25.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2BIDIRECTIONAL | 8 EACH | $10.00 | $10.50 | $11.51 | $10.00 |
| 646E10010 EDGE LINE, 6" | 0.1 MILE | $11,990 | $25,700 | $25,698 | $25,698 |
| 646E10200 CENTER LINE | 0.05 MILE | $18,880 | $40,500 | $40,465 | $40,465 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 2 SNMT | $930 | $960 | $930 | $930 |
| 848E50101 TEST SLAB, AS PER PLAN | 1 LS | $1,300 | $1,600 | $2,000 | $3,411 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 848E20001 SURFACE PREPARATION USING HYDRODEMOLITION, AS PER | 928 SY | $61 | $57k | 22% |
| 848E10201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 928 SY | $47 | $44k | 17% |
| 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING | 475 FT | $70 | $33k | 13% |
| 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A | 1 LS | $15,600 | $16k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $14,350 | $14k | 6% |
| 516E46201 BEARING DEVICE, ROCKER, AS PER PLAN | 2 EACH | $4,810 | $10k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $7,930 | $8k | 3% |
| 516E46700 RESET BEARING | 8 EACH | $975 | $8k | 3% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 5 CY | $1,500 | $8k | 3% |
| 514E27700 FIELD PAINTING, MISC.:ROCKERS AND MAIN MEMBERS | 25 SF | $296 | $7k | 3% |