MER-US 127-22.89
MER County · est $0.3M
Bid dateThursday, December 13—
MER County · est $0.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 10 more items below.
| Item | Quantity | R1Eagle Bridge CO | R2Bridge Specialists INC | R3Complete General Construction Company | R4Ohio Concrete Paving LLC | R5Great Lakes Construction CO | R6Dot Construction CORP | % of bid |
|---|---|---|---|---|---|---|---|---|
| 848E20001 SURFACE PREPARATION USING HYDRODEMOLITION, AS PER | 799 SY | $65.00 | $44.85 | $84.00 | $52.00 | $94.00 | $90.00 | 24% |
| 848E10201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 799 SY | $60.00 | $39.00 | $68.00 | $55.00 | $80.00 | $90.00 | 22% |
| 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING | 338 FT | $81.69 | $106 | $81.50 |
| Item | Quantity | R1Eagle Bridge CO | R2Bridge Specialists INC | R3Complete General Construction Company | R4Ohio Concrete Paving LLC | R5Great Lakes Construction CO | R6Dot Construction CORP |
|---|---|---|---|---|---|---|---|
| 659E00300 TOPSOIL | 19 CY | $5.00 | $40.00 | $40.00 | $75.00 | $50.00 | $100 |
| 659E14000 REPAIR SEEDING AND MULCHING | 8 SY | $2.00 | $3.15 | $1.00 | $15.00 | $1.00 | $3.15 |
| 659E15000 INTER-SEEDING | 8 SY | $2.00 | $0.25 | $0.50 | $15.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $84.00 |
| $81.50 |
| $81.50 |
| 13% |
| 516E10501 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC C | 92 FT | $205 | $270 | $240 | $510 | $265 | $100 | 9% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $12,500 | $11,950 | $11,000 | $15,000 | $11,000 | $20,000 | 6% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $22,101 | $10,000 | $10,000 | $20,000 | $23,200 | 5% |
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 26 CY | $351 | $435 | $500 | $600 | $500 | $500 | 4% |
| 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE | 34 CY | $200 | $200 | $175 | $300 | $180 | $200 | 3% |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 412 FT | $15.00 | $13.00 | $15.00 | $16.00 | $10.00 | $15.00 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,250 | $6,500 | $3,000 | $2,500 | $4,700 | $4,000 | 2% |
| 848E50000 HAND CHIPPING | 67 SY | $60.00 | $75.00 | $50.00 | $110 | $175 | $110 | 2% |
| 646E10010 EDGE LINE, 6" | 0.11 MILE | $33,422 | $33,345 | $27,400 | $35,000 | $27,400 | $12,000 | 2% |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 65 SY | $50.00 | $65.00 | $50.00 | $35.00 | $50.00 | $40.00 | 1% |
| 202E23500 WEARING COURSE REMOVED (ASPHALT), 0.75" | 334 SY | $7.00 | $10.00 | $4.00 | $15.00 | $8.00 | $4.00 | 1% |
| 646E10200 CENTER LINE | 0.06 MILE | $33,858 | $33,780 | $54,800 | $35,000 | $54,800 | $24,000 | 1% |
| 202E23500 WEARING COURSE REMOVED (CONCRETE), 0.75" | 245 SY | $7.00 | $10.00 | $10.00 | $18.00 | $8.00 | $10.00 | 1% |
| 659E10000 SEEDING AND MULCHING | 167 SY | $9.00 | $11.00 | $7.00 | $6.00 | $7.00 | $12.50 | 1% |
| 848E50100 TEST SLAB | 1 LS | $1,500 | $1,000 | $1,200 | $1,500 | $500 | $1,500 | 1% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,000 | $1,600 | $2,500 | $3,500 | $500 | $5,000 | 0% |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 0% |
| $0.50 |
| $0.25 |
| 659E20000 COMMERCIAL FERTILIZER | 0.04 TON | $1,250 | $620 | $450 | $800 | $450 | $620 |
| 659E31000 LIME | 0.03 ACRE | $10.00 | $150 | $100 | $200 | $100 | $150 |
| 659E35000 WATER | 1 MGAL | $10.00 | $1.00 | $10.00 | $15.00 | $10.00 | $1.00 |
| 407E10000 TACK COAT, 702.13 | 50 GAL | $6.26 | $6.00 | $1.00 | $3.00 | $1.00 | $1.00 |
| 617E10100 COMPACTED AGGREGATE | 2 CY | $350 | $195 | $200 | $150 | $200 | $200 |
| 617E20000 SHOULDER PREPARATION | 23 SY | $15.00 | $100 | $26.00 | $65.00 | $25.00 | $50.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 4 EACH | $20.00 | $20.00 | $40.00 | $50.00 | $15.00 | $100 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 848E20001 SURFACE PREPARATION USING HYDRODEMOLITION, AS PER | 799 SY | $65 | $52k | 24% |
| 848E10201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 799 SY | $60 | $48k | 22% |
| 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING | 338 FT | $81.69 | $28k | 13% |
| 516E10501 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC C | 92 FT | $205 | $19k | 9% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $12,500 | $13k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10k | 5% |
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 26 CY | $350.81 | $9k | 4% |
| 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE | 34 CY | $200 | $7k | 3% |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 412 FT | $15 | $6k | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,250 | $4k | 2% |