SUM-Cleveland Mass. Phase 2/3 (PART 1, PART 2, PART 3)
SUM County · est $7.3M
Bid dateThursday, November 29—
SUM County · est $7.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 9%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 375 more items below.
| Item | Quantity | R1Karvo Companies INC | R2Ruhlin Company | R3Lockhart Concrete CO | R4Shelly & Sands INC | R5Fabrizi Trucking & Paving CO INC | R6Wenger Excavating INC | R7S E T INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $505,000 | $220,000 | $294,000 | $748,000 | $142,096 | $702,111 | $450,000 | 14% |
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 2,740 CY | $140 | $148 | $154 | $150 | $172 | $135 | $176 | 10% |
| 624E10000 MOBILIZATION |
| Item | Quantity | R1Karvo Companies INC | R2Ruhlin Company | R3Lockhart Concrete CO | R4Shelly & Sands INC | R5Fabrizi Trucking & Paving CO INC | R6Wenger Excavating INC | R7S E T INC |
|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $10,000 | $25,000 | $19,000 | $45,000 | $14,647 | $21,347 | $150,000 |
| 202E20010 HEADWALL REMOVED | 2 EACH | $325 | $250 | $100 | $270 | $393 | $778 | $180 |
| 202E23000 PAVEMENT REMOVED | 3,016 SY | $13.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1 LS |
| $345,000 |
| $200,000 |
| $347,000 |
| $200,000 |
| $200,000 |
| $429,772 |
| $250,000 |
| 9% |
| 611E01801 8" CONDUIT, TYPE B, AS PER PLAN | 1,909 FT | $172 | $295 | $190 | $230 | $318 | $160 | $260 | 9% |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 3,258 CY | $68.00 | $97.00 | $50.00 | $70.00 | $53.07 | $70.40 | $65.00 | 6% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 7,067 FT | $26.00 | $27.00 | $30.00 | $23.00 | $27.00 | $35.00 | $28.00 | 5% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (1027 CY | $155 | $183 | $193 | $180 | $214 | $168 | $200 | 4% |
| 204E30011 GRANULAR MATERIAL, TYPE B, AS PER PLAN | 3,911 CY | $40.00 | $50.00 | $35.00 | $47.00 | $51.27 | $56.80 | $55.00 | 4% |
| 611E04401 12" CONDUIT, TYPE B, AS PER PLAN | 871 FT | $168 | $295 | $200 | $255 | $323 | $177 | $276 | 4% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 983 CY | $145 | $204 | $165 | $180 | $237 | $177 | $222 | 4% |
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 891 CY | $150 | $166 | $154 | $150 | $194 | $120 | $185 | 4% |
| 203E10000 EXCAVATION | 7,391 CY | $18.00 | $13.00 | $9.00 | $15.00 | $29.93 | $26.40 | $26.50 | 4% |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 12,757 SY | $10.00 | $8.00 | $12.00 | $4.00 | $7.68 | $5.70 | $10.00 | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $110,000 | $129,000 | $197,000 | $150,000 | $90,504 | $159,772 | $85,000 | 3% |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 1,286 CY | $80.00 | $70.00 | $82.50 | $75.00 | $55.93 | $70.40 | $70.00 | 3% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 4,073 FT | $25.00 | $27.00 | $30.00 | $25.00 | $27.00 | $37.00 | $30.00 | 3% |
| 611E99574 MANHOLE, NO. 3 | 23 EACH | $4,425 | $4,400 | $3,500 | $5,900 | $5,652 | $3,969 | $5,500 | 3% |
| 608E10000 4" CONCRETE WALK | 25,387 SF | $4.00 | $5.00 | $5.00 | $5.00 | $5.50 | $6.60 | $6.00 | 3% |
| 832E30000 EROSION CONTROL | 100,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 3% |
| 611E53306 53" X 83" CONDUIT, TYPE B, 706.04 | 296 FT | $335 | $480 | $275 | $477 | $493 | $379 | $650 | 3% |
| $10.00 |
| $12.00 |
| $8.00 |
| $14.69 |
| $10.50 |
| $12.00 |
| 202E30000 WALK REMOVED | 213 SF | $1.00 | $1.50 | $0.50 | $4.50 | $7.10 | $1.00 | $4.50 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 4,653 FT | $12.00 | $5.00 | $22.00 | $27.00 | $22.23 | $8.25 | $25.00 |
| 202E35200 PIPE REMOVED, OVER 24" | 198 FT | $22.00 | $15.00 | $42.00 | $28.00 | $74.34 | $14.50 | $55.00 |
| 202E58000 MANHOLE REMOVED | 1 EACH | $640 | $400 | $1,000 | $1,000 | $500 | $627 | $1,100 |
| 202E58100 CATCH BASIN REMOVED | 38 EACH | $340 | $230 | $200 | $450 | $481 | $477 | $500 |
| 202E58500 CATCH BASIN ABANDONED | 3 EACH | $950 | $201 | $70.00 | $950 | $483 | $478 | $800 |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT | 282 FT | $24.00 | $30.00 | $20.00 | $40.00 | $37.80 | $8.20 | $28.00 |
| 203E20000 EMBANKMENT | 3,517 CY | $14.00 | $12.00 | $9.00 | $9.00 | $11.46 | $20.00 | $25.00 |
| 204E10000 SUBGRADE COMPACTION | 17,126 SY | $1.00 | $1.25 | $1.00 | $3.50 | $2.15 | $4.80 | $3.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 3,858 CY | $18.00 | $20.00 | $9.00 | $14.00 | $21.87 | $26.40 | $18.00 |
| 204E45000 PROOF ROLLING | 8 HOUR | $100 | $600 | $125 | $200 | $108 | $198 | $300 |
| 204E50000 GEOTEXTILE FABRIC | 11,613 SY | $1.00 | $1.25 | $3.00 | $0.80 | $1.74 | $1.20 | $1.50 |
| 608E13001 6" CONCRETE WALK, AS PER PLAN | 728 SF | $5.50 | $15.00 | $6.00 | $15.00 | $7.50 | $7.80 | $8.00 |
| 608E15001 8" CONCRETE WALK, AS PER PLAN | 4,448 SF | $6.50 | $9.00 | $7.00 | $12.00 | $8.00 | $9.40 | $9.50 |
| 608E52000 CURB RAMP | 2,124 SF | $12.00 | $20.00 | $12.00 | $15.00 | $14.00 | $14.60 | $16.00 |
| 623E38500 MONUMENT ASSEMBLY | 10 EACH | $875 | $500 | $250 | $1,100 | $740 | $850 | $1,300 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 14 EACH | $195 | $195 | $50.00 | $200 | $228 | $218 | $300 |
| 690E50200 SPECIAL - MAILBOX SUPPORT SYSTEM, DOUBLE | 1 EACH | $310 | $300 | $80.00 | $220 | $457 | $334 | $350 |
| 690E65016 SPECIAL - WORK INVOLVING PETROLEUM CONTAMINATED SO | 629 TON | $50.00 | $75.00 | $200 | $60.00 | $69.62 | $19.80 | $80.00 |
| 861E10000 GEOGRID FOR SUBGRADE STABILIZATION | 11,613 SY | $1.80 | $1.99 | $4.00 | $1.30 | $2.37 | $2.80 | $2.00 |
| 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1 | 4 SY | $125 | $250 | $100 | $160 | $149 | $118 | $300 |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 27 CY | $120 | $110 | $125 | $98.00 | $160 | $159 | $125 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 2 CY | $230 | $200 | $158 | $290 | $486 | $179 | $300 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $200 | $88.00 | $250 | $150 | $217 | $218 | $150 |
| 659E00300 TOPSOIL | 1,147 CY | $33.50 | $32.28 | $20.00 | $45.00 | $34.52 | $12.50 | $66.39 |
| 659E10000 SEEDING AND MULCHING | 10,337 SY | $0.73 | $0.70 | $1.27 | $2.00 | $0.79 | $2.40 | $3.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 517 SY | $1.00 | $0.68 | $1.27 | $0.50 | $1.08 | $1.60 | $0.55 |
| 659E15000 INTER-SEEDING | 517 SY | $0.50 | $0.68 | $1.27 | $0.10 | $1.08 | $1.60 | $1.11 |
| 659E20000 COMMERCIAL FERTILIZER | 1.44 TON | $750 | $648 | $660 | $650 | $814 | $778 | $719 |
| 659E31000 LIME | 2.14 ACRE | $1.00 | $153 | $440 | $135 | $109 | $672 | $144 |
| 659E35000 WATER | 57 MGAL | $0.50 | $1.00 | $50.00 | $1.30 | $1.08 | $6.00 | $1.50 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $20,000 | $20,000 | $4,950 | $1,300 | $1,383 | $17,242 | $55,000 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $20,000 | $20,000 | $20,000 | $32,000 | $14,104 | $24,311 | $45,000 |
| 602E20000 CONCRETE MASONRY | 27.5 CY | $970 | $905 | $800 | $1,300 | $519 | $1,422 | $1,000 |
| 605E13410 6" UNCLASSIFIED PIPE UNDERDRAINS WITH GEOTEXTILE F | 824 FT | $8.00 | $12.00 | $19.00 | $14.00 | $26.34 | $8.60 | $18.00 |
| 605E14020 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 6,452 FT | $7.75 | $10.00 | $20.00 | $13.00 | $10.56 | $8.60 | $17.00 |
| 611E00100 4" CONDUIT, TYPE B | 500 FT | $10.00 | $15.00 | $18.00 | $15.00 | $20.25 | $12.20 | $10.00 |
| 611E00100 4" CONDUIT, TYPE B, 707.33 | 6 FT | $50.00 | $41.00 | $18.00 | $118 | $89.66 | $12.20 | $110 |
| 611E00100 4" CONDUIT, TYPE B, 748.02 | 41 FT | $20.00 | $27.00 | $18.00 | $48.00 | $32.55 | $14.20 | $50.00 |
| 611E00200 4" CONDUIT, TYPE C | 500 FT | $7.00 | $10.00 | $18.00 | $14.00 | $13.86 | $11.40 | $7.00 |
| 611E00200 4" CONDUIT, TYPE C, 707.45 | 6 FT | $30.00 | $42.00 | $18.00 | $120 | $87.82 | $11.40 | $45.00 |
| 611E00400 4" CONDUIT, TYPE E | 500 FT | $5.00 | $15.00 | $18.00 | $15.00 | $10.41 | $11.40 | $8.00 |
| 611E00406 4" CONDUIT, TYPE F | 500 FT | $5.00 | $15.00 | $18.00 | $15.00 | $10.47 | $11.40 | $6.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 462 FT | $13.00 | $26.00 | $20.00 | $27.00 | $23.98 | $13.20 | $20.00 |
| 611E00900 6" CONDUIT, TYPE B | 530 FT | $10.00 | $26.00 | $20.00 | $19.00 | $30.85 | $13.20 | $10.00 |
| 611E01100 6" CONDUIT, TYPE C | 1,000 FT | $8.00 | $20.00 | $20.00 | $16.00 | $30.48 | $12.80 | $9.00 |
| 611E01400 6" CONDUIT, TYPE E | 500 FT | $5.00 | $20.00 | $20.00 | $16.00 | $11.74 | $12.80 | $8.00 |
| 611E01500 6" CONDUIT, TYPE F | 500 FT | $5.00 | $20.00 | $20.00 | $16.00 | $18.22 | $12.80 | $6.00 |
| 611E03100 10" CONDUIT, TYPE B | 13 FT | $90.00 | $25.00 | $30.00 | $103 | $61.91 | $43.20 | $95.00 |
| 611E03300 10" CONDUIT, TYPE C, 707.45 | 12 FT | $90.00 | $55.00 | $30.00 | $103 | $69.30 | $42.80 | $100 |
| 611E04400 12" CONDUIT, TYPE B | 588 FT | $90.00 | $40.00 | $45.00 | $88.00 | $84.06 | $78.70 | $165 |
| 611E04400 12" CONDUIT, TYPE B, 706.08 | 11 FT | $200 | $90.00 | $48.00 | $174 | $141 | $80.40 | $200 |
| 611E04400 12" CONDUIT, TYPE B, 707.12 | 6 FT | $180 | $105 | $45.00 | $162 | $194 | $80.60 | $180 |
| 611E04400 12" CONDUIT, TYPE B, 707.33 | 20 FT | $115 | $65.00 | $45.00 | $117 | $103 | $79.70 | $125 |
| 611E04400 12" CONDUIT, TYPE B, 748.02 | 177 FT | $105 | $65.00 | $45.00 | $94.00 | $134 | $82.60 | $130 |
| 611E04600 12" CONDUIT, TYPE C | 387 FT | $45.00 | $46.00 | $45.00 | $40.00 | $76.30 | $78.20 | $15.00 |
| 611E04600 12" CONDUIT, TYPE C, 706.02 | 22 FT | $100 | $65.00 | $47.00 | $128 | $99.75 | $78.60 | $100 |
| 611E04600 12" CONDUIT, TYPE C, 707.12 | 6 FT | $185 | $85.00 | $46.00 | $169 | $186 | $78.70 | $160 |
| 611E04600 12" CONDUIT, TYPE C, 707.33 | 12 FT | $180 | $75.00 | $45.00 | $157 | $161 | $78.70 | $135 |
| 611E04600 12" CONDUIT, TYPE C, 748.02 | 23 FT | $70.00 | $53.00 | $45.00 | $90.00 | $108 | $82.40 | $125 |
| 611E05900 15" CONDUIT, TYPE B | 325 FT | $75.00 | $55.00 | $67.00 | $85.00 | $118 | $89.50 | $130 |
| 611E05900 15" CONDUIT, TYPE B, 706.02 | 10 FT | $170 | $120 | $69.00 | $206 | $144 | $90.00 | $200 |
| 611E05900 15" CONDUIT, TYPE B, 706.08 | 10 FT | $185 | $75.00 | $70.00 | $192 | $161 | $90.00 | $220 |
| 611E05900 15" CONDUIT, TYPE B, 707.45 | 6 FT | $250 | $85.00 | $67.00 | $173 | $217 | $89.80 | $200 |
| 611E05900 15" CONDUIT, TYPE B, 748.02 | 132 FT | $75.00 | $64.00 | $67.00 | $87.00 | $110 | $101 | $160 |
| 611E06100 15" CONDUIT, TYPE C, 748.02 | 135 FT | $78.00 | $64.00 | $67.00 | $85.00 | $105 | $99.70 | $105 |
| 611E07400 18" CONDUIT, TYPE B | 311 FT | $72.00 | $65.00 | $75.00 | $75.00 | $93.84 | $97.90 | $125 |
| 611E07400 18" CONDUIT, TYPE B, 748.02 | 6 FT | $400 | $120 | $75.00 | $330 | $229 | $100 | $190 |
| 611E08900 21" CONDUIT, TYPE B | 36 FT | $85.00 | $65.00 | $85.00 | $83.00 | $136 | $102 | $175 |
| 611E08900 21" CONDUIT, TYPE B, 748.02 | 133 FT | $80.00 | $75.00 | $85.00 | $89.00 | $148 | $140 | $185 |
| 611E10400 24" CONDUIT, TYPE B | 72 FT | $68.00 | $65.00 | $92.00 | $81.00 | $118 | $107 | $130 |
| 611E10400 24" CONDUIT, TYPE B, 748.02 | 675 FT | $92.00 | $85.00 | $96.00 | $107 | $110 | $140 | $200 |
| 611E11900 27" CONDUIT, TYPE B | 633 FT | $75.00 | $80.00 | $101 | $104 | $105 | $111 | $180 |
| 611E11900 27" CONDUIT, TYPE B, 748.02 | 145 FT | $130 | $100 | $101 | $98.00 | $158 | $187 | $220 |
| 611E12100 27" CONDUIT, TYPE C | 242 FT | $88.00 | $100 | $101 | $105 | $130 | $110 | $135 |
| 611E13400 30" CONDUIT, TYPE B | 280 FT | $92.00 | $85.00 | $111 | $103 | $103 | $111 | $145 |
| 611E13400 30" CONDUIT, TYPE B, 748.02 | 74 FT | $158 | $110 | $111 | $144 | $192 | $187 | $300 |
| 611E16400 36" CONDUIT, TYPE B | 39 FT | $145 | $130 | $131 | $111 | $151 | $135 | $185 |
| 611E16400 36" CONDUIT, TYPE B, 706.02 | 90 FT | $340 | $200 | $131 | $216 | $413 | $209 | $400 |
| 611E16400 36" CONDUIT, TYPE B, 748.06 | 68 FT | $800 | $650 | $131 | $1,050 | $955 | $189 | $650 |
| 611E53210 48" X 76" CONDUIT, TYPE B, 706.04 | 51 FT | $650 | $500 | $250 | $555 | $486 | $335 | $545 |
| 611E53310 53" X 83" CONDUIT, TYPE C, 706.04 | 92 FT | $325 | $525 | $275 | $435 | $526 | $377 | $580 |
| 611E98150 CATCH BASIN, NO. 3 | 10 EACH | $3,445 | $3,230 | $1,250 | $3,670 | $1,806 | $3,948 | $3,200 |
| 611E98180 CATCH BASIN, NO. 3A | 14 EACH | $2,195 | $2,400 | $1,250 | $3,100 | $2,184 | $2,922 | $3,400 |
| 611E98370 CATCH BASIN, NO. 6 | 5 EACH | $2,000 | $3,950 | $2,000 | $3,150 | $2,947 | $2,972 | $3,600 |
| 611E98371 CATCH BASIN, NO. 6, AS PER PLAN | 11 EACH | $3,950 | $4,000 | $2,000 | $3,800 | $2,368 | $3,363 | $3,350 |
| 611E98390 CATCH BASIN, NO. 7 | 8 EACH | $1,400 | $1,900 | $1,300 | $2,130 | $3,253 | $1,468 | $1,200 |
| 611E98470 CATCH BASIN, NO. 2-2B | 5 EACH | $1,300 | $1,300 | $1,300 | $2,180 | $1,307 | $1,977 | $1,300 |
| 611E98510 CATCH BASIN, NO. 2-3 | 4 EACH | $1,575 | $1,500 | $1,500 | $3,380 | $2,695 | $2,768 | $2,500 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 3 EACH | $900 | $900 | $500 | $1,080 | $985 | $449 | $550 |
| 611E99584 MANHOLE, NO. 3 WITH 96" BASE I.D. AND 9" WEIR | 1 EACH | $7,200 | $10,000 | $5,000 | $8,800 | $17,504 | $10,892 | $10,500 |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 3 EACH | $900 | $750 | $600 | $1,250 | $814 | $790 | $800 |
| 611E99690 MANHOLE, MISC.: JUNCTION CHAMBER | 1 EACH | $28,500 | $56,000 | $23,000 | $45,000 | $41,197 | $19,882 | $28,800 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 2 EACH | $200 | $255 | $300 | $450 | $316 | $329 | $250 |
| 611E99720 INSPECTION WELL | 5 EACH | $250 | $700 | $1,500 | $490 | $1,257 | $360 | $300 |
| 611E99721 INSPECTION WELL, AS PER PLAN | 4 EACH | $1,285 | $350 | $1,850 | $843 | $686 | $598 | $600 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 2,500 LB | $1.50 | $2.50 | $2.00 | $1.00 | $1.36 | $2.40 | $1.25 |
| 895E10030 MANUFACTURED WATER QUALITY STRUCTURE, TYPE 3 | 1 EACH | $27,500 | $45,000 | $28,000 | $51,000 | $5,742 | $26,397 | $28,500 |
| 611E11900 27" CONDUIT, TYPE B, 707.42 | 96 FT | $60.00 | $100 | $135 | $25.00 | $119 | $103 | $85.00 |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 1,089 SY | $32.00 | $26.35 | $44.00 | $38.00 | $30.70 | $124 | $27.00 |
| 253E01000 PAVEMENT REPAIR | 1,089 SY | $62.00 | $72.98 | $99.00 | $95.00 | $85.03 | $138 | $73.00 |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, M | 13,535 SY | $1.40 | $3.55 | $1.10 | $1.50 | $5.70 | $2.80 | $3.80 |
| 407E20000 NON-TRACKING TACK COAT | 2,836 GAL | $3.25 | $3.85 | $2.20 | $3.00 | $4.49 | $3.00 | $4.00 |
| 441E50400 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | — | $275 | $223 | $330 | $400 | $260 | $398 | $245 |
| 441E50600 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (163 CY | $200 | $213 | $330 | $300 | $248 | $334 | $235 |
| 452E10050 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS | 182 SY | $40.00 | $70.00 | $63.00 | $98.00 | $65.00 | $78.60 | $56.00 |
| 452E12050 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS | 1,954 SY | $48.00 | $75.00 | $75.00 | $80.00 | $72.00 | $87.80 | $65.00 |
| 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN " | 592 FT | $40.00 | $30.00 | $30.00 | $42.00 | $27.00 | $49.00 | $26.00 |
| 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN " | 59 FT | $50.00 | $30.00 | $3.00 | $43.00 | $35.00 | $68.00 | $48.00 |
| 609E14000 CURB, TYPE 2-A | 1,232 FT | $20.00 | $27.00 | $5.00 | $14.00 | $8.00 | $24.00 | $8.00 |
| 609E26000 CURB, TYPE 6 | 1,530 FT | $15.00 | $18.00 | $10.00 | $29.00 | $28.00 | $27.00 | $20.00 |
| 609E30000 CURB, TYPE 8 | 97 FT | $25.00 | $25.00 | $13.00 | $33.00 | $35.00 | $56.70 | $38.00 |
| 638E00704 6" WATER MAIN DUCTILE IRON PIPE ANSI CLASS 53, MEC | 56 FT | $78.00 | $120 | $150 | $85.00 | $126 | $88.70 | $125 |
| 638E01304 8" WATER MAIN DUCTILE IRON PIPE ANSI CLASS 53, MEC | 280 FT | $100 | $135 | $165 | $116 | $130 | $98.40 | $155 |
| 638E04900 1" COPPER SERVICE BRANCH | 280 FT | $45.00 | $30.00 | $50.00 | $100 | $88.08 | $54.60 | $65.00 |
| 638E10200 6" FIRE HYDRANT | 1 EACH | $5,200 | $7,000 | $6,200 | $5,500 | $5,161 | $5,935 | $6,000 |
| 638E10300 FIRE HYDRANT EXTENDED AND ADJUSTED TO GRADE | 12 EACH | $2,575 | $2,100 | $2,500 | $2,600 | $2,093 | $2,142 | $2,100 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 38 EACH | $430 | $200 | $150 | $400 | $488 | $124 | $350 |
| 638E10901 SERVICE BOX ADJUSTED TO GRADE, AS PER PLAN | 28 EACH | $300 | $105 | $100 | $380 | $488 | $98.00 | $220 |
| 611E00100 4" CONDUIT, TYPE B | 300 FT | $10.00 | $63.00 | $200 | $22.00 | $87.21 | $36.40 | $17.00 |
| 611E00200 4" CONDUIT, TYPE C | 300 FT | $10.00 | $63.00 | $200 | $18.00 | $75.28 | $35.70 | $12.00 |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 13 EACH | $950 | $500 | $500 | $850 | $814 | $850 | $800 |
| 611E99661 MANHOLE RECONSTRUCTED TO GRADE, AS PER PLAN | 2 EACH | $1,075 | $1,200 | $3,000 | $1,500 | $922 | $3,211 | $1,500 |
| 625E00450 CONNECTION, FUSED PULL APART | 8 EACH | $117 | $74.25 | $138 | $95.00 | $83.52 | $94.00 | $175 |
| 625E00460 CONNECTION, UNFUSED PULL APART | 8 EACH | $114 | $74.25 | $138 | $95.00 | $83.52 | $94.00 | $185 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 32 EACH | $152 | $62.75 | $105 | $105 | $70.58 | $79.00 | $160 |
| 625E22990 NO. 6 AWG 600 VOLT DISTRIBUTION CABLE | 2,565 FT | $2.18 | $1.73 | $2.75 | $1.60 | $1.95 | $2.40 | $2.80 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 1,488 FT | $1.44 | $1.08 | $2.09 | $1.30 | $1.21 | $2.40 | $3.50 |
| 625E25400 CONDUIT, 2", 725.04 | 115 FT | $9.03 | $25.10 | $16.50 | $10.00 | $28.23 | $33.00 | $16.50 |
| 625E25900 CONDUIT, JACKED OR DRILLED: 4", 725.04 | 580 FT | $31.26 | $52.98 | $71.50 | $47.00 | $59.59 | $59.00 | $60.00 |
| 625E26250 LUMINAIRE, CONVENTIONAL, 200W, HPS, TYPE II, MVOLT | 8 EACH | $443 | $436 | $660 | $340 | $490 | $627 | $920 |
| 625E29002 TRENCH, 24" DEEP | 115 FT | $7.50 | $4.68 | $11.00 | $10.00 | $5.26 | $6.00 | $10.50 |
| 625E30700 PULL BOX, 725.08, 18" | 8 EACH | $716 | $714 | $1,045 | $900 | $803 | $908 | $1,100 |
| 625E36000 PLASTIC CAUTION TAPE | 115 FT | $0.51 | $0.18 | $1.10 | $0.25 | $0.20 | $0.50 | $1.00 |
| 625E17951 BRACKET ARM, 6', AS PER PLAN | 8 EACH | $430 | $755 | $950 | $580 | $849 | $979 | $800 |
| 625E32000 GROUND ROD | 4 EACH | $252 | $103 | $149 | $185 | $116 | $134 | $200 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 112.1 FT | $5.30 | $6.60 | $7.70 | $7.00 | $7.59 | $10.00 | $8.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 520.2 FT | $6.85 | $7.85 | $8.80 | $8.00 | $8.68 | $11.00 | $9.00 |
| 630E04100 GROUND MOUNTED SUPPORT, NO. 4 POST | 15.4 FT | $11.45 | $10.00 | $9.90 | $10.00 | $9.76 | $12.00 | $10.00 |
| 630E08520 STREET NAME SIGN SUPPORT, NO. 3 POST | 33.6 FT | $9.25 | $8.00 | $9.35 | $8.50 | $9.22 | $11.00 | $10.00 |
| 630E08600 SIGN POST REFLECTOR | 4 EACH | $53.60 | $29.73 | $49.50 | $31.00 | $48.82 | $50.00 | $50.00 |
| 630E10902 OVERHEAD SIGN SUPPORT, TYPE TC-16.21, DESIGN 9 | 3 EACH | $11,250 | $11,200 | $12,375 | $12,000 | $10,722 | $10,877 | $12,500 |
| 630E11202 OVERHEAD SIGN SUPPORT, TYPE TC-16.21, DESIGN 12 | 1 EACH | $12,050 | $15,650 | $13,255 | $16,000 | $15,509 | $15,632 | $17,500 |
| 630E79101 SIGN HANGER ASSEMBLY, MAST ARM, AS PER PLAN | 19 EACH | $315 | $295 | $314 | $310 | $321 | $179 | $320 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 10 EACH | $45.25 | $105 | $71.50 | $110 | $73.11 | $611 | $80.00 |
| 630E80100 SIGN, FLAT SHEET | 596.2 SF | $14.80 | $13.10 | $15.40 | $14.00 | $15.19 | $19.75 | $16.00 |
| 630E80500 SIGN, DOUBLE FACED, STREET NAME | 6 EACH | $97.05 | $79.00 | $138 | $82.00 | $136 | $135 | $140 |
| 630E80510 SIGN, STREET NAME | 6 EACH | $88.55 | $66.00 | $93.50 | $70.00 | $92.22 | $203 | $95.00 |
| 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION | 4 EACH | $4,800 | $3,775 | $5,280 | $4,000 | $2,383 | $2,989 | $4,500 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 51 EACH | $29.25 | $13.60 | $22.00 | $14.00 | $21.70 | $68.00 | $22.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 5 EACH | $49.45 | $50.00 | $82.50 | $53.00 | $81.37 | $76.00 | $85.00 |
| 630E85101 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, AS | 2 EACH | $70.70 | $33.00 | $330 | $35.00 | $325 | $88.00 | $350 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 37 EACH | $40.35 | $22.60 | $33.00 | $24.00 | $32.55 | $62.00 | $35.00 |
| 630E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL | 7 EACH | $147 | $71.00 | $55.00 | $75.00 | $54.25 | $59.00 | $60.00 |
| 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL | 8 EACH | $28.95 | $47.00 | $22.00 | $50.00 | $21.70 | $88.00 | $25.00 |
| 631E93241 SCHOOL SPEED LIMIT SIGN ASSEMBLY, SOLAR-POWERED, A | 2 EACH | $4,500 | $4,182 | $4,950 | $4,200 | $4,537 | $6,788 | $5,500 |
| 631E94490 REMOVAL, MISC.:REMOVAL OF SIGN SERVICE | 2 EACH | $600 | $301 | $660 | $530 | $326 | $602 | $350 |
| 631E94490 REMOVAL, MISC.:SCHOOL SPEED LIMIT ASSEMBLY, SOLAR- | 1 EACH | $2,300 | $454 | $2,530 | $1,500 | $493 | $709 | $2,500 |
| 632E64020 PEDESTAL FOUNDATION | 3 EACH | $1,003 | $926 | $880 | $790 | $1,004 | $932 | $1,200 |
| 632E90010 PEDESTAL, MISC.:PEDESTAL, 16', TRANSFORMER BASE | 2 EACH | $782 | $1,701 | $825 | $1,500 | $1,846 | $1,907 | $1,300 |
| 642E00090 EDGE LINE, 4" | 0.28 MILE | $650 | $1,335 | $770 | $680 | $759 | $1,770 | $780 |
| 642E00190 LANE LINE, 4" | 0.54 MILE | $500 | $1,220 | $660 | $530 | $651 | $1,680 | $660 |
| 642E00290 CENTER LINE | 1.47 MILE | $850 | $1,480 | $990 | $900 | $976 | $1,820 | $1,000 |
| 642E00390 CHANNELIZING LINE, 8" | 1,818 FT | $0.50 | $0.55 | $1.05 | $0.50 | $1.03 | $2.00 | $1.20 |
| 642E00490 STOP LINE | 356 FT | $3.00 | $2.50 | $3.85 | $3.00 | $3.80 | $4.00 | $4.00 |
| 642E00590 CROSSWALK LINE | 1,434 FT | $2.00 | $2.00 | $2.26 | $2.00 | $2.22 | $4.00 | $2.50 |
| 642E00690 TRANSVERSE/DIAGONAL LINE | 115 FT | $2.25 | $2.25 | $2.75 | $2.30 | $2.71 | $4.00 | $2.80 |
| 642E01090 SCHOOL SYMBOL MARKING, 72" | 2 EACH | $200 | $350 | $385 | $210 | $380 | $490 | $400 |
| 642E01290 LANE ARROW | 44 EACH | $85.00 | $55.00 | $60.50 | $90.00 | $59.67 | $160 | $60.00 |
| 644E01350 LANE REDUCTION ARROW | 4 EACH | $125 | $580 | $248 | $132 | $244 | $700 | $250 |
| 625E25400 CONDUIT, 2", 725.04 | 91 FT | $15.84 | $18.30 | $16.50 | $10.00 | $20.58 | $20.00 | $25.00 |
| 625E25500 CONDUIT, 3", 725.04 | 81 FT | $24.38 | $26.35 | $19.80 | $18.00 | $29.64 | $29.00 | $38.00 |
| 625E25600 CONDUIT, 4", 725.04 | 74 FT | $32.15 | $42.35 | $24.00 | $26.00 | $47.64 | $45.00 | $56.00 |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 4" | 567 FT | $40.30 | $58.18 | $71.50 | $47.00 | $65.44 | $63.00 | $60.00 |
| 625E29000 TRENCH | 211 FT | $7.50 | $4.97 | $11.00 | $10.50 | $5.59 | $7.00 | $25.00 |
| 625E30700 PULL BOX, 725.08, 18" | 6 EACH | $716 | $714 | $1,045 | $900 | $803 | $770 | $1,100 |
| 625E30706 PULL BOX, 725.08, 24" | 2 EACH | $803 | $868 | $1,155 | $1,000 | $976 | $990 | $1,350 |
| 625E32000 GROUND ROD | 18 EACH | $152 | $85.75 | $149 | $185 | $96.45 | $120 | $200 |
| 625E36000 PLASTIC CAUTION TAPE | 211 FT | $0.51 | $0.18 | $1.10 | $0.25 | $0.20 | $0.50 | $1.00 |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 10 EACH | $751 | $723 | $990 | $900 | $813 | $832 | $1,100 |
| 632E05087 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 7 EACH | $1,243 | $1,183 | $1,320 | $1,250 | $1,331 | $1,450 | $1,600 |
| 632E20731 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN, | 16 EACH | $570 | $440 | $578 | $740 | $495 | $507 | $700 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 17 EACH | $18.45 | $18.30 | $44.00 | $26.00 | $20.58 | $70.00 | $60.00 |
| 632E25010 COVERING OF PEDESTRIAN SIGNAL HEAD | 16 EACH | $18.45 | $18.30 | $44.00 | $26.00 | $20.58 | $70.00 | $40.00 |
| 632E26001 PEDESTRIAN PUSHBUTTON, AS PER PLAN | 16 EACH | $390 | $326 | $303 | $320 | $366 | $350 | $300 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 2,544 FT | $2.06 | $2.05 | $2.15 | $2.60 | $2.31 | $2.40 | $3.00 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 2,229 FT | $2.28 | $2.28 | $2.48 | $2.90 | $2.56 | $3.80 | $3.20 |
| 632E64010 SIGNAL SUPPORT FOUNDATION | 8 EACH | $2,520 | $2,583 | $5,280 | $3,700 | $2,905 | $3,000 | $6,500 |
| 632E64020 PEDESTAL FOUNDATION | 8 EACH | $1,060 | $790 | $770 | $790 | $888 | $948 | $1,200 |
| 632E65200 LOOP DETECTOR LEAD-IN CABLE | 2,480 FT | $2.01 | $1.37 | $1.71 | $2.30 | $1.54 | $2.40 | $2.50 |
| 632E70001 POWER SERVICE, AS PER PLAN | 2 EACH | $2,206 | $2,196 | $3,190 | $2,600 | $2,440 | $2,762 | $4,700 |
| 632E80981 COMBINATION SIGNAL SUPPORT, TYPE TC-81.21, DESIGN | 1 EACH | $9,703 | $10,738 | $11,660 | $11,500 | $12,078 | $11,232 | $13,250 |
| 632E81071 COMBINATION SIGNAL SUPPORT, TYPE TC-81.21, DESIGN | 4 EACH | $15,300 | $14,761 | $17,270 | $15,500 | $16,603 | $15,900 | $19,800 |
| 632E81081 COMBINATION SIGNAL SUPPORT, TYPE TC-81.21, DESIGN | 1 EACH | $16,808 | $17,925 | $17,930 | $18,500 | $20,162 | $19,032 | $22,500 |
| 632E81091 COMBINATION SIGNAL SUPPORT, TYPE TC-81.21, DESIGN | 2 EACH | $20,543 | $19,420 | $21,340 | $19,500 | $21,843 | $20,922 | $26,500 |
| 632E89601 PEDESTAL, 8', AS PER PLAN | 8 EACH | $2,442 | $2,128 | $2,750 | $2,600 | $2,394 | $2,525 | $2,800 |
| 632E90101 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, AS PER PLA | 2 EACH | $5,380 | $2,776 | $3,080 | $2,100 | $3,122 | $3,200 | $4,000 |
| 632E90400 SIGNALIZATION, MISC.:TEST HOLE PERFORMED | 8 EACH | $617 | $182 | $660 | $530 | $205 | $290 | $1,200 |
| 633E01581 CONTROLLER UNIT, TYPE TS2/A2, WITH CABINET, TYPE T | 2 EACH | $9,880 | $8,376 | $11,550 | $9,000 | $9,421 | $11,552 | $13,500 |
| 633E67101 CABINET FOUNDATION, AS PER PLAN | 2 EACH | $1,603 | $1,428 | $2,750 | $1,550 | $1,606 | $1,902 | $2,600 |
| 633E67201 CONTROLLER WORK PAD, AS PER PLAN | 2 EACH | $344 | $531 | $660 | $370 | $596 | $700 | $700 |
| 633E67301 PREEMPTION, AS PER PLAN | 2 EACH | $1,175 | $711 | $825 | $790 | $800 | $821 | $1,900 |
| 633E67310 PREEMPTION RECEIVING UNIT | 8 EACH | $779 | $665 | $523 | $840 | $748 | $803 | $600 |
| 633E67320 PREEMPTION DETECTOR CABLE | 1,614 FT | $1.79 | $0.97 | $1.65 | $2.00 | $1.09 | $2.00 | $3.00 |
| 633E67350 PREEMPTION PHASE SELECTOR | 2 EACH | $1,791 | $1,866 | $2,750 | $2,100 | $2,099 | $1,908 | $2,550 |
| 633E67401 PREEMPTION CONFIRMATION LIGHT, AS PER PLAN | 8 EACH | $340 | $2,900 | $484 | $370 | $407 | $442 | $400 |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 2 EACH | $6,036 | $5,744 | $5,830 | $6,100 | $6,461 | $6,544 | $6,500 |
| 805E00100 GLOBAL POSITIONING SYSTEM CLOCK ASSEMBLY | 2 EACH | $685 | $657 | $990 | $685 | $739 | $784 | $800 |
| 816E30000 VIDEO DETECTION SYSTEM | 2 EACH | $17,145 | $15,097 | $16,775 | $17,000 | $16,981 | $18,022 | $20,500 |
| 816E30100 TRAINING FOR VIDEO DETECTION SYSTEM | 1 LS | $963 | $897 | $1,650 | $1,500 | $1,008 | $1,121 | $3,500 |
| 512E10001 SEALING OF CONCRETE SURFACES, AS PER PLAN | 126 SY | $40.00 | $20.00 | $12.00 | $50.00 | $41.63 | $32.00 | $78.00 |
| 610E50010 RETAINING WALL, MISC.:MODULAR BLOCK WALL | 1,245 SF | $40.00 | $41.00 | $24.20 | $53.00 | $46.93 | $58.70 | $40.00 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 800 CY | $35.00 | $110 | $45.00 | $75.00 | $70.52 | $54.60 | $84.00 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 113 CY | $70.00 | $60.00 | $45.00 | $100 | $77.48 | $62.40 | $89.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 80 HOUR | $75.00 | $101 | $42.00 | $60.00 | $70.52 | $102 | $62.00 |
| 614E12420 DETOUR SIGNING | 1 LS | $12,000 | $4,800 | $117,380 | $11,000 | $5,208 | $27,642 | $10,500 |
| 614E12460 WORK ZONE MARKING SIGN | 6 EACH | $95.00 | $70.00 | $100 | $100 | $75.95 | $148 | $80.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 125 CY | $225 | $180 | $175 | $175 | $217 | $152 | $210 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 9 SNMT | $950 | $521 | $1,045 | $900 | $1,139 | $1,200 | $1,250 |
| 614E20000 WORK ZONE LANE LINE, CLASS I, 4" | 0.03 MILE | $750 | $1,060 | $880 | $790 | $868 | $12,000 | $1,200 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 2.31 MILE | $875 | $1,325 | $2,750 | $930 | $2,712 | $1,544 | $1,500 |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 3.03 MILE | $650 | $1,175 | $1,210 | $680 | $1,193 | $1,546 | $1,300 |
| 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, 8" | 1,855 FT | $0.50 | $0.55 | $1.38 | $0.50 | $1.36 | $2.00 | $0.75 |
| 614E24000 WORK ZONE DOTTED LINE, CLASS I | 130 FT | $1.00 | $0.50 | $3.30 | $1.00 | $3.25 | $2.00 | $0.55 |
| 614E25000 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS I | 567 FT | $2.00 | $2.25 | $2.48 | $2.00 | $2.44 | $2.00 | $2.50 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 372 FT | $3.00 | $2.50 | $3.85 | $3.00 | $3.80 | $5.00 | $2.80 |
| 614E30000 WORK ZONE ARROW, CLASS I | 29 EACH | $80.00 | $55.00 | $60.50 | $85.00 | $59.67 | $112 | $65.00 |
| 614E40051 BUSINESS ENTRANCE SIGN, AS PER PLAN | 11 EACH | $300 | $100 | $440 | $290 | $759 | $200 | $500 |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $25,000 | $24,360 | $10,000 | $10,000 | $65,526 | $32,998 | $25,500 |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 688 SY | $35.00 | $50.00 | $55.00 | $55.00 | $97.33 | $98.00 | $55.00 |
| 616E10000 WATER | 105 MGAL | $3.00 | $25.00 | $50.00 | $35.00 | $42.64 | $6.00 | $2.00 |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $20,000 | $10,000 | $49,000 | $30,000 | $12,477 | $11,824 | $75,000 |
| 202E23000 PAVEMENT REMOVED | 652 SY | $12.00 | $20.00 | $20.00 | $9.00 | $28.51 | $10.50 | $19.00 |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 5,293 SY | $10.00 | $13.00 | $20.00 | $5.00 | $4.85 | $5.70 | $8.00 |
| 202E30000 WALK REMOVED | 7 SF | $1.00 | $4.50 | $0.50 | $68.00 | $382 | $1.00 | $35.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 825 FT | $11.50 | $18.00 | $22.00 | $22.00 | $32.71 | $8.25 | $25.00 |
| 202E58100 CATCH BASIN REMOVED | 7 EACH | $365 | $200 | $200 | $500 | $390 | $477 | $700 |
| 202E58500 CATCH BASIN ABANDONED | 2 EACH | $830 | $150 | $70.00 | $980 | $483 | $478 | $800 |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT | 47 FT | $8.00 | $11.00 | $20.00 | $42.00 | $101 | $8.20 | $15.00 |
| 203E10000 EXCAVATION | 4,327 CY | $17.00 | $12.00 | $14.00 | $16.00 | $21.08 | $26.40 | $20.00 |
| 203E20000 EMBANKMENT | 1,909 CY | $38.00 | $10.00 | $14.00 | $9.00 | $12.42 | $20.00 | $15.00 |
| 204E10000 SUBGRADE COMPACTION | 7,465 SY | $1.00 | $1.50 | $1.00 | $4.00 | $2.14 | $4.80 | $2.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 1,769 CY | $18.00 | $18.00 | $9.00 | $15.00 | $21.79 | $26.40 | $11.00 |
| 204E30011 GRANULAR MATERIAL, TYPE B, AS PER PLAN | 1,773 CY | $40.00 | $50.00 | $35.00 | $48.00 | $52.19 | $56.80 | $48.00 |
| 204E45000 PROOF ROLLING | 4 HOUR | $140 | $300 | $125 | $200 | $108 | $198 | $250 |
| 204E50000 GEOTEXTILE FABRIC | 5,320 SY | $1.00 | $1.25 | $3.00 | $0.80 | $1.74 | $1.20 | $1.50 |
| 608E10000 4" CONCRETE WALK | 16,003 SF | $4.20 | $5.00 | $5.00 | $5.00 | $5.50 | $7.00 | $4.25 |
| 608E13001 6" CONCRETE WALK, AS PER PLAN | 1,784 SF | $4.25 | $15.00 | $6.00 | $13.00 | $7.00 | $8.00 | $7.00 |
| 608E15001 8" CONCRETE WALK, AS PER PLAN | 4,362 SF | $5.40 | $9.00 | $7.00 | $12.00 | $8.00 | $10.00 | $8.00 |
| 608E52000 CURB RAMP | 441 SF | $12.00 | $9.00 | $12.00 | $12.00 | $14.00 | $14.60 | $16.00 |
| 608E53020 DETECTABLE WARNING | 24 SF | $40.00 | $23.00 | $40.00 | $35.00 | $27.12 | $87.00 | $33.00 |
| 623E38500 MONUMENT ASSEMBLY | 1 EACH | $850 | $630 | $250 | $1,100 | $740 | $850 | $1,150 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 12 EACH | $195 | $195 | $50.00 | $200 | $228 | $218 | $300 |
| 690E50200 SPECIAL - MAILBOX SUPPORT SYSTEM, DOUBLE | 1 EACH | $310 | $300 | $80.00 | $200 | $457 | $334 | $400 |
| 861E10000 GEOGRID FOR SUBGRADE STABILIZATION | 5,320 SY | $1.90 | $1.92 | $4.00 | $1.30 | $2.79 | $2.80 | $2.20 |
| 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1 | 4 SY | $125 | $350 | $100 | $160 | $149 | $118 | $130 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $200 | $88.00 | $250 | $150 | $217 | $218 | $150 |
| 659E00300 TOPSOIL | 569 CY | $40.00 | $21.63 | $20.00 | $45.00 | $38.14 | $12.50 | $65.00 |
| 659E10000 SEEDING AND MULCHING | 5,126 SY | $0.73 | $0.75 | $1.27 | $2.00 | $0.79 | $2.40 | $2.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 256 SY | $1.00 | $0.68 | $1.27 | $0.70 | $1.08 | $1.60 | $0.75 |
| 659E15000 INTER-SEEDING | 256 SY | $0.50 | $0.68 | $1.27 | $0.10 | $1.08 | $1.60 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.72 TON | $750 | $642 | $660 | $680 | $814 | $778 | $800 |
| 659E31000 LIME | 1.06 ACRE | $1.00 | $154 | $440 | $135 | $108 | $672 | $150 |
| 659E35000 WATER | 28 MGAL | $0.50 | $1.00 | $50.00 | $1.30 | $1.09 | $6.00 | $2.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $8,000 | $880 | $4,950 | $1,200 | $12,580 | $5,488 | $18,500 |
| 832E30000 EROSION CONTROL | 35,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E13410 6" UNCLASSIFIED PIPE UNDERDRAINS WITH GEOTEXTILE F | 821 FT | $8.50 | $12.00 | $19.00 | $18.00 | $26.43 | $8.60 | $18.00 |
| 605E14020 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 3,550 FT | $7.75 | $10.00 | $20.00 | $13.00 | $10.78 | $8.60 | $12.00 |
| 611E00100 4" CONDUIT, TYPE B | 311 FT | $10.00 | $15.00 | $18.00 | $18.00 | $40.14 | $12.20 | $13.50 |
| 611E00200 4" CONDUIT, TYPE C | 259 FT | $8.00 | $15.00 | $18.00 | $16.00 | $24.20 | $11.40 | $12.00 |
| 611E00400 4" CONDUIT, TYPE E | 250 FT | $10.00 | $15.00 | $18.00 | $14.00 | $10.08 | $11.40 | $6.00 |
| 611E00406 4" CONDUIT, TYPE F | 250 FT | $5.00 | $15.00 | $18.00 | $14.00 | $10.13 | $11.40 | $6.50 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 340 FT | $15.00 | $22.00 | $20.00 | $28.00 | $30.37 | $13.20 | $18.00 |
| 611E00900 6" CONDUIT, TYPE B | 250 FT | $8.00 | $20.00 | $20.00 | $15.00 | $31.44 | $13.20 | $16.00 |
| 611E01100 6" CONDUIT, TYPE C | 548 FT | $10.00 | $20.00 | $20.00 | $15.00 | $39.85 | $12.80 | $12.00 |
| 611E01400 6" CONDUIT, TYPE E | 250 FT | $5.00 | $20.00 | $20.00 | $14.00 | $11.73 | $12.80 | $12.50 |
| 611E01500 6" CONDUIT, TYPE F | 300 FT | $5.00 | $20.00 | $20.00 | $14.00 | $25.89 | $12.80 | $8.00 |
| 611E03100 10" CONDUIT, TYPE B | 24 FT | $120 | $35.00 | $30.00 | $90.00 | $97.51 | $33.20 | $125 |
| 611E04400 12" CONDUIT, TYPE B | 734 FT | $58.00 | $45.00 | $45.00 | $67.00 | $81.55 | $68.70 | $130 |
| 611E04400 12" CONDUIT, TYPE B, 748.02 | 132 FT | $98.00 | $45.00 | $45.00 | $85.00 | $146 | $72.60 | $165 |
| 611E04600 12" CONDUIT, TYPE C | 352 FT | $48.00 | $36.00 | $45.00 | $31.00 | $81.72 | $68.20 | $25.00 |
| 611E07400 18" CONDUIT, TYPE B | 213 FT | $58.00 | $50.00 | $75.00 | $79.00 | $140 | $87.90 | $120 |
| 611E07400 18" CONDUIT, TYPE B, 748.02 | 32 FT | $120 | $70.00 | $75.00 | $133 | $208 | $90.00 | $200 |
| 611E98150 CATCH BASIN, NO. 3 | 4 EACH | $3,425 | $2,500 | $1,250 | $3,600 | $2,366 | $3,948 | $3,250 |
| 611E98180 CATCH BASIN, NO. 3A | 8 EACH | $2,185 | $1,800 | $1,250 | $3,100 | $2,184 | $2,922 | $2,500 |
| 611E98390 CATCH BASIN, NO. 7 | 8 EACH | $1,875 | $1,400 | $1,300 | $2,150 | $3,253 | $1,468 | $1,400 |
| 611E98470 CATCH BASIN, NO. 2-2B | 3 EACH | $1,220 | $1,000 | $1,300 | $2,110 | $1,908 | $1,977 | $1,700 |
| 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE | 1 EACH | $1,175 | $750 | $1,200 | $1,100 | $985 | $1,179 | $1,400 |
| 611E98635 CATCH BASIN RECONSTRUCTED TO GRADE, AS PER PLAN "A | 10 EACH | $1,425 | $1,400 | $1,500 | $1,500 | $108 | $1,548 | $1,800 |
| 611E98635 CATCH BASIN RECONSTRUCTED TO GRADE, AS PER PLAN "B | 2 EACH | $1,800 | $1,700 | $1,500 | $1,750 | $1,085 | $1,989 | $2,100 |
| 611E99574 MANHOLE, NO. 3 | 3 EACH | $3,550 | $3,000 | $3,500 | $3,600 | $6,878 | $3,969 | $2,950 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 2 EACH | $200 | $250 | $300 | $450 | $316 | $329 | $250 |
| 611E99721 INSPECTION WELL, AS PER PLAN | 3 EACH | $1,285 | $350 | $1,500 | $1,000 | $818 | $360 | $700 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 1,000 LB | $1.50 | $2.50 | $2.00 | $1.20 | $1.36 | $2.40 | $1.30 |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 440 SY | $32.00 | $26.35 | $44.00 | $35.00 | $30.70 | $124 | $28.00 |
| 253E01000 PAVEMENT REPAIR | 440 SY | $62.00 | $72.98 | $99.00 | $95.00 | $85.03 | $138 | $75.00 |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, M | 6,337 SY | $1.40 | $5.42 | $1.10 | $3.00 | $3.44 | $2.80 | $6.00 |
| 407E20000 NON-TRACKING TACK COAT | 1,154 GAL | $3.25 | $3.85 | $2.20 | $3.00 | $4.49 | $4.00 | $4.00 |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 405 CY | $145 | $204 | $165 | $200 | $237 | $177 | $220 |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (405 CY | $155 | $198 | $193 | $180 | $230 | $168 | $215 |
| 441E50400 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | — | $275 | $238 | $330 | $400 | $278 | $398 | $260 |
| 441E50600 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (44 CY | $225 | $228 | $330 | $350 | $266 | $334 | $250 |
| 452E10050 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS | 215 SY | $40.00 | $70.00 | $63.00 | $96.00 | $65.00 | $78.60 | $60.00 |
| 452E12050 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS | 432 SY | $48.00 | $75.00 | $75.00 | $86.00 | $72.00 | $87.80 | $67.00 |
| 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN " | 179 FT | $38.00 | $22.00 | $30.00 | $42.00 | $27.00 | $41.00 | $30.00 |
| 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN " | 65 FT | $45.00 | $22.00 | $3.00 | $52.00 | $35.00 | $70.00 | $50.00 |
| 609E14000 CURB, TYPE 2-A | 526 FT | $18.00 | $27.00 | $5.00 | $14.00 | $8.00 | $24.00 | $6.00 |
| 638E00704 6" WATER MAIN DUCTILE IRON PIPE ANSI CLASS 53, MEC | 50 FT | $182 | $120 | $150 | $64.00 | $123 | $88.70 | $120 |
| 638E04900 1" COPPER SERVICE BRANCH | 300 FT | $40.00 | $25.00 | $50.00 | $86.00 | $66.12 | $54.60 | $65.00 |
| 638E10300 FIRE HYDRANT EXTENDED AND ADJUSTED TO GRADE | 6 EACH | $2,385 | $1,300 | $2,500 | $2,500 | $2,093 | $2,142 | $2,100 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 1 EACH | $450 | $150 | $150 | $400 | $488 | $124 | $350 |
| 638E10901 SERVICE BOX ADJUSTED TO GRADE, AS PER PLAN | 30 EACH | $300 | $80.00 | $100 | $450 | $488 | $98.00 | $250 |
| 611E00100 4" CONDUIT, TYPE B | 100 FT | $25.00 | $60.00 | $200 | $16.00 | $87.23 | $36.40 | $15.00 |
| 611E00200 4" CONDUIT, TYPE C | 100 FT | $10.00 | $50.00 | $200 | $12.00 | $76.12 | $35.70 | $13.00 |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 2 EACH | $950 | $350 | $500 | $870 | $814 | $850 | $2,100 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 250.7 FT | $5.85 | $6.60 | $7.70 | $7.00 | $7.59 | $10.00 | $8.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 167.5 FT | $6.85 | $7.85 | $8.80 | $8.00 | $8.68 | $11.00 | $9.00 |
| 630E08520 STREET NAME SIGN SUPPORT, NO. 3 POST | 47.6 FT | $8.80 | $8.00 | $9.35 | $8.50 | $9.22 | $11.00 | $10.00 |
| 630E08600 SIGN POST REFLECTOR | 9 EACH | $54.00 | $29.70 | $49.50 | $31.00 | $48.82 | $50.00 | $50.00 |
| 630E80100 SIGN, FLAT SHEET | 192.5 SF | $17.50 | $13.10 | $15.40 | $14.00 | $15.19 | $19.75 | $16.00 |
| 630E80510 SIGN, STREET NAME | 8 EACH | $92.80 | $66.00 | $93.50 | $70.00 | $92.22 | $135 | $100 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 17 EACH | $31.40 | $13.60 | $22.00 | $14.00 | $21.70 | $62.00 | $25.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 3 EACH | $60.15 | $83.00 | $82.50 | $88.00 | $81.37 | $76.00 | $85.00 |
| 630E85101 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, AS | 8 EACH | $57.90 | $36.50 | $330 | $39.00 | $325 | $112 | $350 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 19 EACH | $40.30 | $22.60 | $33.00 | $24.00 | $32.55 | $62.00 | $35.00 |
| 630E86011 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT | 4 EACH | $80.45 | $290 | $330 | $300 | $325 | $80.00 | $350 |
| 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL | 2 EACH | $35.35 | $47.00 | $22.00 | $50.00 | $21.70 | $68.00 | $25.00 |
| 642E00190 LANE LINE, 4" | 0.1 MILE | $525 | $2,080 | $660 | $11,200 | $651 | $1,680 | $670 |
| 642E00290 CENTER LINE | 1.07 MILE | $875 | $2,345 | $990 | $930 | $976 | $1,820 | $1,000 |
| 642E00390 CHANNELIZING LINE, 8" | 508 FT | $0.50 | $0.55 | $1.05 | $0.50 | $1.03 | $2.00 | $1.20 |
| 642E00490 STOP LINE | 157 FT | $3.25 | $2.50 | $3.85 | $3.40 | $3.80 | $4.00 | $4.00 |
| 642E00590 CROSSWALK LINE | 383 FT | $2.00 | $2.00 | $2.26 | $2.00 | $2.22 | $4.00 | $2.50 |
| 642E00690 TRANSVERSE/DIAGONAL LINE | 250 FT | $2.25 | $2.25 | $2.75 | $2.30 | $2.71 | $4.00 | $2.80 |
| 642E00990 RAILROAD SYMBOL MARKING | 2 EACH | $225 | $350 | $369 | $240 | $363 | $858 | $380 |
| 642E01290 LANE ARROW | 26 EACH | $85.00 | $55.00 | $60.50 | $90.00 | $59.67 | $160 | $65.00 |
| 644E01350 LANE REDUCTION ARROW | 2 EACH | $155 | $1,030 | $248 | $160 | $244 | $700 | $250 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 400 CY | $40.00 | $110 | $50.00 | $80.00 | $70.52 | $54.60 | $60.00 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 71 CY | $70.00 | $60.00 | $50.00 | $100 | $93.92 | $62.40 | $75.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 80 HOUR | $75.00 | $101 | $42.00 | $60.00 | $70.52 | $102 | $62.00 |
| 614E11300 SPECIAL - WORK ZONE TRAFFIC SIGNAL | 1 EACH | $34,775 | $4,000 | $5,000 | $26,000 | $12,570 | $15,449 | $95,000 |
| 614E12420 DETOUR SIGNING | 1 LS | $12,000 | $2,700 | $14,410 | $10,000 | $2,929 | $17,224 | $45,000 |
| 614E12460 WORK ZONE MARKING SIGN | 6 EACH | $95.00 | $70.00 | $165 | $100 | $75.95 | $148 | $80.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $225 | $180 | $175 | $300 | $217 | $152 | $200 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 10 SNMT | $950 | $400 | $1,045 | $900 | $1,139 | $1,200 | $1,200 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 1.35 MILE | $800 | $1,905 | $2,750 | $850 | $2,712 | $1,544 | $2,150 |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 1.68 MILE | $525 | $1,760 | $1,210 | $550 | $1,193 | $1,546 | $2,000 |
| 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, 8" | 249 FT | $0.50 | $0.55 | $0.94 | $0.50 | $0.92 | $2.00 | $0.75 |
| 614E25000 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS I | 158 FT | $2.00 | $2.25 | $2.75 | $2.00 | $2.71 | $2.00 | $2.50 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 120 FT | $3.00 | $2.50 | $3.85 | $3.00 | $3.80 | $5.00 | $2.80 |
| 614E30000 WORK ZONE ARROW, CLASS I | 4 EACH | $80.00 | $55.00 | $60.50 | $85.00 | $59.67 | $112 | $65.00 |
| 614E32000 WORK ZONE RAILROAD SYMBOL MARKING, CLASS I | 4 EACH | $255 | $350 | $413 | $270 | $407 | $724 | $400 |
| 614E32700 WORK ZONE ISLAND MARKING, CLASS I | 6 SF | $10.00 | $2.00 | $11.00 | $10.00 | $10.85 | $4.00 | $2.50 |
| 614E40051 BUSINESS ENTRANCE SIGN, AS PER PLAN | 4 EACH | $300 | $0.01 | $440 | $280 | $434 | $200 | $200 |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $20,000 | $20,000 | $2,500 | $20,000 | $38,773 | $11,897 | $65,000 |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 1,331 SY | $35.00 | $50.10 | $55.00 | $45.00 | $91.66 | $98.00 | $38.00 |
| 616E10000 WATER | 100 MGAL | $10.00 | $25.00 | $50.00 | $35.00 | $44.78 | $6.00 | $2.00 |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $500 | $2,500 | $17,000 | $2,500 | $542 | $6,599 | $75,000 |
| 202E58000 MANHOLE REMOVED | 5 EACH | $950 | $150 | $1,000 | $600 | $442 | $1,542 | $500 |
| 253E01000 PAVEMENT REPAIR | 1,500 SY | $58.00 | $25.00 | $70.00 | $60.00 | $149 | $117 | $50.00 |
| 659E98700 SEEDING, MISC.: SEEDING AND MULCHING | 1 LS | $3,000 | $1.86 | $1,100 | $2,000 | $39,611 | $17,212 | $15,500 |
| 611E97200 CONDUIT, MISC.: REPAIR EXISTING STORM SEWER | 2 EACH | $1,176 | $1,175 | $2,900 | $1,200 | $2,840 | $450 | $500 |
| 253E90100 PAVEMENT REPAIR, MISC.: ASPHALT DRIVES | 125 SY | $55.00 | $23.00 | $55.00 | $60.00 | $122 | $88.00 | $60.00 |
| 253E90100 PAVEMENT REPAIR, MISC.: CONCRETE DRIVES | 125 SY | $85.00 | $23.00 | $60.00 | $80.00 | $133 | $88.00 | $73.00 |
| 611E97200 CONDUIT, MISC.: 6" SANITARY LATERAL COMPLETE | 20 EACH | $4,500 | $4,800 | $4,000 | $2,600 | $8,862 | $133 | $2,600 |
| 611E97200 CONDUIT, MISC.: 6" SANITARY LATERAL RECONNECTION | 7 EACH | $350 | $1,050 | $2,225 | $1,100 | $9,337 | $3,324 | $300 |
| 611E99690 MANHOLE, MISC.:SANITARY MANHOLE, COMPLETE | 12 EACH | $4,650 | $4,000 | $4,000 | $12,000 | $9,123 | $7,232 | $4,500 |
| 611E99900 DRAINAGE STRUCTURE, MISC.:DROP CONNECTION | 4 EACH | $3,000 | $3,800 | $2,000 | $1,600 | $2,948 | $1,721 | $1,500 |
| 642E50040 PAVEMENT MARKING, MISC.: RESTORATION | 1 LS | $5,000 | $5,200 | $4,180 | $10,000 | $3,580 | $2,124 | $15,500 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $12,000 | $8,000 | $25,000 | $5,000 | $20,939 | $12,522 | $15,500 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $44,000 | $71,000 | $240,800 | $65,000 | $68,000 | $192,568 | $125,000 |
| 108E10000 CPM PROGRESS SCHEDULE | 1 LS | $22,000 | $2,500 | $125,000 | $20,000 | $22,404 | $35,242 | $55,000 |
| 619E16020 FIELD OFFICE, TYPE C | 21 MNTH | $2,500 | $3,300 | $650 | $3,000 | $2,583 | $2,478 | $2,800 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $505,000 | $505k | 6% |
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 2,740 CY | $140 | $384k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $345,000 | $345k | 4% |
| 611E01801 8" CONDUIT, TYPE B, AS PER PLAN | 1,909 FT | $172 | $328k | 4% |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 3,258 CY | $68 | $222k | 3% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 7,067 FT | $26 | $184k | 2% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (1027 CY | $155 | $159k | 2% |
| 204E30011 GRANULAR MATERIAL, TYPE B, AS PER PLAN | 3,911 CY | $40 | $156k | 2% |
| 611E04401 12" CONDUIT, TYPE B, AS PER PLAN | 871 FT | $168 | $146k | 2% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 983 CY | $145 | $143k | 2% |