SUM-/WAY-SR 21/SR 585-00.00/VAR (PART 1 AND PART 2)
SUM County · est $6.8M
Bid dateThursday, February 27—
SUM County · est $6.8M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 308 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Shelly Company | R3Karvo Companies INC | R4Ronyak Paving INC | % of bid |
|---|---|---|---|---|---|---|
| 442E10301 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 11,243 CY | $165 | $150 | $168 | $170 | 38% |
| 442E20001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 2,960 CY | $165 | $150 | $168 | $170 | 10% |
| 252E01000 FULL DEPTH RIGID PAVEMENT REMOVAL AND FLEXIBLE REP | 2,000 SY | $161 | $163 | $58.50 | $120 | 7% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T=1-1/2") | 340,817 SY | $0.85 | $1.35 | $1.20 | $0.90 | 6% |
| Item | Quantity | R1Shelly & Sands INC | R2Shelly Company | R3Karvo Companies INC | R4Ronyak Paving INC |
|---|---|---|---|---|---|
| 203E10000 EXCAVATION | 334 CY | $130 | $20.00 | $11.00 | $20.00 |
| 690E98000 SPECIAL - VERTICAL CLEARANCE | 9 EACH | $63.00 | $640 | $640 | $1,000 |
| 659E10000 SEEDING AND MULCHING | 22,258 SY | $0.96 | $0.75 | $0.85 | $0.37 |
| 659E20000 COMMERCIAL FERTILIZER | 2.99 TON | $240 | $991 | $800 | $496 |
| 659E31000 LIME | 4.58 ACRE | $25.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 2,081 CY | $125 | $105 | $116 | $125 | 5% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 7,500 SY | $33.00 | $21.00 | $14.00 | $24.00 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $155,000 | $210,100 | $290,000 | $300,000 | 3% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 2,093 CY | $67.00 | $52.00 | $32.00 | $35.00 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $134,415 | $200,000 | $375,000 | $198,410 | 3% |
| 203E20000 EMBANKMENT | 7,228 CY | $17.00 | $30.75 | $12.50 | $17.00 | 3% |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 1,845 CY | $62.00 | $59.00 | $50.00 | $60.00 | 2% |
| 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 721 CY | $145 | $144 | $147 | $140 | 2% |
| 611E96550 FIELD PAVING OF EXISTING PIPE (15'-10"X9'-10" CMP | 452 FT | $210 | $210 | $210 | $296 | 2% |
| 646E10010 EDGE LINE, 6" | 33.27 MILE | $2,800 | $2,590 | $2,800 | $2,800 | 2% |
| 407E20000 NON-TRACKING TACK COAT | 30,674 GAL | $3.00 | $2.50 | $2.50 | $2.00 | 2% |
| 605E06020 4" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 10,044 FT | $9.00 | $6.75 | $8.25 | $10.50 | 2% |
| 611E96550 FIELD PAVING OF EXISTING PIPE (TWIN 12' CMP) | 584 FT | $135 | $135 | $135 | $188 | 2% |
| 442E20001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 433 CY | $175 | $150 | $177 | $180 | 2% |
| 622E41000 PORTABLE BARRIER, 32" | 6,400 FT | $10.00 | $7.50 | $13.00 | $20.50 | 1% |
| 209E60200 LINEAR GRADING | 801 STA | $62.00 | $35.00 | $15.00 | $20.00 | 1% |
| $87.00 |
| $1.00 |
| $43.45 |
| 659E35000 WATER | 120.15 MGAL | $0.20 | $1.00 | $0.25 | $0.50 |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 9,500 FT | $2.65 | $3.25 | $2.00 | $2.75 |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 334 CY | $130 | $45.00 | $20.00 | $25.00 |
| 408E10001 PRIME COAT, AS PER PLAN | 14,497 GAL | $2.00 | $3.50 | $3.75 | $3.00 |
| 442E00100 ANTI-SEGREGATION EQUIPMENT | 9,238 CY | $1.00 | $4.50 | $5.75 | $5.00 |
| 618E40600 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 24 MILE | $800 | $610 | $800 | $800 |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 4,775 LB | $0.60 | $1.90 | $1.35 | $3.00 |
| 621E00100 RPM | 1,063 EACH | $26.00 | $25.75 | $30.76 | $27.50 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 550 EACH | $5.00 | $6.00 | $2.15 | $5.00 |
| 646E10110 LANE LINE, 6" | 14.02 MILE | $1,800 | $1,645 | $1,800 | $1,800 |
| 646E10200 CENTER LINE | 0.31 MILE | $3,900 | $3,010 | $3,900 | $3,900 |
| 646E10300 CHANNELIZING LINE, 8" | 200 FT | $1.52 | $1.50 | $1.52 | $1.52 |
| 646E10310 CHANNELIZING LINE, 12" | 10,015 FT | $1.90 | $1.75 | $1.90 | $1.90 |
| 646E10400 STOP LINE | 263 FT | $10.00 | $9.50 | $10.00 | $10.00 |
| 646E10620 CHEVRON MARKING | 1,680 FT | $8.00 | $6.50 | $8.00 | $8.00 |
| 646E20300 LANE ARROW | 11 EACH | $170 | $150 | $170 | $170 |
| 646E20504 DOTTED LINE, 6" | 9,950 FT | $1.60 | $1.45 | $1.60 | $1.60 |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,700 | $1,700 | $1,700 | $810 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 268 SY | $28.00 | $28.00 | $28.00 | $22.40 |
| 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE | 1,800 SY | $6.00 | $6.00 | $6.00 | $9.91 |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 243 SY | $25.00 | $25.00 | $25.00 | $21.86 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 200 SF | $95.00 | $95.00 | $95.00 | $92.80 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 21 FT | $9.00 | $9.00 | $9.00 | $14.00 |
| 630E80100 SIGN, FLAT SHEET | 6 SF | $16.00 | $16.00 | $16.00 | $20.00 |
| 630E80100 SIGN, FLAT SHEET, 730.20 | 1 SF | $20.00 | $20.00 | $20.00 | $30.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 3 EACH | $15.00 | $15.00 | $15.00 | $10.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $15.00 | $15.00 | $15.00 | $10.00 |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,700 | $1,700 | $1,700 | $810 |
| 202E38000 GUARDRAIL REMOVED | 62.5 FT | $1.60 | $1.60 | $2.00 | $2.00 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 268 SY | $28.00 | $28.00 | $28.00 | $22.40 |
| 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE | 1,400 SY | $6.00 | $6.00 | $6.00 | $9.91 |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 243 SY | $25.00 | $25.00 | $25.00 | $21.86 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 200 SF | $95.00 | $95.00 | $95.00 | $92.80 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 62.5 FT | $18.40 | $18.40 | $18.40 | $18.40 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 21 FT | $9.00 | $9.00 | $9.00 | $14.00 |
| 630E80100 SIGN, FLAT SHEET | 6 SF | $16.00 | $16.00 | $16.00 | $20.00 |
| 630E80100 SIGN, FLAT SHEET, 730.20 | 1 SF | $20.00 | $20.00 | $20.00 | $30.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 3 EACH | $15.00 | $15.00 | $15.00 | $10.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $15.00 | $15.00 | $15.00 | $10.00 |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,700 | $1,700 | $1,700 | $810 |
| 202E38000 GUARDRAIL REMOVED | 125 FT | $1.60 | $1.60 | $2.00 | $2.00 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 252 SY | $28.00 | $28.00 | $28.00 | $22.40 |
| 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE | 1,028 SY | $6.00 | $6.00 | $6.00 | $9.91 |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 232 SY | $25.00 | $25.00 | $25.00 | $21.86 |
| 516E10901 ELASTOMERIC COMPRESSION SEAL, AS PER PLAN | 71 FT | $120 | $120 | $120 | $119 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 150 SF | $95.00 | $95.00 | $95.00 | $92.80 |
| 519E12304 PATCHING CONCRETE BRIDGE DECK - TYPE C | 6 SY | $700 | $700 | $700 | $891 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 125 FT | $18.40 | $18.40 | $18.40 | $18.40 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 21 FT | $9.00 | $9.00 | $9.00 | $14.00 |
| 630E80100 SIGN, FLAT SHEET | 6 SF | $16.00 | $16.00 | $16.00 | $20.00 |
| 630E80100 SIGN, FLAT SHEET, 730.20 | 1 SF | $20.00 | $20.00 | $20.00 | $30.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 3 EACH | $15.00 | $15.00 | $15.00 | $10.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $15.00 | $15.00 | $15.00 | $10.00 |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,700 | $1,700 | $1,700 | $810 |
| 202E38000 GUARDRAIL REMOVED | 125 FT | $1.60 | $1.60 | $2.00 | $2.00 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 323 SY | $28.00 | $28.00 | $28.00 | $22.40 |
| 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE | 1,349 SY | $6.00 | $6.00 | $6.00 | $9.91 |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 283 SY | $25.00 | $25.00 | $25.00 | $21.86 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 300 SF | $95.00 | $95.00 | $95.00 | $92.80 |
| 519E12304 PATCHING CONCRETE BRIDGE DECK - TYPE C | 8 SY | $700 | $700 | $700 | $891 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 125 FT | $18.40 | $18.40 | $18.40 | $18.40 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 21 FT | $9.00 | $9.00 | $9.00 | $14.00 |
| 630E80100 SIGN, FLAT SHEET | 6 SF | $16.00 | $16.00 | $16.00 | $20.00 |
| 630E80100 SIGN, FLAT SHEET, 730.20 | 1 SF | $20.00 | $20.00 | $20.00 | $30.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 3 EACH | $15.00 | $15.00 | $15.00 | $10.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $15.00 | $15.00 | $15.00 | $10.00 |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,700 | $1,700 | $1,700 | $810 |
| 202E70130 SPECIAL - PIPE CLEANOUT OVER 48" | 584 FT | $31.75 | $31.75 | $31.75 | $11.52 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $25,000 | $25,000 | $25,000 | $2,304 |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 15 CY | $300 | $300 | $300 | $213 |
| 613E41200 LOW STRENGTH MORTAR BACKFILL | 5 CY | $150 | $150 | $150 | $296 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 14 FT | $9.00 | $9.00 | $9.00 | $14.00 |
| 630E80100 SIGN, FLAT SHEET, 730.20 | 2 SF | $20.00 | $20.00 | $20.00 | $30.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 2 EACH | $15.00 | $15.00 | $15.00 | $10.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $15.00 | $15.00 | $15.00 | $10.00 |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,700 | $1,700 | $1,700 | $810 |
| 202E70130 SPECIAL - PIPE CLEANOUT OVER 48" | 452 FT | $32.00 | $32.00 | $32.00 | $18.24 |
| 202E98000 REMOVAL MISC.:CHANNEL CLEANOUT | 1 LS | $5,000 | $5,000 | $5,000 | $8,244 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $25,000 | $25,000 | $25,000 | $2,304 |
| 613E41200 LOW STRENGTH MORTAR BACKFILL | 5 CY | $100 | $100 | $100 | $296 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 14 FT | $9.00 | $9.00 | $9.00 | $14.00 |
| 630E80100 SIGN, FLAT SHEET, 730.20 | 2 SF | $20.00 | $20.00 | $20.00 | $30.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 2 EACH | $15.00 | $15.00 | $15.00 | $10.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $15.00 | $15.00 | $15.00 | $10.00 |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,700 | $1,700 | $1,700 | $810 |
| 203E40000 BORROW | 10 CY | $250 | $250 | $250 | $47.40 |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 20 CY | $300 | $300 | $300 | $213 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 14 FT | $9.00 | $9.00 | $9.00 | $14.00 |
| 630E80100 SIGN, FLAT SHEET, 730.20 | 2 SF | $20.00 | $20.00 | $20.00 | $30.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 2 EACH | $15.00 | $15.00 | $15.00 | $10.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $15.00 | $15.00 | $15.00 | $10.00 |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,700 | $1,700 | $1,700 | $810 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 146 SY | $15.00 | $15.00 | $15.00 | $17.54 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 1,102 SY | $28.00 | $28.00 | $28.00 | $22.40 |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 1,248 SY | $25.00 | $25.00 | $25.00 | $21.86 |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,700 | $1,700 | $1,700 | $810 |
| 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE | 1,358 SY | $6.00 | $6.00 | $6.00 | $9.91 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 42 FT | $9.00 | $9.00 | $9.00 | $14.00 |
| 630E80100 SIGN, FLAT SHEET | 12 SF | $16.00 | $16.00 | $16.00 | $20.00 |
| 630E80100 SIGN, FLAT SHEET, 730.20 | 2 SF | $20.00 | $20.00 | $20.00 | $30.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 6 EACH | $15.00 | $15.00 | $15.00 | $10.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 4 EACH | $15.00 | $15.00 | $15.00 | $10.00 |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,700 | $1,700 | $1,700 | $810 |
| 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE | 1,004 SY | $6.00 | $6.00 | $6.00 | $9.91 |
| 519E12304 PATCHING CONCRETE BRIDGE DECK - TYPE C | 6 SY | $700 | $700 | $700 | $891 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 42 FT | $9.00 | $9.00 | $9.00 | $14.00 |
| 630E80100 SIGN, FLAT SHEET | 12 SF | $16.00 | $16.00 | $16.00 | $20.00 |
| 630E80100 SIGN, FLAT SHEET, 730.20 | 2 SF | $20.00 | $20.00 | $20.00 | $30.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 6 EACH | $15.00 | $15.00 | $15.00 | $10.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 4 EACH | $15.00 | $15.00 | $15.00 | $10.00 |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,700 | $1,700 | $1,700 | $810 |
| 202E38000 GUARDRAIL REMOVED | 150 FT | $1.60 | $1.60 | $2.00 | $2.00 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 558 SY | $28.00 | $28.00 | $28.00 | $22.40 |
| 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE | 870 SY | $6.00 | $6.00 | $6.00 | $9.91 |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 533 SY | $25.00 | $25.00 | $25.00 | $21.86 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 200 SF | $95.00 | $95.00 | $95.00 | $92.80 |
| 519E12304 PATCHING CONCRETE BRIDGE DECK - TYPE C | 6 SY | $700 | $700 | $700 | $891 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 150 FT | $18.40 | $18.40 | $18.40 | $18.40 |
| 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 1 EACH | $550 | $575 | $575 | $575 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 21 FT | $9.00 | $9.00 | $9.00 | $14.00 |
| 630E80100 SIGN, FLAT SHEET | 6 SF | $16.00 | $16.00 | $16.00 | $20.00 |
| 630E80100 SIGN, FLAT SHEET, 730.20 | 1 SF | $20.00 | $20.00 | $20.00 | $30.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 3 EACH | $15.00 | $15.00 | $15.00 | $10.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $15.00 | $15.00 | $15.00 | $10.00 |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,700 | $1,700 | $1,700 | $810 |
| 202E38000 GUARDRAIL REMOVED | 50 FT | $1.60 | $1.60 | $2.00 | $2.00 |
| 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE | 1,042 SY | $6.34 | $6.00 | $6.00 | $9.91 |
| 519E12304 PATCHING CONCRETE BRIDGE DECK - TYPE C | 6 SY | $700 | $700 | $700 | $891 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 50 FT | $18.40 | $18.40 | $18.40 | $18.40 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 42 FT | $9.00 | $9.00 | $9.00 | $14.00 |
| 630E80100 SIGN, FLAT SHEET | 12 SF | $16.00 | $16.00 | $16.00 | $20.00 |
| 630E80100 SIGN, FLAT SHEET, 730.20 | 2 SF | $20.00 | $20.00 | $20.00 | $30.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 6 EACH | $15.00 | $15.00 | $15.00 | $10.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 4 EACH | $15.00 | $15.00 | $15.00 | $10.00 |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,700 | $1,700 | $1,700 | $810 |
| 202E38000 GUARDRAIL REMOVED | 925 FT | $1.60 | $1.60 | $2.00 | $2.00 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 15 SY | $100 | $100 | $100 | $22.40 |
| 530E00600 SPECIAL - STRUCTURES: CONCRETE SPALL REMOVAL | 15 SF | $150 | $150 | $150 | $26.55 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 775 FT | $18.40 | $18.40 | $18.40 | $18.40 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 4 EACH | $970 | $970 | $970 | $970 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $2,065 | $2,065 | $2,065 | $2,065 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 42 FT | $9.00 | $9.00 | $9.00 | $14.00 |
| 630E80100 SIGN, FLAT SHEET | 12 SF | $16.00 | $16.00 | $16.00 | $20.00 |
| 630E80100 SIGN, FLAT SHEET, 730.20 | 2 SF | $20.00 | $20.00 | $20.00 | $30.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 6 EACH | $15.00 | $15.00 | $15.00 | $10.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 4 EACH | $15.00 | $15.00 | $15.00 | $10.00 |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,700 | $1,700 | $1,700 | $810 |
| 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE | 4,444 SY | $6.00 | $6.00 | $6.00 | $9.91 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 42 FT | $9.00 | $9.00 | $9.00 | $14.00 |
| 630E80100 SIGN, FLAT SHEET | 12 SF | $16.00 | $16.00 | $16.00 | $20.00 |
| 630E80100 SIGN, FLAT SHEET, 730.20 | 2 SF | $20.00 | $20.00 | $20.00 | $30.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 6 EACH | $15.00 | $15.00 | $15.00 | $10.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 4 EACH | $15.00 | $15.00 | $15.00 | $10.00 |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,700 | $1,700 | $1,700 | $810 |
| 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE | 1,276 SY | $6.00 | $6.00 | $6.00 | $9.91 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 42 FT | $9.00 | $9.00 | $9.00 | $14.00 |
| 630E80100 SIGN, FLAT SHEET | 12 SF | $16.00 | $16.00 | $16.00 | $20.00 |
| 630E80100 SIGN, FLAT SHEET, 730.20 | 2 SF | $20.00 | $20.00 | $20.00 | $30.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 6 EACH | $15.00 | $15.00 | $15.00 | $10.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 4 EACH | $15.00 | $15.00 | $15.00 | $10.00 |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,700 | $1,700 | $1,700 | $810 |
| 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE | 2,866 SY | $6.00 | $6.00 | $6.00 | $9.91 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 42 FT | $9.00 | $9.00 | $9.00 | $14.00 |
| 630E80100 SIGN, FLAT SHEET | 12 SF | $16.00 | $16.00 | $16.00 | $20.00 |
| 630E80100 SIGN, FLAT SHEET, 730.20 | 2 SF | $20.00 | $20.00 | $20.00 | $30.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 6 EACH | $15.00 | $15.00 | $15.00 | $10.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 4 EACH | $15.00 | $15.00 | $15.00 | $10.00 |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,700 | $1,700 | $1,700 | $810 |
| 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE | 3,290 SY | $6.00 | $6.00 | $6.00 | $9.91 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 42 FT | $9.00 | $9.00 | $9.00 | $14.00 |
| 630E80100 SIGN, FLAT SHEET | 12 SF | $16.00 | $16.00 | $16.00 | $20.00 |
| 630E80100 SIGN, FLAT SHEET, 730.20 | 2 SF | $20.00 | $20.00 | $20.00 | $30.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 6 EACH | $15.00 | $15.00 | $15.00 | $10.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 4 EACH | $15.00 | $15.00 | $15.00 | $10.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 400 HOUR | $65.00 | $65.00 | $65.00 | $60.00 |
| 614E12420 DETOUR SIGNING | 1 LS | $16,000 | $16,000 | $16,000 | $16,000 |
| 614E12460 WORK ZONE MARKING SIGN | 60 EACH | $60.00 | $60.00 | $60.00 | $60.00 |
| 614E12470 WORK ZONE SPEED LIMIT SIGN | 2 EACH | $150 | $150 | $150 | $150 |
| 614E12484 WORK ZONE INCREASED PENALTIES SIGN | 12 EACH | $165 | $165 | $165 | $165 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 15 CY | $200 | $156 | $225 | $250 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 30 SNMT | $900 | $900 | $900 | $900 |
| 614E20010 WORK ZONE LANE LINE, CLASS I, 6" | 12.77 MILE | $675 | $750 | $750 | $675 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 12.77 MILE | $675 | $750 | $750 | $675 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 0.06 MILE | $3,000 | $3,000 | $3,000 | $3,000 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.06 MILE | $3,000 | $3,000 | $3,000 | $3,000 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 30.76 MILE | $525 | $675 | $675 | $525 |
| 614E23010 WORK ZONE CHANNELIZING LINE, CLASS I, 12" | 9,480 FT | $0.60 | $0.75 | $0.75 | $0.60 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 9,480 FT | $0.50 | $0.75 | $0.75 | $0.50 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 263 FT | $2.75 | $3.00 | $3.00 | $2.75 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 263 FT | $2.55 | $3.00 | $3.00 | $2.55 |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 60 SNMT | $275 | $208 | $650 | $650 |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $10,500 | $30,000 | $22,000 | $3,500 |
| 202E23000 PAVEMENT REMOVED | 509 SY | $5.00 | $25.00 | $48.00 | $15.50 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 187 FT | $5.00 | $30.00 | $16.00 | $16.00 |
| 202E38000 GUARDRAIL REMOVED | 1,650 FT | $1.60 | $1.60 | $1.80 | $1.80 |
| 202E58100 CATCH BASIN REMOVED | 4 EACH | $220 | $275 | $325 | $350 |
| 202E75000 FENCE REMOVED | 1,000 FT | $2.25 | $1.60 | $1.60 | $1.60 |
| 202E75704 REMOVAL OF EXISTING CONTROL CENTER AND FOUNDATION | 2 EACH | $550 | $1,000 | $1,000 | $1,000 |
| 203E10000 EXCAVATION | 793 CY | $10.00 | $35.00 | $9.00 | $8.50 |
| 203E10000 EXCAVATION (FOR PAVEMENT REPAIR) | 17 CY | $110 | $20.00 | $33.00 | $64.00 |
| 204E10000 SUBGRADE COMPACTION | 11,124 SY | $1.25 | $1.00 | $0.65 | $2.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 800 CY | $15.00 | $45.00 | $15.15 | $22.50 |
| 204E30010 GRANULAR MATERIAL, TYPE B | 800 CY | $50.00 | $45.00 | $45.00 | $68.50 |
| 204E45000 PROOF ROLLING | 6 HOUR | $210 | $185 | $145 | $114 |
| 204E50000 GEOTEXTILE FABRIC | 2,400 SY | $0.40 | $1.25 | $0.85 | $1.00 |
| 204E51000 GEOGRID | 2,400 SY | $1.00 | $2.00 | $1.60 | $2.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 1,600 FT | $16.80 | $16.80 | $16.80 | $16.80 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E(MASH 2016) | 3 EACH | $2,250 | $2,250 | $2,250 | $2,250 |
| 607E15000 FENCE, TYPE 47 | 2,600 FT | $9.35 | $9.35 | $9.35 | $9.35 |
| 607E70000 FENCELINE SEEDING AND MULCHING | 2,600 FT | $1.20 | $1.20 | $1.20 | $1.20 |
| 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1 | 19 SY | $100 | $155 | $140 | $81.00 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $75.00 | $250 | $100 | $100 |
| 659E00300 TOPSOIL | 1,143 CY | $12.00 | $27.00 | $23.00 | $66.75 |
| 659E10000 SEEDING AND MULCHING | 10,297 SY | $0.96 | $1.50 | $0.73 | $1.46 |
| 659E14000 REPAIR SEEDING AND MULCHING | 515 SY | $0.96 | $0.50 | $0.01 | $0.50 |
| 659E15000 INTER-SEEDING | 515 SY | $2.00 | $0.50 | $0.01 | $0.50 |
| 659E20000 COMMERCIAL FERTILIZER | 1.44 TON | $240 | $990 | $800 | $992 |
| 659E31000 LIME | 2.13 ACRE | $25.00 | $89.00 | $0.50 | $88.76 |
| 659E35000 WATER | 57 MGAL | $0.20 | $1.00 | $0.25 | $1.00 |
| 670E00700 DITCH EROSION PROTECTION | 234 SY | $1.75 | $27.25 | $3.00 | $17.11 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,275 | $1,275 | $1,275 | $1,275 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $2,115 | $5,000 | $4,230 | $8,500 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $8,500 | $15,000 | $8,281 | $8,500 |
| 832E30000 EROSION CONTROL | 35,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 1 CY | $1,500 | $4,300 | $1,700 | $2,190 |
| 605E05200 4" UNCLASSIFIED PIPE UNDERDRAINS | 512 FT | $11.00 | $10.50 | $10.00 | $11.00 |
| 605E13410 6" UNCLASSIFIED PIPE UNDERDRAINS WITH GEOTEXTILE F | 10 FT | $35.00 | $100 | $14.00 | $17.00 |
| 611E00410 4" CONDUIT, TYPE F FOR UNDERDRAIN OUTLET | 99 FT | $20.00 | $28.00 | $13.50 | $15.00 |
| 611E01500 6" CONDUIT, TYPE F | 50 FT | $15.00 | $40.00 | $10.00 | $22.00 |
| 611E01800 8" CONDUIT, TYPE B, 706.01, 707.12, OR 707.33 | 20 FT | $43.00 | $58.00 | $46.50 | $42.00 |
| 611E02000 8" CONDUIT, TYPE C | 7 FT | $55.00 | $200 | $100 | $34.00 |
| 611E05900 15" CONDUIT, TYPE B, 706.01, 707.12 OR 707.33 | 142 FT | $80.00 | $85.00 | $65.00 | $81.50 |
| 611E05900 15" CONDUIT, TYPE B, 706.02 | 20 FT | $89.00 | $130 | $65.00 | $99.00 |
| 611E06100 15" CONDUIT, TYPE C | 141 FT | $75.00 | $88.00 | $53.00 | $64.50 |
| 611E07400 18" CONDUIT, TYPE B, 706.02 | 10 FT | $120 | $180 | $125 | $101 |
| 611E07600 18" CONDUIT, TYPE C | 36 FT | $80.00 | $180 | $73.00 | $70.50 |
| 611E98470 CATCH BASIN, NO. 2-2B | 4 EACH | $1,500 | $2,700 | $1,550 | $1,947 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 12 EACH | $325 | $370 | $105 | $248 |
| 407E20000 NON-TRACKING TACK COAT | 1,911 GAL | $3.00 | $2.50 | $2.50 | $2.00 |
| 408E10001 PRIME COAT, AS PER PLAN | 849 GAL | $3.00 | $3.50 | $3.75 | $3.00 |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 90 CY | $78.00 | $100 | $40.00 | $65.00 |
| 872E10000 VOID REDUCING ASPHALT MEMBRANE (VRAM) | 3,601 FT | $2.40 | $2.40 | $2.38 | $2.50 |
| 875E10000 LONGITUDINAL JOINT ADHESIVE @ 1 LB / 4 FT | 901 LB | $0.60 | $2.80 | $2.50 | $4.00 |
| 621E00100 RPM | 45 EACH | $85.00 | $25.75 | $76.00 | $34.50 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (ONE-WAY) | 160 EACH | $7.00 | $7.00 | $8.00 | $8.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 164.5 FT | $10.00 | $10.00 | $10.00 | $10.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST(SQUARE POST) | 55 FT | $13.00 | $13.00 | $13.00 | $13.00 |
| 630E04100 GROUND MOUNTED SUPPORT, NO. 4 POST | 213 FT | $12.50 | $12.50 | $12.50 | $12.50 |
| 630E06500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W6X9 | 192 FT | $25.00 | $25.00 | $25.00 | $25.00 |
| 630E07500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X22 | 106 FT | $44.00 | $44.00 | $44.00 | $44.00 |
| 630E07600 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X12 | 35 FT | $32.00 | $32.00 | $32.00 | $32.00 |
| 630E08600 SIGN POST REFLECTOR (RED) | 21 EACH | $45.00 | $45.00 | $45.00 | $45.00 |
| 630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION | 16 EACH | $395 | $395 | $395 | $395 |
| 630E80100 SIGN, FLAT SHEET | 480.74 SF | $15.00 | $15.00 | $15.00 | $15.00 |
| 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET | 192 SF | $18.70 | $18.70 | $18.70 | $18.70 |
| 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION | 16 EACH | $795 | $795 | $795 | $795 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 30 EACH | $10.00 | $10.00 | $10.00 | $10.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 29 EACH | $15.00 | $15.00 | $15.00 | $15.00 |
| 646E10010 EDGE LINE, 6" | 0.16 MILE | $13,000 | $3,580 | $13,000 | $13,000 |
| 646E10200 CENTER LINE | 0.04 MILE | $55,000 | $4,005 | $55,000 | $55,000 |
| 646E10310 CHANNELIZING LINE, 12" | 2,394 FT | $2.10 | $1.75 | $2.10 | $2.10 |
| 646E10400 STOP LINE | 99 FT | $12.00 | $9.50 | $12.00 | $12.00 |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 747 FT | $6.00 | $6.50 | $6.00 | $6.00 |
| 646E20300 LANE ARROW | 29 EACH | $155 | $150 | $155 | $155 |
| 646E20504 DOTTED LINE, 6" | 313 FT | $2.20 | $1.45 | $2.20 | $2.20 |
| 632E90020 REMOVAL OF MISCELLANEOUS TRAFFIC SIGNAL ITEM (SIGN | 8 EACH | $150 | $150 | $150 | $212 |
| 632E90020 REMOVAL OF MISCELLANEOUS TRAFFIC SIGNAL ITEM (SIGN | 2 EACH | $250 | $500 | $500 | $960 |
| 632E90030 REMOVAL OF MISCELLANEOUS TRAFFIC SIGNAL ITEM (WIRE | 270 FT | $1.00 | $1.00 | $1.00 | $5.50 |
| 633E67200 CONTROLLER WORK PAD | 1 EACH | $500 | $500 | $500 | $1,236 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 100 HOUR | $65.00 | $65.00 | $65.00 | $60.00 |
| 614E12336 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL) | 4 EACH | $1,800 | $1,800 | $1,800 | $1,800 |
| 614E12420 DETOUR SIGNING | 1 LS | $4,000 | $4,000 | $5,000 | $4,000 |
| 614E12460 WORK ZONE MARKING SIGN | 16 EACH | $70.00 | $70.00 | $70.00 | $70.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $200 | $115 | $220 | $250 |
| 614E13310 BARRIER REFLECTOR, TYPE 1(ONE-WAY) | 128 EACH | $5.00 | $5.00 | $8.00 | $8.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 128 EACH | $9.00 | $10.00 | $10.00 | $10.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 16 SNMT | $800 | $850 | $850 | $850 |
| 614E20000 WORK ZONE LANE LINE, CLASS I, 4" | 1 MILE | $1,000 | $1,000 | $1,000 | $1,000 |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" | 3.2 MILE | $860 | $860 | $860 | $860 |
| 614E24000 WORK ZONE DOTTED LINE, CLASS I | 2,640 FT | $0.75 | $0.75 | $0.75 | $0.75 |
| 616E10000 WATER | 24 MGAL | $20.00 | $50.00 | $5.00 | $5.00 |
| 625E00450 CONNECTION, FUSED PULL APART | 20 EACH | $100 | $100 | $100 | $86.60 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 21 EACH | $100 | $100 | $100 | $89.00 |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT18B40 | 10 EACH | $2,400 | $2,400 | $2,400 | $2,852 |
| 625E14100 LIGHT POLE FOUNDATION, 24" X 8' DEEP | 10 EACH | $1,000 | $1,000 | $1,000 | $1,668 |
| 625E23302 NO. 6 AWG 2400 VOLT DISTRIBUTION CABLE | 1,773 FT | $1.75 | $1.75 | $1.75 | $3.89 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 1,000 FT | $1.25 | $1.25 | $1.25 | $1.59 |
| 625E24324 1-1/2" DUCT CABLE WITH THREE NO. 6 AWG 2400 VOLT C | 2,128 FT | $5.00 | $5.00 | $5.00 | $12.46 |
| 625E25900 CONDUIT, JACKED OR DRILLED, 3", 725.04 | 551 FT | $35.00 | $35.00 | $35.00 | $51.28 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 10 EACH | $500 | $500 | $500 | $500 |
| 625E29000 TRENCH | 1,968 FT | $5.00 | $5.00 | $5.00 | $6.18 |
| 625E30700 PULL BOX, 725.08, 18" | 6 EACH | $850 | $850 | $850 | $972 |
| 625E30706 PULL BOX, 725.08, 24" | 1 EACH | $950 | $950 | $950 | $1,162 |
| 625E32000 GROUND ROD | 12 EACH | $200 | $200 | $200 | $158 |
| 625E34001 POWER SERVICE, AS PER PLAN | 2 EACH | $6,000 | $6,000 | $6,000 | $4,090 |
| 625E36000 PLASTIC CAUTION TAPE | 1,968 FT | $0.25 | $0.25 | $0.25 | $0.28 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL (CC-N) | 1 EACH | $800 | $800 | $800 | $1,882 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL (CC-O) | 1 EACH | $800 | $800 | $800 | $1,882 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $5,000 | $9,500 | $5,000 | $5,000 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $25,025 | $20,000 | $65,000 | $38,000 |
| 619E16010 FIELD OFFICE, TYPE B | 11 MNTH | $2,000 | $2,000 | $1,750 | $1,250 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $13,155 | $10,229 | $12,650 | $19,991 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E10301 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 11,243 CY | $165 | $1.86M | 28% |
| 442E20001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 2,960 CY | $165 | $488k | 7% |
| 252E01000 FULL DEPTH RIGID PAVEMENT REMOVAL AND FLEXIBLE REP | 2,000 SY | $161 | $322k | 5% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T=1-1/2") | 340,817 SY | $0.85 | $290k | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 2,081 CY | $125 | $260k | 4% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 7,500 SY | $33 | $248k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $155,000 | $155k | 2% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 2,093 CY | $67 | $140k | 2% |
| 624E10000 MOBILIZATION | 1 LS | $134,415 | $134k | 2% |
| 203E20000 EMBANKMENT | 7,228 CY | $17 | $123k | 2% |