| Item | Quantity | R1R & I Construction INC | R2Eagle Bridge CO | R3Miller Bros Const INC | R4Mosser Construction INC | R5Dot Construction CORP | % of bid |
|---|---|---|---|---|---|---|---|
| 513E10281 STRUCTURAL STEEL MEMBERS, LEVEL 4, AS PER PLAN | 98,394 LB | $2.05 | $1.78 | $1.90 | $2.17 | $2.25 | 24% |
| 511E21522 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE | 165 CY | $850 | $975 | $850 | $825 | $700 | 17% |
| 524E94704 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK | 36 FT | $1,797 | $1,000 | $850 | $600 | $500 | 8% |
| 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING |
| Item | Quantity | R1R & I Construction INC | R2Eagle Bridge CO | R3Miller Bros Const INC | R4Mosser Construction INC | R5Dot Construction CORP |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,000 | $1,500 | $2,000 | $10,000 | $5,000 |
| 202E23000 PAVEMENT REMOVED | 450 SY | $2.00 | $13.00 | $14.00 | $10.00 | $10.00 |
| 202E38000 GUARDRAIL REMOVED | 583 FT | $1.00 | $1.50 | $1.40 | $1.40 | $1.60 |
| 203E10000 EXCAVATION | 56 CY | $10.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 102 CY |
| $550 |
| $600 |
| $600 |
| $520 |
| $700 |
| 7% |
| 526E30001 REINFORCED CONCRETE APPROACH SLABS (T=17"), AS PER | 213 SY | $250 | $260 | $300 | $225 | $300 | 6% |
| 202E11002 STRUCTURE REMOVED, OVER 20 FOOT SPAN | 1 LS | $45,000 | $47,500 | $110,000 | $70,000 | $100,000 | 5% |
| 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN | 39,888 LB | $1.00 | $1.10 | $1.15 | $1.15 | $2.25 | 5% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 222 FT | $165 | $144 | $165 | $165 | $144 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $27,000 | $20,000 | $40,000 | $40,000 | $40,000 | 3% |
| 524E94702 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK | 107 FT | $236 | $300 | $235 | $240 | $300 | 3% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 87 CY | $202 | $301 | $202 | $300 | $300 | 2% |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 224 CY | $75.00 | $75.00 | $80.00 | $100 | $80.00 | 2% |
| 503E21301 UNCLASSIFIED EXCAVATION, AS PER PLAN | 1 LS | $16,000 | $65,000 | $60,000 | $95,000 | $10,000 | 2% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 77 CY | $201 | $286 | $201 | $285 | $285 | 2% |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 38 CF | $384 | $385 | $385 | $384 | $450 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $12,000 | $12,000 | $9,000 | $8,500 | $11,000 | 1% |
| 526E90010 TYPE A INSTALLATION | 91 FT | $125 | $125 | $150 | $200 | $150 | 1% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 4 EACH | $2,600 | $2,355 | $2,600 | $2,600 | $2,385 | 1% |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| 516E44101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 8 EACH | $1,200 | $2,000 | $1,200 | $1,600 | $1,400 | 1% |
| $35.00 |
| $16.00 |
| $20.00 |
| $20.00 |
| 203E20000 EMBANKMENT | 265 CY | $12.00 | $15.00 | $24.00 | $22.00 | $30.00 |
| 204E10000 SUBGRADE COMPACTION | 481 SY | $1.00 | $6.00 | $1.50 | $5.00 | $2.00 |
| 606E15101 GUARDRAIL, TYPE MGS WITH LONG POSTS, AS PER PLAN | 350 FT | $19.50 | $21.55 | $19.50 | $19.50 | $18.80 |
| 606E35003 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1, AS PER PLAN | 4 EACH | $2,275 | $1,954 | $2,275 | $2,275 | $2,275 |
| 659E10000 SEEDING AND MULCHING | 1,003 SY | $2.00 | $5.00 | $2.60 | $2.60 | $3.30 |
| 659E20000 COMMERCIAL FERTILIZER | 0.14 TON | $500 | $1,250 | $600 | $600 | $465 |
| 659E35000 WATER | 5 MGAL | $1.00 | $10.00 | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 81 FT | $10.00 | $12.00 | $13.00 | $13.00 | $20.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (3") | 194 SY | $27.00 | $15.03 | $15.00 | $15.00 | $15.00 |
| 304E20000 AGGREGATE BASE | 104 CY | $50.00 | $60.00 | $55.00 | $80.00 | $80.00 |
| 407E10000 TACK COAT | 62 GAL | $3.60 | $1.00 | $3.60 | $1.00 | $1.00 |
| 620E00500 DELINEATOR, POST GROUND MOUNTED | 4 EACH | $95.00 | $48.11 | $75.00 | $95.00 | $95.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, (BI-DIRECTIONAL) | 12 EACH | $8.50 | $8.52 | $8.50 | $8.50 | $7.85 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $100 | $55.13 | $65.00 | $100 | $85.00 |
| 630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT | 1 EACH | $150 | $150 | $65.00 | $150 | $130 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.12 MILE | $6,500 | $6,515 | $9,266 | $6,500 | $6,500 |
| 642E00300 CENTER LINE, TYPE 1 | 0.06 MILE | $13,000 | $13,030 | $15,018 | $13,000 | $13,000 |
| 253E02000 PAVEMENT REPAIR | 20 CY | $252 | $401 | $252 | $500 | $400 |
| 407E10000 TACK COAT | 20 GAL | $3.60 | $1.00 | $3.60 | $1.00 | $1.00 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 10 CY | $285 | $291 | $285 | $290 | $290 |
| 616E10000 WATER | 1 MGAL | $1.00 | $25.00 | $125 | $330 | $1.00 |
| 617E10100 COMPACTED AGGREGATE | 50 CY | $23.20 | $60.00 | $60.00 | $52.00 | $60.00 |
| 202E22900 APPROACH SLAB REMOVED | 80 SY | $50.00 | $40.00 | $37.50 | $55.00 | $25.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $100 | $40,000 | $1.00 | $5,000 | $10,000 |
| 511E33500 SEMI-INTEGRAL DIAPHRAGM GUIDE | 2 EACH | $1,000 | $4,250 | $2,500 | $2,800 | $2,500 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 143 SY | $25.00 | $30.00 | $25.00 | $20.00 | $20.00 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 816 EACH | $3.60 | $4.00 | $3.85 | $3.60 | $7.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 91 SF | $4.00 | $12.00 | $8.00 | $10.00 | $10.00 |
| 516E14021 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL, AS PE | 127 FT | $25.00 | $32.00 | $28.00 | $45.00 | $30.00 |
| 518E21230 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 1 LS | $1,000 | $6,500 | $6,000 | $8,000 | $10,000 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 250 FT | $10.00 | $14.00 | $14.00 | $19.00 | $20.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 132 FT | $10.00 | $14.00 | $8.00 | $18.00 | $15.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 80 FT | $10.00 | $14.00 | $16.00 | $18.00 | $15.00 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $4,400 | $6,000 | $3,000 | $4,250 | $15,000 |
| 619E16010 FIELD OFFICE, TYPE B | 5 MNTH | $400 | $1,250 | $2,400 | $2,100 | $2,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,500 | $7,000 | $5,000 | $9,500 | $10,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 513E10281 STRUCTURAL STEEL MEMBERS, LEVEL 4, AS PER PLAN | 98,394 LB | $2.05 | $202k | 22% |
| 511E21522 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE | 165 CY | $850 | $140k | 16% |
| 524E94704 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK | 36 FT | $1,797 | $65k | 7% |
| 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING | 102 CY | $550 | $56k | 6% |
| 526E30001 REINFORCED CONCRETE APPROACH SLABS (T=17"), AS PER | 213 SY | $250 | $53k | 6% |
| 202E11002 STRUCTURE REMOVED, OVER 20 FOOT SPAN | 1 LS | $45,000 | $45k | 5% |
| 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN | 39,888 LB | $1 | $40k | 4% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 222 FT | $165 | $37k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $27,000 | $27k | 3% |
| 524E94702 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK | 107 FT | $236 | $25k | 3% |