ROS-CR 213-00.04 Brdg Replace
ROS County · est $1.5M
Bid dateThursday, November 8—
ROS County · est $1.5M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 42 more items below.
| Item | Quantity | R1Righter Company INC | R2Eclipse CO LLC | % of bid |
|---|---|---|---|---|
| 513E10121 STRUCTURAL STEEL MEMBERS, LEVEL 6, AS PER PLAN | 1 LS | $880,100 | $1,071,694 | 57% |
| 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING | 249 CY | $500 | $771 | 8% |
| 507E00200 STEEL PILES HP12X53, FURNISHED | 1,920 FT | $40.00 | $31.00 | 5% |
| 202E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN | 1 LS | $75,000 | $148,095 | 5% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $60,000 | $12,935 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $100,000 | 3% |
| 516E12201 STRUCTURAL STEEL EXPANSION JOINT, AS PER PLAN | 48 FT | $650 | $348 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $30,000 | $34,859 | 2% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 25,592 LB | $1.00 | $3.00 | 2% |
| 203E20000 EMBANKMENT | 1,239 CY | $20.00 | $15.50 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $24,000 | $49,000 | 2% |
| 526E15000 REINFORCED CONCRETE APPROACH SLABS (T=13") | 107 SY | $200 | $497 | 1% |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $20,000 | $36,400 | 1% |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 1,999 SY | $10.00 | $14.50 | 1% |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 271 CY | $65.00 | $87.00 | 1% |
| 507E00250 STEEL PILES HP12X53, DRIVEN | 1,760 FT | $10.00 | $33.50 | 1% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 92 CY | $190 | $250 | 1% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 67 CY | $200 | $338 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $10,000 | $25,989 | 1% |
| 619E16000 FIELD OFFICE, TYPE A | 9 MNTH | $1,000 | $1,100 | 1% |
| Item | Quantity | R1Righter Company INC | R2Eclipse CO LLC |
|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 21 SY | $35.00 | $26.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 87 FT | $10.00 | $14.50 |
| 202E38000 GUARDRAIL REMOVED | 281 FT | $4.00 | $6.00 |
| 202E53100 MAILBOX REMOVED | 1 EACH | $50.00 | $58.00 |
| 203E10000 EXCAVATION | 85 CY | $15.00 | $21.00 |
| 204E10000 SUBGRADE COMPACTION | 1,060 SY | $3.00 | $2.00 |
| 204E45000 PROOF ROLLING | 1 HOUR | $150 | $221 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 606E15050 GUARDRAIL, TYPE MGS | 200 FT | $17.90 | $24.50 |
| 606E25550 ANCHOR ASSEMBLY, MGS TYPE A | 2 EACH | $1,115 | $1,431 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 2 EACH | $725 | $1,046 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $1,965 | $2,324 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 1 EACH | $110 | $239 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 12 CY | $65.00 | $130 |
| 659E10000 SEEDING AND MULCHING | 1,388 SY | $2.25 | $3.50 |
| 659E14000 REPAIR SEEDING AND MULCHING | 70 SY | $2.00 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.33 TON | $610 | $464 |
| 659E31000 LIME | 0.29 ACRE | $80.00 | $122 |
| 659E35000 WATER | 12 MGAL | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 87 FT | $10.00 | $15.50 |
| 611E00900 6" CONDUIT, TYPE B | 50 FT | $6.00 | $35.50 |
| 611E01400 6" CONDUIT, TYPE E | 50 FT | $6.00 | $28.50 |
| 611E01500 6" CONDUIT, TYPE F | 50 FT | $6.00 | $28.50 |
| 611E06400 15" CONDUIT, TYPE D | 200 FT | $40.00 | $49.50 |
| 304E20000 AGGREGATE BASE | 84 CY | $75.00 | $70.50 |
| 407E10000 TACK COAT | 44 GAL | $2.50 | $5.00 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 36 CY | $100 | $73.00 |
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1 | 21 SY | $125 | $98.50 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, (BIDIRECTIONAL) | 8 EACH | $10.00 | $8.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 3 EACH | $15.00 | $60.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 3 EACH | $15.00 | $60.00 |
| 642E00290 CENTER LINE | 0.11 MILE | $16,145 | $18,143 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 75 CY | $60.00 | $65.50 |
| 614E12420 DETOUR SIGNING | 1 LS | $6,895 | $8,331 |
| 616E10000 WATER | 1 MGAL | $10.00 | $136 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $1,000 | $4,680 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 152 SY | $23.00 | $40.50 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 79 CY | $100 | $78.50 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 106 FT | $15.00 | $6.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 80 FT | $20.00 | $16.50 |
| 526E90010 TYPE A INSTALLATION | 48 FT | $150 | $668 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $5,000 | $7,484 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 513E10121 STRUCTURAL STEEL MEMBERS, LEVEL 6, AS PER PLAN | 1 LS | $880,100 | $880k | 54% |
| 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING | 249 CY | $500 | $125k | 8% |
| 507E00200 STEEL PILES HP12X53, FURNISHED | 1,920 FT | $40 | $77k | 5% |
| 202E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN | 1 LS | $75,000 | $75k | 5% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $60,000 | $60k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 2% |
| 516E12201 STRUCTURAL STEEL EXPANSION JOINT, AS PER PLAN | 48 FT | $650 | $31k | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $30,000 | $30k | 2% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 25,592 LB | $1 | $26k | 2% |
| 203E20000 EMBANKMENT | 1,239 CY | $20 | $25k | 2% |