Figure 0.1 · BRIEFING BID #181025 · ODOT RESULT · awarded Mar 22 D03-PM FY2018 D03 County · est $1.5M
Bid date Thursday, March 22 —
Project scope Bid form · ODOT
46 ITEMS Pavement Marking 67% Maintaining Traffic 13% Mobilization & General 4% Other 15% Top items by winning bid Item Qty Unit price Extended % 642E00104 EDGE LINE, 6", TYPE 1 672.52 MILE $560 $377k 26% 643E00104 EDGE LINE, 6" 417.76 MILE $849 $355k 24% 643E00300
Item Quantity R1 Oglesby Construction INC R2 Aero-mark INC % of bid 642E00104 EDGE LINE, 6", TYPE 1 672.52 MILE $560 $580 26% 643E00104 EDGE LINE, 6" 417.76 MILE $849 $860 25% 643E00300 CENTER LINE 296.91 MILE $680 $727 14% 642E00300 CENTER LINE, TYPE 1 217.55 MILE $480 $500 7% 644E00104 EDGE LINE, 6" 34.07 MILE $2,850 $2,702 7% 643E00700 TRANSVERSE/DIAGONAL LINE 33,099 FT $2.05 $2.25 5% 644E00204 LANE LINE, 6" 26.56 MILE $1,500 $1,203 3% 644E00300 CENTER LINE 5.25 MILE $5,000 $3,900 2% 642E00204 LANE LINE, 6", TYPE 1 90.37 MILE $260 $300 2% 643E00500 STOP LINE 6,301 FT $3.65 $3.42 2% 643E00404 CHANNELIZING LINE, 12" 35,634 FT $0.60 $0.57 1% 644E00700 TRANSVERSE/DIAGONAL LINE 3,869 FT $5.25 $4.00 1% 644E00404 CHANNELIZING LINE, 12" 5,253 FT $2.30 $1.20 1% 643E01300 LANE ARROW 164 EACH $70.00 $67.50 1% 644E01300 LANE ARROW 100 EACH $105 $75.00 1% 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM 1 LS $10,000 $7,500 1% 643E00204 LANE LINE, 6" 19.4 MILE $425 $430 1% 643E01000 RAILROAD SYMBOL MARKING 26 EACH $250 $250 0% 642E00500 STOP LINE, TYPE 1 2,000 FT $2.50 $3.50 0% 614E11000 MAINTAINING TRAFFIC 1 LS $4,895 $1,792 0%
Show all 46 line items Item Quantity R1 Oglesby Construction INC R2 Aero-mark INC 642E00390 CHANNELIZING LINE, 8" 2,000 FT $0.40 $1.00 642E00600 CROSSWALK LINE, TYPE 1 1,000 FT $1.50 $2.00 642E00700 TRANSVERSE/DIAGONAL LINE, TYPE 1 2,500 FT $1.50 $2.00 642E01110 SCHOOL SYMBOL MARKING, 96", TYPE 1 4 EACH $175 $247 642E01300 LANE ARROW, TYPE 1 40 EACH $75.00 $40.00 642E01510 DOTTED LINE, 6", TYPE 1 5,000 FT $0.45 $0.73 642E30000 REMOVAL OF PAVEMENT MARKING 200 FT $2.50
Project details
Description D03-PM FY2018
Type of work Pavement How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →