TRU-IR 80-04.71
TRU County · est $1.8M
Bid dateThursday, October 25—
TRU County · est $1.8M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 10 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Shelly Company | R3Chagrin Valley Paving INC | % of bid |
|---|---|---|---|---|---|
| 424E12001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B, AS P | 6,065 CY | $176 | $180 | $202 | 71% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A (T= 1 | 174,669 SY | $0.50 | $1.00 | $1.25 | 6% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 1,010 CY | $50.00 | $44.00 | $60.00 | 3% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 1,100 SY | $40.00 | $30.00 | $60.00 | 3% |
| 407E20000 NON-TRACKING TACK COAT | 15,882 GAL | $2.70 | $2.00 | $2.00 |
| Item | Quantity | R1Shelly & Sands INC | R2Shelly Company | R3Chagrin Valley Paving INC |
|---|---|---|---|---|
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 312 EACH | $5.00 | $5.00 | $1.00 |
| 646E20504 DOTTED LINE, 6" | 1,436 FT | $1.76 | $1.76 | $3.00 |
| 614E12460 WORK ZONE MARKING SIGN | 15 EACH | $220 | $120 | $120 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 20 CY | $160 | $120 | $250 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 3% |
| 646E10010 EDGE LINE, 6" | 15.68 MILE | $2,514 | $2,514 | $2,600 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $30,000 | $98,000 | $150,000 | 2% |
| 408E10000 PRIME COAT | 7,128 GAL | $3.00 | $3.00 | $4.00 | 1% |
| 624E10000 MOBILIZATION | 1 LS | $16,000 | $40,000 | $147,600 | 1% |
| 614E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 27 SNMT | $550 | $625 | $625 | 1% |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 30.8 MILE | $475 | $750 | $750 | 1% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 200 HOUR | $65.00 | $65.00 | $100 | 1% |
| 646E10110 LANE LINE, 6" | 7.7 MILE | $1,623 | $1,623 | $1,700 | 1% |
| 621E00100 RPM | 390 EACH | $31.15 | $31.15 | $31.15 | 1% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 75 CY | $150 | $235 | $250 | 1% |
| 618E40600 RUMBLE STRIPS, (ASPHALT CONCRETE) | 15.4 MILE | $433 | $500 | $1,250 | 0% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 6 SNMT | $1,100 | $925 | $925 | 0% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,000 | $5,000 | $15,000 | 0% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (1 1/4") | 1,792 SY | $2.00 | $3.00 | $3.00 | 0% |
| 646E10310 CHANNELIZING LINE, 12" | 1,800 FT | $1.97 | $1.97 | $3.00 | 0% |
| 7.7 MILE |
| $400 |
| $715 |
| $715 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 7.7 MILE | $400 | $715 | $715 |
| 614E23010 WORK ZONE CHANNELIZING LINE, CLASS I, 12" | 1,800 FT | $0.50 | $0.85 | $0.85 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 1,800 FT | $0.50 | $0.85 | $0.85 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,000 | $5,000 | $3,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 424E12001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B, AS P | 6,065 CY | $175.5 | $1.06M | 70% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A (T= 1 | 174,669 SY | $0.5 | $87k | 6% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 1,010 CY | $50 | $51k | 3% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 1,100 SY | $40 | $44k | 3% |
| 407E20000 NON-TRACKING TACK COAT | 15,882 GAL | $2.7 | $43k | 3% |
| 646E10010 EDGE LINE, 6" | 15.68 MILE | $2,514 | $39k | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $30,000 | $30k | 2% |
| 408E10000 PRIME COAT | 7,128 GAL | $3 | $21k | 1% |
| 624E10000 MOBILIZATION | 1 LS | $16,000 | $16k | 1% |
| 614E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 27 SNMT | $550 | $15k | 1% |