BEL-SR 149-16.52
BEL County · est $0.2M
Bid dateThursday, November 8—
BEL County · est $0.2M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 30 more items below.
| Item | Quantity | R1Bog Construction INC | R2Eclipse CO LLC | R3Alan Stone CO INC | % of bid |
|---|---|---|---|---|---|
| 611E13200 30" CONDUIT, TYPE A 706.02, 707.01 ALUMINIZED, 707 | 100 FT | $425 | $154 | $237 | 19% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 186 CY | $175 | $235 | $216 | 15% |
| 203E20000 EMBANKMENT | 1,679 CY | $15.00 | $26.00 | $30.00 | 11% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 30 CY | $500 | $300 | $275 | 7% |
| 624E10000 MOBILIZATION | 1 LS | $15,000 | $10,000 | $27,236 | 7% |
| 203E10001 EXCAVATION, AS PER PLAN | 722 CY | $20.00 | $10.00 | $14.00 | 7% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $10,500 | $9,000 |
| Item | Quantity | R1Bog Construction INC | R2Eclipse CO LLC | R3Alan Stone CO INC |
|---|---|---|---|---|
| 202E20010 HEADWALL REMOVED | 1 EACH | $1,000 | $323 | $831 |
| 202E35200 PIPE REMOVED, OVER 24" | 22 FT | $75.00 | $20.00 | $19.00 |
| 202E38000 GUARDRAIL REMOVED | 442 FT | $4.00 | $6.00 | $2.50 |
| 202E75000 FENCE REMOVED | 420 FT | $1.00 | $2.00 | $4.00 |
| 202E98000 REMOVAL MISC.: CONCRETE TROUGH | 1 LS | $2,500 | $715 | $831 |
| 204E10000 SUBGRADE COMPACTION | 199 SY | $5.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $2,500 |
| 5% |
| 642E00300 CENTER LINE, TYPE 1 | 8 MILE | $1,000 | $2,137 | $1,108 | 4% |
| 659E10000 SEEDING AND MULCHING | 1,521 SY | $4.00 | $3.00 | $3.00 | 3% |
| 614E12420 DETOUR SIGNING | 1 LS | $6,000 | $5,150 | $4,293 | 3% |
| 304E20000 AGGREGATE BASE | 66 CY | $90.00 | $85.00 | $91.00 | 3% |
| 202E23000 PAVEMENT REMOVED | 174 SY | $32.00 | $40.00 | $24.00 | 3% |
| 659E00300 TOPSOIL | 169 CY | $30.00 | $47.00 | $48.00 | 2% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 40 CY | $125 | $125 | $231 | 2% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (8 CY | $600 | $440 | $405 | 2% |
| 646E10010 EDGE LINE, 6" | 0.03 MILE | $155,000 | $133,550 | $129,540 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $4,000 | $13,000 | $4,153 | 2% |
| 602E20000 CONCRETE MASONRY | 1.2 CY | $3,000 | $2,070 | $2,193 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $3,500 | $10,500 | $2,937 | 2% |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 68 FT | $50.00 | $25.00 | $25.00 | 2% |
| $3.00 |
| $2.50 |
| 204E13000 EXCAVATION OF SUBGRADE | 84 CY | $5.00 | $17.00 | $29.00 |
| 204E30020 GRANULAR MATERIAL, TYPE C | 67 CY | $40.00 | $92.00 | $97.00 |
| 204E45000 PROOF ROLLING | 3 HOUR | $10.00 | $230 | $170 |
| 204E50000 GEOTEXTILE FABRIC | 200 SY | $4.00 | $1.50 | $2.50 |
| 861E10000 GEOGRID FOR SUBGRADE STABILIZATION | 200 SY | $7.00 | $2.00 | $4.00 |
| 601E32110 ROCK CHANNEL PROTECTION, TYPE B WITH AGGREGATE FIL | 3 CY | $500 | $123 | $362 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $50.00 | $160 | $100 |
| 659E14000 REPAIR SEEDING AND MULCHING | 76 SY | $1.00 | $0.50 | $0.50 |
| 659E15000 INTER-SEEDING | 76 SY | $1.00 | $0.50 | $0.50 |
| 659E20000 COMMERCIAL FERTILIZER | 0.22 TON | $1,000 | $1,000 | $588 |
| 659E31000 LIME | 0.31 ACRE | $200 | $600 | $105 |
| 659E35000 WATER | 9 MGAL | $1.00 | $10.00 | $1.50 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 32 FT | $25.00 | $14.00 | $52.00 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 42 FT | $10.00 | $10.00 | $32.00 |
| 407E10000 TACK COAT | 440 GAL | $3.00 | $2.25 | $2.50 |
| 408E10001 PRIME COAT, AS PER PLAN | 62 GAL | $25.00 | $20.00 | $19.00 |
| 621E00100 RPM | 3 EACH | $850 | $1,480 | $893 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 3 EACH | $200 | $12.00 | $11.00 |
| 646E10200 CENTER LINE | 0.02 MILE | $155,000 | $134,100 | $130,085 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 2 SNMT | $1,200 | $1,060 | $1,103 |
| 616E10000 WATER | 10 MGAL | $1.00 | $1.00 | $21.00 |
| 619E16000 FIELD OFFICE, TYPE A | 4 MNTH | $500 | $550 | $906 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,000 | $8,670 | $4,724 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E13200 30" CONDUIT, TYPE A 706.02, 707.01 ALUMINIZED, 707 | 100 FT | $425 | $43k | 17% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 186 CY | $175 | $33k | 13% |
| 203E20000 EMBANKMENT | 1,679 CY | $15 | $25k | 10% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 30 CY | $500 | $15k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $15,000 | $15k | 6% |
| 203E10001 EXCAVATION, AS PER PLAN | 722 CY | $20 | $14k | 6% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $10,500 | $11k | 4% |
| 642E00300 CENTER LINE, TYPE 1 | 8 MILE | $1,000 | $8k | 3% |
| 659E10000 SEEDING AND MULCHING | 1,521 SY | $4 | $6k | 2% |
| 614E12420 DETOUR SIGNING | 1 LS | $6,000 | $6k | 2% |