SAN-US 20-19.32 Resurfacing
SAN County · est $6.1M
Bid dateThursday, February 13—
SAN County · est $6.1M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 78 more items below.
| Item | Quantity | R1Gerken Paving INC | R2Erie Blacktop INC | R3Kokosing Construction Company INC | R4M & B Asphalt CO INC | % of bid |
|---|---|---|---|---|---|---|
| 442E10101 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 12,901 CY | $133 | $135 | $148 | $143 | 33% |
| 442E10001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 11,085 CY | $143 | $156 | $170 | $162 | 30% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3 1/4" | 264,086 SY | $1.70 | $1.00 | $1.00 | $1.98 | 9% |
| 255E10010 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 1,800 SY | $120 | $130 | $142 |
| Item | Quantity | R1Gerken Paving INC | R2Erie Blacktop INC | R3Kokosing Construction Company INC | R4M & B Asphalt CO INC |
|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,152 | $2,000 | $1,152 | $1,152 |
| 202E11000 STRUCTURE REMOVED | 1 LS | $1,152 | $2,000 | $1,152 | $1,152 |
| 202E20010 HEADWALL REMOVED | 1 EACH | $960 | $1,005 | $960 | $960 |
| 202E23000 PAVEMENT REMOVED | 633 SY | $10.86 | $11.40 | $10.86 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $142 |
| 4% |
| 615E20001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, AS PER | 1,778 SY | $85.00 | $63.00 | $65.00 | $75.00 | 3% |
| 611E53301 53" X 83" CONDUIT, TYPE A, 706.04, AS PER PLAN | 148 FT | $881 | $925 | $881 | $881 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $130,000 | $135,000 | $222,000 | $235,000 | 2% |
| 872E10000 VOID REDUCING ASPHALT MEMBRANE (VRAM) | 58,765 FT | $2.00 | $2.55 | $2.30 | $2.50 | 2% |
| 617E10100 COMPACTED AGGREGATE | 2,285 CY | $49.00 | $39.60 | $30.00 | $55.00 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $105,000 | $200,000 | $200,000 | $200,000 | 2% |
| 606E15050 GUARDRAIL, TYPE MGS | 5,375 FT | $15.80 | $16.60 | $15.80 | $15.90 | 2% |
| 203E20000 EMBANKMENT | 1,213 CY | $61.72 | $52.25 | $49.85 | $50.00 | 1% |
| 407E20000 NON-TRACKING TACK COAT | 36,749 GAL | $2.00 | $2.15 | $2.25 | $2.30 | 1% |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 84 SNMT | $750 | $790 | $450 | $750 | 1% |
| 442E00100 ANTI-SEGREGATION EQUIPMENT | 12,536 CY | $5.00 | $1.00 | $1.00 | $6.50 | 1% |
| 409E30000 SAWING AND SEALING ASPHALT CONCRETE PAVEMENT JOINT | 5,400 FT | $8.80 | $10.00 | $9.60 | $9.00 | 1% |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 69 MILE | $575 | $565 | $500 | $575 | 1% |
| 209E60500 LINEAR GRADING | 23.07 MILE | $1,600 | $1,215 | $2,500 | $1,100 | 1% |
| 202E35200 PIPE REMOVED, OVER 24" | 109 FT | $300 | $310 | $300 | $300 | 1% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 165 CY | $198 | $195 | $180 | $210 | 1% |
| $10.86 |
| 202E23900 CONCRETE BASE REMOVED | 125 SY | $11.70 | $12.30 | $11.70 | $11.70 |
| 202E24000 BRICK BASE REMOVED | 63 SY | $16.43 | $17.25 | $16.43 | $16.43 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 75 FT | $8.64 | $9.10 | $8.64 | $8.64 |
| 202E38000 GUARDRAIL REMOVED | 6,600 FT | $1.60 | $1.65 | $1.60 | $1.60 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 9 EACH | $140 | $147 | $140 | $140 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 10 EACH | $95.00 | $99.75 | $95.00 | $95.00 |
| 202E42050 ANCHOR ASSEMBLY REMOVED, TYPE B | 5 EACH | $120 | $126 | $120 | $120 |
| 202E42206 ANCHOR ASSEMBLY REMOVED | 2 EACH | $100 | $105 | $100 | $100 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 12 EACH | $55.00 | $57.75 | $55.00 | $55.00 |
| 202E47800 IMPACT ATTENUATOR REMOVED | 2 EACH | $195 | $205 | $195 | $195 |
| 203E10000 EXCAVATION | 46 CY | $9.60 | $10.00 | $9.60 | $9.60 |
| 204E10000 SUBGRADE COMPACTION | 810 SY | $2.88 | $3.00 | $2.88 | $2.88 |
| 204E13000 EXCAVATION OF SUBGRADE | 44 CY | $65.00 | $60.00 | $16.00 | $45.00 |
| 204E30020 GRANULAR MATERIAL, TYPE C | 44 CY | $180 | $75.00 | $108 | $115 |
| 209E15000 RESHAPING UNDER GUARDRAIL | 73 STA | $40.00 | $42.00 | $40.00 | $40.00 |
| 601E20010 CRUSHED AGGREGATE SLOPE PROTECTION | 250 CY | $73.50 | $77.00 | $73.50 | $73.50 |
| 606E15550 GUARDRAIL, BARRIER DESIGN, TYPE MGS | 525 FT | $27.20 | $28.55 | $27.20 | $27.20 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E - MASH 2016 | 14 EACH | $2,240 | $2,350 | $2,240 | $2,240 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 10 EACH | $925 | $970 | $925 | $925 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 6 EACH | $1,980 | $2,075 | $1,980 | $1,980 |
| 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 2 EACH | $425 | $445 | $425 | $425 |
| 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4 | 4 EACH | $685 | $715 | $685 | $685 |
| 606E60012 IMPACT ATTENUATOR, TYPE 1 (BIDIRECTIONAL) | 2 EACH | $4,340 | $4,555 | $4,340 | $4,340 |
| 623E39500 MONUMENT BOX ADJUSTED TO GRADE | 1 EACH | $800 | $675 | $900 | $950 |
| 626E00116 BARRIER REFLECTOR, TYPE 5 UNIDIRECTIONAL | 92 EACH | $7.50 | $7.90 | $7.50 | $7.50 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 24 CY | $112 | $118 | $112 | $112 |
| 659E00300 TOPSOIL | 113 CY | $30.60 | $32.00 | $30.60 | $30.60 |
| 659E10000 SEEDING AND MULCHING | 1,018 SY | $2.50 | $2.60 | $2.50 | $3.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.14 TON | $450 | $475 | $450 | $530 |
| 659E35000 WATER | 2.7 MGAL | $10.00 | $10.50 | $10.00 | $10.00 |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $14,430 | $15,150 | $14,430 | $14,430 |
| 602E20000 CONCRETE MASONRY | 3.3 CY | $2,423 | $2,545 | $2,423 | $2,423 |
| 611E04600 12" CONDUIT, TYPE C | 38 FT | $85.55 | $89.00 | $85.55 | $85.55 |
| 611E05200 12" CONDUIT, TYPE F | 32 FT | $85.55 | $89.00 | $85.55 | $85.55 |
| 611E06100 15" CONDUIT, TYPE C | 42 FT | $86.48 | $90.00 | $86.48 | $86.48 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 1 EACH | $1,200 | $800 | $1,000 | $900 |
| 611E99150 INLET ADJUSTED TO GRADE | 1 EACH | $1,200 | $1,265 | $1,250 | $900 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 1 EACH | $950 | $800 | $1,000 | $1,250 |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 8,100 FT | $3.50 | $3.75 | $2.00 | $3.55 |
| 304E20000 AGGREGATE BASE | 113 CY | $96.56 | $100 | $100 | $96.56 |
| 690E98400 SPECIAL - PAVER MOUNTED THERMAL PROFILING | 1 LS | $21,000 | $17,000 | $15,000 | $38,000 |
| 618E40600 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 23 MILE | $552 | $845 | $552 | $650 |
| 621E00100 RPM | 725 EACH | $22.40 | $23.55 | $23.09 | $24.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 725 EACH | $5.00 | $7.00 | $4.00 | $5.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 1 EACH | $25.00 | $26.00 | $25.00 | $25.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 1 EACH | $25.00 | $26.00 | $25.00 | $25.00 |
| 642E00094 EDGE LINE, 6" | 23 MILE | $675 | $685 | $675 | $675 |
| 642E00194 LANE LINE, 6" | 11 MILE | $550 | $580 | $550 | $550 |
| 642E00290 CENTER LINE | 1 MILE | $800 | $790 | $800 | $800 |
| 644E00404 CHANNELIZING LINE, 12" | 5,031 FT | $1.95 | $2.10 | $1.95 | $1.95 |
| 644E00500 STOP LINE | 234 FT | $6.00 | $6.30 | $6.00 | $6.00 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 803 FT | $6.00 | $6.30 | $6.00 | $6.00 |
| 644E00720 CHEVRON MARKING | 588 FT | $6.00 | $6.30 | $6.00 | $6.00 |
| 644E01300 LANE ARROW | 16 EACH | $80.00 | $105 | $80.00 | $80.00 |
| 644E01360 WRONG WAY ARROW | 4 EACH | $125 | $210 | $125 | $125 |
| 644E01510 DOTTED LINE, 6" | 2,074 FT | $1.00 | $2.10 | $1.00 | $1.00 |
| 625E31510 PULL BOX REMOVED | 4 EACH | $250 | $210 | $250 | $600 |
| 632E26500 DETECTOR LOOP | 8 EACH | $1,750 | $1,260 | $1,750 | $2,135 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 100 HOUR | $80.00 | $78.75 | $72.00 | $76.00 |
| 614E12336 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL) | 8 EACH | $1,900 | $1,885 | $1,000 | $1,795 |
| 614E12460 WORK ZONE MARKING SIGN | 21 EACH | $125 | $158 | $190 | $150 |
| 614E12500 REPLACEMENT SIGN | 5 EACH | $110 | $200 | $190 | $160 |
| 614E12600 REPLACEMENT DRUM | 5 EACH | $60.00 | $59.00 | $50.00 | $60.00 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, UNIDIRECTIONAL | 41 EACH | $7.00 | $11.50 | $18.00 | $11.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 41 EACH | $18.00 | $11.50 | $22.00 | $11.00 |
| 614E20010 WORK ZONE LANE LINE, CLASS I, 6" | 33 MILE | $550 | $420 | $350 | $550 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 3 MILE | $700 | $720 | $600 | $700 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 15,093 FT | $0.50 | $0.55 | $0.35 | $0.50 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 627 FT | $3.00 | $2.10 | $2.75 | $3.00 |
| 622E41000 PORTABLE BARRIER, 32" | 2,040 FT | $14.00 | $14.70 | $18.00 | $14.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $26,500 | $27,000 | $21,000 | $29,000 |
| 108E30000 CPM PROGRESS SCHEDULE SHORT DURATION PROJECTS | 1 LS | $10,000 | $11,760 | $1,000 | $9,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $15,000 | $14,500 | $9,900 | $10,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E10101 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 12,901 CY | $133 | $1.72M | 30% |
| 442E10001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 11,085 CY | $143 | $1.59M | 28% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3 1/4" | 264,086 SY | $1.7 | $449k | 8% |
| 255E10010 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 1,800 SY | $120 | $216k | 4% |
| 615E20001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, AS PER | 1,778 SY | $85 | $151k | 3% |
| 611E53301 53" X 83" CONDUIT, TYPE A, 706.04, AS PER PLAN | 148 FT | $880.68 | $130k | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $130,000 | $130k | 2% |
| 872E10000 VOID REDUCING ASPHALT MEMBRANE (VRAM) | 58,765 FT | $2 | $118k | 2% |
| 617E10100 COMPACTED AGGREGATE | 2,285 CY | $49 | $112k | 2% |
| 624E10000 MOBILIZATION | 1 LS | $105,000 | $105k | 2% |