VAN-SR 81-13.65
VAN County · est $0.7M
Bid dateThursday, July 12—
VAN County · est $0.7M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 58 more items below.
| Item | Quantity | R1Jutte Excavating INC | R2Vtf Excavation LLC | R3Miller Contracting Group INC | % of bid |
|---|---|---|---|---|---|
| 203E10000 EXCAVATION | 9,638 CY | $11.00 | $11.20 | $13.50 | 21% |
| 611E53000 38" X 60" CONDUIT, TYPE A, 706.04 | 140 FT | $370 | $279 | $215 | 10% |
| 304E20000 AGGREGATE BASE | 537 CY | $65.00 | $46.67 | $46.00 | 7% |
| 832E30000 EROSION CONTROL | 30,000 EACH | $1.00 | $1.00 | $1.00 | 6% |
| 624E10000 MOBILIZATION | 1 LS | $30,000 | $14,520 | $20,746 |
| Item | Quantity | R1Jutte Excavating INC | R2Vtf Excavation LLC | R3Miller Contracting Group INC |
|---|---|---|---|---|
| 202E35100 PIPE REMOVED, 24" AND UNDER | 1,574 FT | $5.00 | $8.93 | $5.00 |
| 202E35200 PIPE REMOVED, OVER 24" | 208 FT | $10.00 | $22.50 | $15.00 |
| 202E58100 CATCH BASIN REMOVED | 9 EACH | $200 | $253 | $300 |
| 202E98100 REMOVAL MISC.: CLEANOUT REMOVED | 1 EACH | $150 | $142 | $135 |
| 202E98100 REMOVAL MISC.: CONCRETE APRON REMOVED | 1 EACH | $700 | $717 | $800 |
| 204E10000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 6% |
| 611E53100 43" X 68" CONDUIT, TYPE A, 706.04 | 60 FT | $430 | $335 | $310 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $25,000 | $10,388 | $5,000 | 5% |
| 659E00300 TOPSOIL | 453 CY | $50.00 | $15.02 | $15.00 | 5% |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $20,000 | $693 | $7,500 | 4% |
| 611E13600 30" CONDUIT, TYPE C, 706.01, 706.02 OR 707.33 | 288 FT | $60.00 | $73.67 | $66.00 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $16,500 | $4,229 | $9,800 | 3% |
| 611E07600 18" CONDUIT, TYPE C | 410 FT | $40.00 | $42.11 | $35.00 | 3% |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT | 3,180 FT | $5.00 | $10.10 | $11.75 | 3% |
| 203E20000 EMBANKMENT | 1,434 CY | $11.00 | $7.12 | $12.50 | 3% |
| 613E41200 LOW STRENGTH MORTAR BACKFILL | 133 CY | $110 | $113 | $115 | 3% |
| 659E10000 SEEDING AND MULCHING | 30,494 SY | $0.46 | $1.19 | $1.50 | 3% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 61 CY | $217 | $360 | $320 | 3% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $12,500 | $10,661 | $13,000 | 2% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 38 CY | $269 | $372 | $315 | 2% |
| 611E16900 36" CONDUIT, TYPE D, 706.02 | 48 FT | $200 | $135 | $99.00 | 2% |
| 1,044 SY |
| $1.00 |
| $0.75 |
| $0.80 |
| 690E50000 SPECIAL - MAILBOX SUPPORT | 1 EACH | $200 | $75.77 | $400 |
| 690E50350 SPECIAL - MAILBOX REMOVED AND RESET | 1 EACH | $200 | $763 | $350 |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 6 CY | $60.00 | $67.69 | $100 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 146 CY | $65.00 | $71.47 | $63.00 |
| 659E20000 COMMERCIAL FERTILIZER | 4.12 TON | $300 | $708 | $650 |
| 659E35000 WATER | 165 MGAL | $0.10 | $1.20 | $5.00 |
| 670E00500 SLOPE EROSION PROTECTION | 4,000 SY | $2.00 | $2.22 | $2.12 |
| 670E00700 DITCH EROSION PROTECTION | 84 SY | $2.00 | $2.22 | $2.12 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $4,500 | $13,110 | $2,000 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $2,500 | $2,520 | $15,500 |
| 836E10000 SEEDING AND EROSION CONTROL WITH TURF REINFORCING | 179 SY | $7.00 | $4.80 | $21.00 |
| 602E20000 CONCRETE MASONRY | 14 CY | $600 | $1,284 | $950 |
| 605E31100 AGGREGATE DRAINS | 74 FT | $10.00 | $6.76 | $16.50 |
| 611E00200 4" CONDUIT, TYPE C | 5 FT | $15.00 | $16.08 | $25.00 |
| 611E01500 6" CONDUIT, TYPE F | 56 FT | $18.00 | $13.09 | $20.00 |
| 611E01800 8" CONDUIT, TYPE B | 20 FT | $18.00 | $8.83 | $30.00 |
| 611E02000 8" CONDUIT, TYPE C | 65 FT | $18.00 | $14.98 | $25.00 |
| 611E02600 8" CONDUIT, TYPE F | 10 FT | $18.00 | $14.93 | $30.00 |
| 611E03300 10" CONDUIT, TYPE C | 25 FT | $20.00 | $18.77 | $40.00 |
| 611E03600 10" CONDUIT, TYPE E | 50 FT | $20.00 | $7.74 | $31.00 |
| 611E03700 10" CONDUIT, TYPE F | 86 FT | $20.00 | $17.79 | $31.00 |
| 611E04400 12" CONDUIT, TYPE B | 65 FT | $40.00 | $46.49 | $46.00 |
| 611E04600 12" CONDUIT, TYPE C | 141 FT | $30.00 | $40.35 | $32.00 |
| 611E05900 15" CONDUIT, TYPE B | 50 FT | $45.00 | $54.38 | $46.00 |
| 611E06100 15" CONDUIT, TYPE C | 40 FT | $40.00 | $37.02 | $35.00 |
| 611E08200 18" CONDUIT, TYPE F | 20 FT | $40.00 | $41.32 | $33.00 |
| 611E10400 24" CONDUIT, TYPE B | 60 FT | $60.00 | $60.63 | $61.00 |
| 611E11900 27" CONDUIT, TYPE B | 60 FT | $65.00 | $87.43 | $95.00 |
| 611E13600 30" CONDUIT, TYPE C, 706.01, 706.02 OR 707.33 (HDP | 116 FT | $60.00 | $73.97 | $70.00 |
| 611E98410 CATCH BASIN, NO. 8 | 1 EACH | $2,000 | $2,807 | $3,800 |
| 611E98430 CATCH BASIN, NO. 8 WITHOUT APRON | 1 EACH | $2,000 | $1,997 | $2,800 |
| 611E98470 CATCH BASIN, NO. 2-2B | 4 EACH | $1,200 | $1,214 | $1,000 |
| 611E98510 CATCH BASIN, NO. 2-3 | 2 EACH | $1,400 | $1,454 | $1,600 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, VARIABLE DEPTH | 133 SY | $22.50 | $36.00 | $30.00 |
| 407E10000 TACK COAT | 53 GAL | $4.00 | $3.60 | $3.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 23 FT | $18.00 | $36.00 | $12.00 |
| 630E08520 STREET NAME SIGN SUPPORT, NO. 3 POST | 13 FT | $18.00 | $36.00 | $13.00 |
| 630E08600 SIGN POST REFLECTOR | 2 EACH | $100 | $60.00 | $43.00 |
| 630E80100 SIGN, FLAT SHEET | 12.6 SF | $50.00 | $60.00 | $22.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 2 EACH | $15.00 | $60.00 | $16.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $75.00 | $120 | $100 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 3 EACH | $15.00 | $60.00 | $16.00 |
| 642E00094 EDGE LINE, 6" | 0.06 MILE | $15,000 | $18,000 | $44,000 |
| 642E00290 CENTER LINE | 0.03 MILE | $30,000 | $24,000 | $44,000 |
| 253E02000 PAVEMENT REPAIR | 20 CY | $80.00 | $414 | $250 |
| 407E10000 TACK COAT | 20 GAL | $4.00 | $3.00 | $3.00 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 10 CY | $269 | $310 | $310 |
| 614E21400 WORK ZONE CENTER LINE, CLASS II | 0.03 MILE | $40,000 | $30,000 | $22,000 |
| 616E10000 WATER | 44 MGAL | $0.10 | $5.00 | $5.00 |
| 617E10100 COMPACTED AGGREGATE | 50 CY | $30.00 | $41.12 | $43.00 |
| 619E16010 FIELD OFFICE, TYPE B | 5 MNTH | $1,200 | $1,600 | $1,100 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $7,000 | $20,130 | $7,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 203E10000 EXCAVATION | 9,638 CY | $11 | $106k | 17% |
| 611E53000 38" X 60" CONDUIT, TYPE A, 706.04 | 140 FT | $370 | $52k | 8% |
| 304E20000 AGGREGATE BASE | 537 CY | $65 | $35k | 6% |
| 832E30000 EROSION CONTROL | 30,000 EACH | $1 | $30k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $30,000 | $30k | 5% |
| 611E53100 43" X 68" CONDUIT, TYPE A, 706.04 | 60 FT | $430 | $26k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $25,000 | $25k | 4% |
| 659E00300 TOPSOIL | 453 CY | $50 | $23k | 4% |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $20,000 | $20k | 3% |
| 611E13600 30" CONDUIT, TYPE C, 706.01, 706.02 OR 707.33 | 288 FT | $60 | $17k | 3% |