ROS-US 23-02.50 OH17-01
ROS County · est $0.8M
Bid dateThursday, March 12—
ROS County · est $0.8M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 27 more items below.
| Item | Quantity | R1Amaazz Construction Ohio LLC | R2D G M INC | R3Allard Excavation LLC | R4Beaver Excavating Company | R5Sunesis Construction CO | R6Shelly & Sands INC | R7Trucco Construction CO INC | R8Complete General Construction Company | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|
| 203E10001 EXCAVATION, AS PER PLAN | 31,479 CY | $11.90 | $9.50 | $12.25 | $13.00 | $16.55 | $15.00 | $17.50 | $19.00 | 58% |
| 601E38101 PAVED GUTTER, TYPE 1-6, AS PER PLAN | 815 FT | $44.40 | $110 | $54.00 | $100 | $69.00 |
| Item | Quantity | R1Amaazz Construction Ohio LLC | R2D G M INC | R3Allard Excavation LLC | R4Beaver Excavating Company | R5Sunesis Construction CO | R6Shelly & Sands INC | R7Trucco Construction CO INC | R8Complete General Construction Company |
|---|---|---|---|---|---|---|---|---|---|
| 202E35100 PIPE REMOVED, 24" AND UNDER | 64 FT | $16.80 | $15.00 | $8.50 | $15.00 | $2.00 | $8.50 | $12.00 | $19.00 |
| 202E98100 REMOVAL MISC.: WOOD BOLLARD | 8 EACH | $113 | $20.00 | $9.34 | $35.00 | $9.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $78.00 |
| $67.00 |
| $90.00 |
| 6% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $30,128 | $40,000 | $15,000 | $33,000 | $13,116 | $44,240 | $45,000 | $40,000 | 5% |
| 670E00500 SLOPE EROSION PROTECTION | 10,180 SY | $2.60 | $2.50 | $2.30 | $1.90 | $2.65 | $1.90 | $1.90 | $1.95 | 4% |
| 832E30000 EROSION CONTROL | 25,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 4% |
| 659E00300 TOPSOIL | 1,161 CY | $20.50 | $15.00 | $11.00 | $8.00 | $6.02 | $31.50 | $13.00 | $26.00 | 4% |
| 896E00021 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 12 SNMT | $1,710 | $900 | $850 | $900 | $900 | $900 | $900 | $1,000 | 3% |
| 622E41000 PORTABLE BARRIER, 32" | 855 FT | $22.80 | $20.00 | $13.00 | $50.00 | $20.00 | $25.00 | $20.00 | $26.00 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $16,363 | $20,000 | $100,000 | $20,000 | $38,502 | $20,000 | $20,000 | $40,000 | 3% |
| 619E16000 FIELD OFFICE, TYPE A | 6 MNTH | $2,415 | $700 | $1,200 | $2,500 | $1,728 | $2,750 | $2,000 | $2,300 | 2% |
| 659E00540 SEEDING AND MULCHING, CLASS 3C | 10,452 SY | $1.30 | $1.10 | $1.15 | $0.85 | $0.98 | $0.81 | $0.81 | $2.19 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $11,453 | $82,500 | $13,105 | $8,000 | $13,035 | $15,000 | $20,000 | $20,000 | 2% |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $6,841 | $4,000 | $11,213 | $6,000 | $3,995 | $35,000 | $10,000 | $13,000 | 1% |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 51 SY | $132 | $75.00 | $77.80 | $110 | $131 | $133 | $150 | $80.00 | 1% |
| 202E32600 GUTTER REMOVED | 703 FT | $6.90 | $3.00 | $6.23 | $7.00 | $4.00 | $4.50 | $5.00 | $10.00 | 1% |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 0.47 MILE | $9,600 | $10,000 | $8,425 | $8,425 | $8,425 | $8,425 | $6,700 | $8,425 | 1% |
| 611E10600 24" CONDUIT, TYPE C | 30 FT | $138 | $100 | $213 | $70.00 | $109 | $88.00 | $95.00 | $280 | 1% |
| 614E12336 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL) | 1 EACH | $3,170 | $2,000 | $1,900 | $2,780 | $1,800 | $2,780 | $1,800 | $1,900 | 0% |
| 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL) | 1 EACH | $3,170 | $2,000 | $1,900 | $2,780 | $1,900 | $2,780 | $1,900 | $2,200 | 0% |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 24 CY | $124 | $85.00 | $55.43 | $95.00 | $92.27 | $86.00 | $95.00 | $112 | 0% |
| $75.00 |
| $60.00 |
| $50.00 |
| 203E20000 EMBANKMENT | 8 CY | $8.40 | $50.00 | $24.43 | $1.00 | $7.20 | $24.50 | $25.00 | $40.00 |
| 623E40520 RIGHT-OF-WAY MONUMENT | 1 EACH | $719 | $250 | $442 | $250 | $705 | $314 | $300 | $350 |
| 690E50600 SPECIAL - BOLLARD | 8 EACH | $369 | $400 | $230 | $730 | $450 | $425 | $400 | $100 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 22 CY | $126 | $85.00 | $61.66 | $95.00 | $91.03 | $91.00 | $92.00 | $120 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $68.40 | $100 | $60.00 | $100 | $370 | $100 | $100 | $200 |
| 659E20000 COMMERCIAL FERTILIZER | 1.4 TON | $456 | $650 | $400 | $605 | $440 | $605 | $605 | $500 |
| 659E31000 LIME | 2.2 ACRE | $85.50 | $80.00 | $75.00 | $75.00 | $230 | $75.00 | $75.00 | $200 |
| 659E35000 WATER | 56 MGAL | $1.10 | $1.00 | $1.00 | $1.00 | $5.00 | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 0.43 CY | $3,079 | $1,500 | $2,258 | $1,750 | $4,264 | $2,750 | $4,000 | $3,100 |
| 611E98690 CATCH BASIN, MISC.: CONNECT 24" CONDUIT TO EXISTIN | 1 EACH | $2,027 | $1,250 | $1,753 | $750 | $695 | $2,000 | $2,500 | $3,500 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 11 EACH | $131 | $50.00 | $173 | $135 | $65.00 | $115 | $140 | $55.00 |
| 630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT | 11 EACH | $222 | $50.00 | $173 | $235 | $95.00 | $195 | $230 | $145 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.27 MILE | $4,440 | $5,000 | $3,895 | $3,895 | $3,895 | $3,895 | $955 | $3,895 |
| 642E00204 LANE LINE, 6", TYPE 1 | 0.44 MILE | $2,389 | $3,000 | $2,095 | $2,095 | $2,095 | $2,095 | $685 | $2,095 |
| 642E00300 CENTER LINE, TYPE 1 | 0.04 MILE | $14,537 | $15,000 | $11,590 | $12,759 | $12,750 | $12,750 | $2,150 | $12,750 |
| 642E00500 STOP LINE, TYPE 1 | 40 FT | $14.30 | $12.50 | $12.50 | $12.50 | $12.50 | $12.50 | $5.00 | $12.50 |
| 642E01510 DOTTED LINE, 6", TYPE 1 | 147 FT | $4.00 | $4.00 | $3.50 | $3.50 | $3.50 | $3.50 | $1.00 | $3.50 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 30 HOUR | $85.50 | $60.00 | $75.00 | $65.00 | $87.00 | $65.00 | $80.00 | $81.00 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL) | 18 EACH | $28.50 | $15.00 | $15.00 | $25.00 | $35.84 | $9.00 | $11.00 | $20.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 18 EACH | $34.20 | $15.00 | $15.00 | $30.00 | $43.01 | $14.00 | $13.00 | $21.00 |
| 614E24400 WORK ZONE DOTTED LINE, CLASS I, 4", 740.06, TYPE I | 485 FT | $1.70 | $1.50 | $1.50 | $1.50 | $1.50 | $1.50 | $2.00 | $1.50 |
| 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I | 15 FT | $14.30 | $12.50 | $12.50 | $12.50 | $12.50 | $12.50 | $9.00 | $12.50 |
| 614E30400 WORK ZONE ARROW, CLASS I, 740.06, TYPE I | 2 EACH | $200 | $175 | $350 | $175 | $175 | $175 | $100 | $175 |
| 616E10000 WATER | 10 MGAL | $40.40 | $1.00 | $1.00 | $35.00 | $11.77 | $25.00 | $70.00 | $550 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $1,710 | $18,500 | $18,000 | $5,000 | $5,144 | $5,500 | $9,800 | $9,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 203E10001 EXCAVATION, AS PER PLAN | 31,479 CY | $11.9 | $375k | 55% |
| 601E38101 PAVED GUTTER, TYPE 1-6, AS PER PLAN | 815 FT | $44.4 | $36k | 5% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $30,128 | $30k | 4% |
| 670E00500 SLOPE EROSION PROTECTION | 10,180 SY | $2.6 | $26k | 4% |
| 832E30000 EROSION CONTROL | 25,000 EACH | $1 | $25k | 4% |
| 659E00300 TOPSOIL | 1,161 CY | $20.5 | $24k | 4% |
| 896E00021 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 12 SNMT | $1,710 | $21k | 3% |
| 622E41000 PORTABLE BARRIER, 32" | 855 FT | $22.8 | $19k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $16,363 | $16k | 2% |
| 619E16000 FIELD OFFICE, TYPE A | 6 MNTH | $2,415 | $14k | 2% |