Figure 0.1 · BRIEFING BID #181000 · ODOT RESULT · awarded Jan 11 ALL-PM FY18 ALL County · est $1.8M
Bid date Thursday, January 11 —
Project scope Bid form · ODOT
29 ITEMS Pavement Marking 66% Maintaining Traffic 14% Mobilization & General 7% Erosion & Landscaping 3% Other 10% Top items by winning bid Item Qty Unit price Extended % 643E00104 EDGE LINE, 6" 1,289 MILE $799 $1.03M 59%
Item Quantity R1 Aero-mark INC R2 Oglesby Construction INC % of bid 643E00104 EDGE LINE, 6" 1,289 MILE $799 $781 60% 643E00300 CENTER LINE 450.1 MILE $520 $532 14% 646E10111 LANE LINE, 6", AS PER PLAN 59 MILE $1,275 $1,731 4% 642E00104 EDGE LINE, 6", TYPE 1 200 MILE $372 $390 4% 643E00204 LANE LINE, 6" 120.6 MILE $327 $306 2% 614E11000 MAINTAINING TRAFFIC 1 LS $34,000 $38,255 2% 643E00105 EDGE LINE, 6", AS PER PLAN 41.8 MILE $799 $781 2% 642E50000 PAVEMENT MARKING, MISC.:LANE LINE, 9" (BLACK PAINT 59 MILE $425 $943 1% 643E00500 STOP LINE 6,000 FT $3.72 $4.00 1% 643E00600 CROSSWALK LINE 9,000 FT $2.47 $2.35 1% 643E00404 CHANNELIZING LINE, 12" 35,000 FT $0.63 $0.59 1% 643E01300 LANE ARROW 400 EACH $55.00 $65.00 1% 642E00300 CENTER LINE, TYPE 1 100 MILE $188 $200 1% 643E00700 TRANSVERSE/DIAGONAL LINE 6,000 FT $2.47 $2.45 1% 643E00400 CHANNELIZING LINE, 8" 25,000 FT $0.53 $0.52 1% 624E10000 MOBILIZATION 1 LS $12,000 $8,000 1% 643E01510 DOTTED LINE, 6" 20,000 FT $0.58 $0.75 1% 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM 1 LS $8,763 $11,000 1% 690E98000 SPECIAL - FOURTEEN (14) HOUR WORK ORDER 8 EACH $1,000 $300 0% 643E01000 RAILROAD SYMBOL MARKING 25 EACH $303 $250 0%
Show all 29 line items Item Quantity R1 Aero-mark INC R2 Oglesby Construction INC 832E30000 EROSION CONTROL 1,000 EACH $1.00 $1.00 642E00200 LANE LINE, 4", TYPE 1 10 MILE $62.50 $70.00 643E00200 LANE LINE, 4" 8.2 MILE $327 $306 643E01110 SCHOOL SYMBOL MARKING, 96" 15 EACH $303 $250 643E01500 DOTTED LINE, 4" 1,400 FT $1.00 $1.00 647E50000 REMOVAL OF PAVEMENT MARKING 5,000 FT $1.00 $1.20 647E50010 REMOVAL OF PAVEMENT MARKING 200 EACH $10.00
Project details
Description ALL-PM FY18
Type of work Pavement How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →