SCI-SR 335-08.63
SCI County · est $1.1M
Bid dateThursday, February 27—
SCI County · est $1.1M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 10.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 69 more items below.
| Item | Quantity | R1George J Igel & CO INC | R2D G M INC | R3Double Z Construction Company | R4Complete General Construction Company | R5Shelly & Sands INC | % of bid |
|---|---|---|---|---|---|---|---|
| 511E33312 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE | 291 CY | $720 | $1,075 | $950 | $950 | $908 | 22% |
| 202E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN | 1 LS | $122,000 | $62,500 | $65,000 | $110,000 | $85,000 | 13% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 68,341 LB | $1.15 | $1.10 | $1.50 | $1.10 | $1.10 | 8% |
| Item | Quantity | R1George J Igel & CO INC | R2D G M INC | R3Double Z Construction Company | R4Complete General Construction Company | R5Shelly & Sands INC |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,000 | $14,000 | $5,000 | $6,000 | $1,700 |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 227 SY | $13.00 | $10.00 | $20.00 | $17.00 | $15.00 |
| 202E32800 CONCRETE SLOPE PROTECTION REMOVED | 5 SY | $45.00 | $40.00 | $80.00 | $90.00 | $45.00 |
| 202E38000 GUARDRAIL REMOVED | 140 FT | $1.40 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 614E11000 MAINTAINING TRAFFIC |
| 1 LS |
| $65,000 |
| $75,000 |
| $60,000 |
| $57,000 |
| $62,000 |
| 7% |
| 526E25010 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 200 SY | $276 | $220 | $285 | $275 | $275 | 6% |
| 503E21301 UNCLASSIFIED EXCAVATION, AS PER PLAN | 1 LS | $55,000 | $32,000 | $27,000 | $40,000 | $43,000 | 6% |
| 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING | 64 CY | $852 | $500 | $772 | $820 | $1,400 | 6% |
| 507E92201 PREBORED HOLES, AS PER PLAN | 400 FT | $130 | $208 | $180 | $140 | $170 | 5% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $40,000 | $34,000 | $65,000 | $52,000 | $76,000 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40,000 | $45,000 | $40,000 | $40,000 | 4% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 231.33 FT | $171 | $159 | $175 | $145 | $149 | 4% |
| 507E00750 16" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 300 FT | $70.00 | $73.00 | $90.00 | $52.00 | $90.00 | 2% |
| 204E30020 GRANULAR MATERIAL, TYPE C | 325 CY | $56.00 | $57.00 | $45.00 | $80.00 | $72.00 | 2% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 30 CY | $600 | $375 | $700 | $700 | $700 | 2% |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 234 SY | $69.00 | $65.00 | $52.00 | $73.00 | $62.00 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $16,000 | $5,000 | $9,500 | $5,000 | $22,000 | 2% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (23 CY | $600 | $405 | $650 | $650 | $650 | 1% |
| 619E16010 FIELD OFFICE, TYPE B | 5 MNTH | $2,700 | $1,200 | $1,200 | $3,500 | $3,600 | 1% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 17 CY | $780 | $425 | $715 | $715 | $715 | 1% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 50 CY | $210 | $120 | $80.00 | $200 | $125 | 1% |
| $1.00 |
| $7.50 |
| $2.20 |
| $7.50 |
| 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A | 4 EACH | $275 | $300 | $300 | $285 | $200 |
| 203E10000 EXCAVATION | 123 CY | $21.00 | $25.00 | $35.00 | $19.00 | $30.00 |
| 203E20000 EMBANKMENT | 152 CY | $19.00 | $25.00 | $20.00 | $25.00 | $18.00 |
| 204E10000 SUBGRADE COMPACTION | 435 SY | $6.00 | $7.00 | $8.00 | $3.00 | $4.50 |
| 204E13000 EXCAVATION OF SUBGRADE | 325 CY | $11.00 | $17.50 | $18.00 | $35.00 | $32.00 |
| 204E45000 PROOF ROLLING | 1 HOUR | $85.00 | $70.00 | $180 | $130 | $168 |
| 204E50000 GEOTEXTILE FABRIC, TYPE D | 607 SY | $1.50 | $2.00 | $1.00 | $3.00 | $1.25 |
| 204E51000 GEOGRID | 467 SY | $3.00 | $4.00 | $1.50 | $4.25 | $1.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 325 FT | $16.50 | $19.00 | $17.50 | $17.60 | $18.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | — | $2,300 | $1,350 | $2,250 | $2,295 | $2,300 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $925 | $1,000 | $950 | $980 | $1,000 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $2,075 | $2,100 | $1,950 | $2,075 | $2,000 |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 31 CY | $65.00 | $80.00 | $125 | $75.00 | $110 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 134 CY | $62.00 | $70.00 | $90.00 | $71.00 | $85.00 |
| 659E10000 SEEDING AND MULCHING | 841 SY | $5.00 | $4.00 | $8.00 | $3.75 | $3.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 42 SY | $0.68 | $0.05 | $10.50 | $1.00 | $0.70 |
| 659E20000 COMMERCIAL FERTILIZER | 0.11 TON | $690 | $650 | $450 | $500 | $700 |
| 659E31000 LIME | 0.17 ACRE | $157 | $80.00 | $100 | $200 | $160 |
| 659E35000 WATER | 5 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 71 FT | $31.00 | $15.00 | $18.00 | $12.00 | $30.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 14 FT | $38.00 | $25.00 | $20.00 | $56.00 | $20.00 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 2 EACH | $240 | $200 | $400 | $240 | $440 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (3" DEPTH) | 318 SY | $20.00 | $30.00 | $36.50 | $36.50 | $36.50 |
| 304E20000 AGGREGATE BASE | 96 CY | $90.00 | $67.50 | $95.00 | $105 | $125 |
| 407E10000 TACK COAT | 52 GAL | $2.00 | $9.00 | $2.00 | $2.00 | $2.00 |
| 422E11000 AGGREGATE, SINGLE CHIP SEAL, TYPE A | 128 SY | $72.00 | $10.00 | $58.00 | $58.00 | $58.00 |
| 626E00112 BARRIER REFLECTOR, TYPE 3, BIDIRECTIONAL | 11 EACH | $13.00 | $8.00 | $8.00 | $7.65 | $8.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 84 FT | $11.00 | $13.00 | $12.50 | $13.00 | $13.00 |
| 630E08530 STREET NAME SIGN SUPPORT, NO. 4 POST | 15.5 FT | $13.00 | $16.00 | $15.00 | $16.00 | $15.00 |
| 630E08600 SIGN POST REFLECTOR | 2 EACH | $50.00 | $45.00 | $45.00 | $45.00 | $45.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 10 EACH | $65.00 | $65.00 | $55.00 | $65.00 | $55.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 7 EACH | $25.00 | $15.00 | $20.00 | $10.00 | $20.00 |
| 644E00104 EDGE LINE, 6" | 0.1 MILE | $17,710 | $20,000 | $6,211 | $17,710 | $17,710 |
| 644E00300 CENTER LINE | 0.05 MILE | $25,481 | $30,000 | $9,965 | $25,481 | $25,500 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 50 CY | $54.00 | $30.00 | $40.00 | $75.00 | $70.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $73.50 | $40.00 | $65.00 | $85.00 | $72.00 |
| 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL) | 4 EACH | $1,900 | $1,800 | $2,100 | $2,500 | $2,100 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, BIDIRECTIONAL | 16 EACH | $46.00 | $15.00 | $12.00 | $46.00 | $15.00 |
| 614E13314 BARRIER REFLECTOR, TYPE 3, BIDIRECTIONAL | 14 EACH | $52.00 | $15.00 | $12.00 | $52.00 | $10.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 30 EACH | $36.00 | $15.00 | $16.00 | $36.00 | $25.00 |
| 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I | 0.24 MILE | $12,675 | $13,000 | $12,675 | $12,675 | $12,700 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.1 MILE | $14,450 | $15,000 | $14,450 | $14,450 | $15,000 |
| 614E22200 WORK ZONE EDGE LINE, CLASS I, 4", 740.06, TYPE I | 0.34 MILE | $6,550 | $6,500 | $6,550 | $6,550 | $6,600 |
| 614E24400 WORK ZONE DOTTED LINE, CLASS I, 4", 740.06, TYPE I | 111 FT | $2.50 | $2.50 | $2.50 | $2.50 | $2.50 |
| 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I | 58 FT | $12.00 | $15.00 | $12.00 | $12.00 | $12.00 |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $7,000 | $1,000 | $14,000 | $15,000 | $8,000 |
| 616E10000 WATER | 2 MGAL | $48.00 | $1.00 | $50.00 | $130 | $69.00 |
| 622E41000 PORTABLE BARRIER, 32" | 580 FT | $15.50 | $13.00 | $16.00 | $16.00 | $25.00 |
| 622E41001 PORTABLE BARRIER, 32", AS PER PLAN | 40 FT | $19.50 | $16.00 | $25.00 | $22.00 | $95.00 |
| 622E41020 PORTABLE BARRIER, 32", BRIDGE MOUNTED | 110 FT | $19.50 | $17.50 | $25.00 | $20.00 | $55.00 |
| 202E22900 APPROACH SLAB REMOVED | 67 SY | $50.00 | $50.00 | $40.00 | $55.00 | $45.00 |
| 202E23500 WEARING COURSE REMOVED | 468 SY | $20.00 | $10.00 | $10.00 | $18.00 | $10.00 |
| 507E00100 STEEL PILES HP10X42, FURNISHED | 340 FT | $25.00 | $36.00 | $32.00 | $25.00 | $58.00 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 149 SY | $24.10 | $35.00 | $24.10 | $25.00 | $26.50 |
| 512E33000 TYPE 2 WATERPROOFING | 87 SY | $22.00 | $20.00 | $25.00 | $24.00 | $24.00 |
| 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER | 61 SF | $8.00 | $12.00 | $13.00 | $10.00 | $7.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 85 SF | $9.00 | $15.00 | $15.00 | $12.00 | $8.00 |
| 516E25000 NYLON REINFORCED NEOPRENE SHEETING | 319 SF | $13.00 | $35.00 | $25.00 | $17.00 | $12.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 56 CY | $90.00 | $80.00 | $100 | $105 | $125 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 268 FT | $10.00 | $15.00 | $16.00 | $35.00 | $15.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 117 FT | $10.00 | $15.00 | $12.00 | $8.00 | $8.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 62 FT | $11.00 | $15.00 | $18.00 | $15.00 | $8.00 |
| 526E90010 TYPE A INSTALLATION | 75 FT | $110 | $200 | $185 | $170 | $198 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,000 | $26,000 | $8,000 | $10,000 | $8,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 511E33312 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE | 291 CY | $720 | $210k | 18% |
| 202E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN | 1 LS | $122,000 | $122k | 11% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 68,341 LB | $1.15 | $79k | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $65,000 | $65k | 6% |
| 526E25010 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 200 SY | $276 | $55k | 5% |
| 503E21301 UNCLASSIFIED EXCAVATION, AS PER PLAN | 1 LS | $55,000 | $55k | 5% |
| 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING | 64 CY | $852 | $55k | 5% |
| 507E92201 PREBORED HOLES, AS PER PLAN | 400 FT | $130 | $52k | 5% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $40,000 | $40k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 3% |