WAY-SR 83-16.31
WAY County · est $6.3M
Bid dateThursday, February 27—
WAY County · est $6.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 55 more items below.
| Item | Quantity | R1Karvo Companies INC | R2Shelly & Sands INC | R3Kokosing Construction Company INC | R4Chagrin Valley Paving INC | % of bid |
|---|---|---|---|---|---|---|
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 9,980 CY | $118 | $118 | $130 | $119 | 21% |
| 442E10101 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 7,367 CY | $135 | $140 | $155 | $150 | 18% |
| 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 5,376 CY | $164 | $170 | $190 | $175 | 16% |
| 304E20000 AGGREGATE BASE | 13,304 CY | $56.00 | $60.00 | $50.00 | $45.00 |
| Item | Quantity | R1Karvo Companies INC | R2Shelly & Sands INC | R3Kokosing Construction Company INC | R4Chagrin Valley Paving INC |
|---|---|---|---|---|---|
| 202E38000 GUARDRAIL REMOVED | 337.5 FT | $2.00 | $1.60 | $1.40 | $2.00 |
| 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A | 1 EACH | $285 | $285 | $275 | $285 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 4 EACH | $145 | $145 | $125 | $145 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 8 EACH | $110 | $110 | $125 | $110 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 13% |
| 203E10001 EXCAVATION, AS PER PLAN | 13,807 CY | $18.00 | $26.00 | $15.00 | $10.00 | 4% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (3.0") | 150,070 SY | $1.55 | $1.25 | $1.30 | $2.05 | 4% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (6.0") | 59,840 SY | $3.65 | $3.00 | $2.55 | $3.00 | 4% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 1,275 CY | $154 | $200 | $130 | $200 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $180,000 | $76,000 | $200,000 | $300,000 | 3% |
| 690E12060 SPECIAL - PAVEMENT OVERLAY FABRIC COMPOSITE | 24,940 SY | $7.12 | $7.00 | $7.50 | $7.32 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $75,000 | $40,000 | $260,630 | $525,000 | 1% |
| 605E31100 AGGREGATE DRAINS | 8,365 FT | $8.50 | $5.00 | $8.00 | $6.00 | 1% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 1,500 CY | $40.00 | $50.00 | $50.00 | $50.00 | 1% |
| 617E10100 COMPACTED AGGREGATE | 2,092 CY | $25.00 | $50.00 | $30.00 | $50.00 | 1% |
| 253E02000 PAVEMENT REPAIR | 300 CY | $165 | $250 | $150 | $227 | 1% |
| 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 270 CY | $153 | $170 | $190 | $175 | 1% |
| 874E20000 LONGITUDINAL JOINT PREPARATION | 44,300 FT | $0.90 | $0.60 | $0.60 | $0.25 | 1% |
| 407E10000 TACK COAT | 19,738 GAL | $1.95 | $2.00 | $2.00 | $2.00 | 1% |
| 408E10001 PRIME COAT, AS PER PLAN | 8,583 GAL | $3.75 | $3.00 | $3.00 | $2.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $30,000 | $4,511 | $25,000 | $35,000 | 1% |
| 202E42810 ANCHOR ASSEMBLY REMOVED FOR REUSE, TYPE E |
| 3 EACH |
| $165 |
| $165 |
| $300 |
| $165 |
| 203E20001 EMBANKMENT, AS PER PLAN | 30 CY | $79.00 | $79.00 | $52.00 | $100 |
| 204E10000 SUBGRADE COMPACTION | 59,840 SY | $0.45 | $0.50 | $0.90 | $0.25 |
| 204E13000 EXCAVATION OF SUBGRADE | 1,500 CY | $15.00 | $15.00 | $25.00 | $10.00 |
| 204E45000 PROOF ROLLING | 30 HOUR | $100 | $270 | $75.00 | $150 |
| 204E50000 GEOTEXTILE FABRIC | 3,000 SY | $1.00 | $1.40 | $0.50 | $1.00 |
| 209E15000 RESHAPING UNDER GUARDRAIL | 10.5 STA | $60.00 | $50.00 | $100 | $420 |
| 209E60500 LINEAR GRADING | 0.6 MILE | $3,000 | $4,500 | $1,700 | $7,500 |
| 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA | 17.88 MILE | $1,430 | $1,000 | $1,700 | $750 |
| 209E80000 GRADING MAILBOX APPROACHES | 39 EACH | $70.00 | $300 | $10.00 | $50.00 |
| 605E05110 4" SHALLOW PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 1,000 FT | $12.00 | $18.00 | $7.00 | $10.00 |
| 606E13000 GUARDRAIL, TYPE 5 | 100 FT | $17.60 | $17.60 | $16.82 | $17.60 |
| 606E15050 GUARDRAIL, TYPE MGS | 250 FT | $19.80 | $19.80 | $16.50 | $19.80 |
| 606E17000 RAISING TYPE 5 GUARDRAIL | 200 FT | $9.80 | $9.80 | $5.80 | $9.80 |
| 606E26100 ANCHOR ASSEMBLY, TYPE E | 1 EACH | $2,320 | $2,320 | $2,300 | $2,320 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 4 EACH | $2,395 | $2,395 | $2,300 | $2,395 |
| 606E26500 ANCHOR ASSEMBLY, TYPE T | 8 EACH | $760 | $760 | $900 | $760 |
| 606E27850 ANCHOR ASSEMBLY REBUILT, TYPE E | 3 EACH | $1,180 | $1,180 | $2,300 | $1,180 |
| 623E39500 MONUMENT BOX ADJUSTED TO GRADE | 7 EACH | $150 | $50.00 | $500 | $850 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 25 EACH | $7.00 | $7.00 | $8.50 | $7.00 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 1 EACH | $165 | $150 | $150 | $165 |
| 659E10001 SEEDING AND MULCHING, AS PER PLAN | 3,885 SY | $1.75 | $1.80 | $1.25 | $2.00 |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 9 EACH | $900 | $800 | $500 | $750 |
| 611E99150 INLET ADJUSTED TO GRADE | 5 EACH | $1,000 | $600 | $400 | $750 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 2 EACH | $800 | $750 | $500 | $750 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.25") | 564 SY | $2.20 | $5.00 | $2.15 | $4.00 |
| 254E01600 PATCHING PLANED SURFACE | 761 SY | $0.50 | $8.00 | $1.25 | $10.00 |
| 617E20000 SHOULDER PREPARATION | 704 SY | $1.75 | $16.00 | $0.25 | $6.00 |
| 618E43000 RUMBLE STRIPES, CENTER LINE (ASPHALT CONCRETE) | 8.39 MILE | $1,494 | $800 | $745 | $1,500 |
| 621E00100 RPM | 707 EACH | $24.50 | $24.00 | $26.25 | $26.25 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 706 EACH | $2.00 | $5.00 | $3.00 | $10.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 18.52 MILE | $615 | $615 | $615 | $615 |
| 642E00300 CENTER LINE, TYPE 1 | 9.44 MILE | $835 | $835 | $835 | $835 |
| 644E00500 STOP LINE | 484 FT | $6.00 | $6.00 | $6.00 | $6.00 |
| 644E00600 CROSSWALK LINE | 282 FT | $3.00 | $3.00 | $3.00 | $3.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 10 HOUR | $65.00 | $65.00 | $80.00 | $75.00 |
| 614E12420 DETOUR SIGNING | 1 LS | $20,000 | $20,000 | $30,000 | $20,000 |
| 614E12460 WORK ZONE MARKING SIGN | 20 EACH | $55.00 | $55.00 | $55.00 | $55.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 30 CY | $200 | $185 | $400 | $350 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 18 SNMT | $900 | $900 | $900 | $900 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 10.38 MILE | $750 | $750 | $750 | $750 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 484 FT | $2.75 | $2.75 | $2.75 | $2.75 |
| 614E27620 WORK ZONE CROSSWALK LINE, CLASS III, 642 PAINT | 282 FT | $2.50 | $2.50 | $2.50 | $2.50 |
| 614E40051 BUSINESS ENTRANCE SIGN, AS PER PLAN | 28 EACH | $150 | $150 | $150 | $150 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 9.44 MILE | $900 | $900 | $900 | $900 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 17 MILE | $615 | $615 | $615 | $615 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 350 CY | $5.00 | $70.00 | $40.00 | $75.00 |
| 410E13000 TRAFFIC COMPACTED SURFACE, TYPE C | 350 CY | $20.00 | $70.00 | $45.00 | $75.00 |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $2,000 | $2,000 | $2,000 | $1,500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $12,000 | $5,500 | $6,000 | $10,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 9,980 CY | $118 | $1.18M | 20% |
| 442E10101 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 7,367 CY | $135 | $995k | 17% |
| 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 5,376 CY | $164 | $882k | 15% |
| 304E20000 AGGREGATE BASE | 13,304 CY | $56 | $745k | 13% |
| 203E10001 EXCAVATION, AS PER PLAN | 13,807 CY | $18 | $249k | 4% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (3.0") | 150,070 SY | $1.55 | $233k | 4% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (6.0") | 59,840 SY | $3.65 | $218k | 4% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 1,275 CY | $154 | $196k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $180,000 | $180k | 3% |
| 690E12060 SPECIAL - PAVEMENT OVERLAY FABRIC COMPOSITE | 24,940 SY | $7.12 | $178k | 3% |