ATB-US 20-25.92
ATB County · est $0.9M
Bid dateThursday, December 13—
ATB County · est $0.9M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 26 more items below.
| Item | Quantity | R1Koski Construction CO | R2Karvo Companies INC | R3Ronyak Paving INC | R4Burton Scot Contractors LLC | % of bid |
|---|---|---|---|---|---|---|
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (1431 CY | $144 | $168 | $162 | $180 | 24% |
| 424E10001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE A, AS P | 859 CY | $195 | $256 | $260 | $271 | 20% |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 3,267 SY | $25.00 | $25.00 | $25.00 | $25.00 | 10% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 2,500 SY | $26.00 | $17.50 |
| Item | Quantity | R1Koski Construction CO | R2Karvo Companies INC | R3Ronyak Paving INC | R4Burton Scot Contractors LLC |
|---|---|---|---|---|---|
| 202E32000 CURB REMOVED | 107 FT | $20.00 | $25.49 | $9.00 | $15.00 |
| 623E39500 MONUMENT BOX ADJUSTED TO GRADE | 3 EACH | $1,100 | $535 | $525 | $600 |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE | 3 EACH | $1,350 | $1,850 | $1,150 | $1,500 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $38.50 |
| $30.00 |
| 8% |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 3,177 SY | $20.00 | $20.00 | $20.00 | $20.00 | 8% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T = 2") | 41,190 SY | $1.00 | $1.15 | $1.30 | $1.60 | 5% |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 400 SF | $90.00 | $90.00 | $90.00 | $90.00 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $35,000 | $70,000 | $70,000 | $100,000 | 4% |
| 608E52000 CURB RAMP | 1,144 SF | $25.00 | $16.70 | $14.00 | $25.00 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $40,000 | $40,000 | $40,000 | 2% |
| 407E20000 NON-TRACKING TACK COAT | 5,768 GAL | $3.00 | $2.70 | $2.25 | $2.00 | 2% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 200 HOUR | $65.00 | $65.00 | $60.00 | $65.00 | 2% |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 30 EACH | $400 | $1,250 | $650 | $950 | 1% |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 9 EACH | $1,100 | $1,460 | $625 | $1,800 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $9,750 | $5,000 | $8,000 | $10,000 | 1% |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $1,500 | $2,000 | $1,500 | $1,400 | 1% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $8,500 | $3,000 | $15,000 | $2,800 | 1% |
| 644E00300 CENTER LINE | 1.57 MILE | $5,000 | $4,550 | $4,800 | $4,550 | 1% |
| 202E30000 WALK REMOVED | 1,144 SF | $6.00 | $8.60 | $2.00 | $4.50 | 1% |
| 614E20010 WORK ZONE LANE LINE, CLASS I, 6" | 5.96 MILE | $850 | $850 | $600 | $850 | 1% |
| 3 EACH |
| $100 |
| $535 |
| $500 |
| $850 |
| 644E00104 EDGE LINE, 6" | 0.16 MILE | $4,500 | $4,500 | $3,800 | $4,500 |
| 644E00204 LANE LINE, 6" | 2.98 MILE | $1,650 | $1,625 | $1,500 | $1,625 |
| 644E00400 CHANNELIZING LINE, 8" | 125 FT | $2.00 | $1.50 | $0.95 | $1.50 |
| 644E00500 STOP LINE | 48 FT | $12.50 | $12.50 | $6.00 | $12.50 |
| 644E01300 LANE ARROW | 2 EACH | $150 | $125 | $125 | $125 |
| 614E12460 WORK ZONE MARKING SIGN | 20 EACH | $100 | $88.00 | $88.00 | $88.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 20 CY | $200 | $200 | $141 | $200 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 2.98 MILE | $700 | $700 | $600 | $700 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 3.14 MILE | $1,150 | $1,150 | $900 | $1,150 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 1.57 MILE | $825 | $825 | $900 | $825 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 0.16 MILE | $700 | $700 | $700 | $700 |
| 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, 8" | 125 FT | $1.00 | $1.00 | $0.85 | $1.00 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 125 FT | $1.00 | $1.00 | $0.85 | $1.00 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 96 FT | $4.00 | $3.75 | $3.00 | $3.75 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 48 FT | $4.00 | $3.48 | $3.00 | $3.48 |
| 512E10001 SEALING OF CONCRETE SURFACES, AS PER PLAN (PERMANE | 200 SY | $20.00 | $20.00 | $20.00 | $20.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 15 FT | $25.00 | $25.00 | $25.00 | $25.00 |
| 630E80100 SIGN, FLAT SHEET | 2 SF | $25.00 | $25.00 | $25.00 | $25.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 2 EACH | $25.00 | $25.00 | $25.00 | $25.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $25.00 | $25.00 | $25.00 | $25.00 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,500 | $1,500 | $1,000 | $3,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (1431 CY | $144 | $206k | 23% |
| 424E10001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE A, AS P | 859 CY | $195.25 | $168k | 19% |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 3,267 SY | $25 | $82k | 9% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 2,500 SY | $26 | $65k | 7% |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 3,177 SY | $20 | $64k | 7% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T = 2") | 41,190 SY | $1 | $41k | 5% |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 400 SF | $90 | $36k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $35,000 | $35k | 4% |
| 608E52000 CURB RAMP | 1,144 SF | $25 | $29k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20k | 2% |