| Item | Quantity | R1Miller Bros Const INC | R2Dot Construction CORP | R3Bcc Ohio INC | R4R & I Construction INC | % of bid |
|---|---|---|---|---|---|---|
| 511E34410 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 60 CY | $1,500 | $900 | $1,121 | $1,000 | 17% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $60,000 | $50,000 | $68,455 | $175,000 | 11% |
| 526E25001 REINFORCED CONCRETE APPROACH SLABS (T=15"), AS PER | 172 SY | $300 | $300 | $310 | $240 | 10% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 251 FT | $165 | $147 | $154 | $165 | 8% |
| Item | Quantity | R1Miller Bros Const INC | R2Dot Construction CORP | R3Bcc Ohio INC | R4R & I Construction INC |
|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 473 SY | $13.00 | $10.00 | $13.15 | $5.00 |
| 202E23901 CONCRETE BASE REMOVED, AS PER PLAN | 63 SY | $15.00 | $20.00 | $13.66 | $10.00 |
| 202E32500 CURB AND GUTTER REMOVED | 282 FT | $8.00 | $10.00 | $4.58 | $3.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 10 FT | $50.00 | $30.00 | $19.20 | $3.00 |
| 202E38000 GUARDRAIL REMOVED |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 848E10201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 424 SY | $88.00 | $120 | $91.08 | $55.00 | 7% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 424 SY | $88.00 | $120 | $94.27 | $100 | 7% |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 1,225 EACH | $24.00 | $30.00 | $12.86 | $10.00 | 6% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 22,280 LB | $1.25 | $1.50 | $1.28 | $2.00 | 5% |
| 511E45710 CLASS QC1 CONCRETE, ABUTMENT | 22 CY | $1,200 | $900 | $1,380 | $1,500 | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 114 CY | $178 | $255 | $268 | $178 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $28,750 | $31,313 | $50,000 | 4% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 73 CY | $246 | $360 | $378 | $246 | 3% |
| 519E11900 SPECIAL - PATCHING CONCRETE STRUCTURE WITH HIGH EA | 4 CY | $3,500 | $1,000 | $5,484 | $1,000 | 3% |
| 526E90010 TYPE A INSTALLATION | 66 FT | $175 | $150 | $202 | $150 | 2% |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 104 CY | $100 | $100 | $117 | $75.00 | 2% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 3 EACH | $2,700 | $2,265 | $2,378 | $2,700 | 2% |
| 512E73501 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE | 596 SY | $12.50 | $12.00 | $9.37 | $16.00 | 1% |
| 304E20000 AGGREGATE BASE | 94 CY | $75.00 | $80.00 | $94.89 | $50.00 | 1% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $7,000 | $15,000 | $2,460 | $3,750 | 1% |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 3 EACH | $2,275 | $1,980 | $2,079 | $2,275 | 1% |
| 225 FT |
| $1.40 |
| $1.80 |
| $1.89 |
| $1.40 |
| 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A | 2 EACH | $275 | $275 | $289 | $275 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 1 EACH | $175 | $95.00 | $99.75 | $175 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 4 EACH | $100 | $100 | $233 | $100 |
| 202E58100 CATCH BASIN REMOVED | 2 EACH | $550 | $400 | $218 | $100 |
| 202E98100 REMOVAL MISC.: DRIVE APPROACH | 2 EACH | $850 | $500 | $430 | $100 |
| 203E10000 EXCAVATION | 84 CY | $25.00 | $20.00 | $9.60 | $20.00 |
| 204E10000 SUBGRADE COMPACTION | 667 SY | $2.00 | $2.00 | $1.44 | $2.00 |
| 606E15051 GUARDRAIL, TYPE MGS, AS PER PLAN | 125 FT | $16.50 | $19.20 | $20.16 | $16.50 |
| 606E20050 ROUNDED END SECTION | 1 EACH | $300 | $75.00 | $78.75 | $300 |
| 606E35003 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1, AS PER PLAN | 1 EACH | $2,275 | $2,185 | $2,294 | $2,275 |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 225 FT | $28.00 | $40.00 | $38.94 | $18.00 |
| 690E50000 SPECIAL - MAILBOX SUPPORT | 2 EACH | $164 | $164 | $172 | $125 |
| 653E10000 TOPSOIL FURNISHED AND PLACED | 15 CY | $40.00 | $60.00 | $43.60 | $100 |
| 659E10000 SEEDING AND MULCHING | 667 SY | $3.40 | $3.90 | $4.10 | $5.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.1 TON | $470 | $397 | $417 | $500 |
| 659E35000 WATER | 4 MGAL | $10.00 | $1.00 | $1.05 | $1.00 |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E04600 12" CONDUIT, TYPE C, 706.02 | 5 FT | $200 | $100 | $164 | $100 |
| 611E07600 18" CONDUIT, TYPE C, 706.02 | 5 FT | $200 | $100 | $188 | $100 |
| 611E98180 CATCH BASIN, NO. 3A | 2 EACH | $3,000 | $2,000 | $2,879 | $2,500 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 500 SY | $8.50 | $8.00 | $11.94 | $8.50 |
| 407E20000 NON-TRACKING TACK COAT | 130 GAL | $2.75 | $1.00 | $1.05 | $2.75 |
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 36 SY | $90.00 | $100 | $102 | $75.00 |
| 617E10100 COMPACTED AGGREGATE | 15 CY | $60.00 | $100 | $88.20 | $27.00 |
| 202E22900 APPROACH SLAB REMOVED | 80 SY | $40.00 | $40.00 | $56.86 | $50.00 |
| 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN | 61 CY | $75.00 | $50.00 | $112 | $246 |
| 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR | 100 LB | $2.00 | $2.50 | $1.28 | $2.00 |
| 511E60000 SPECIAL - BRIDGE DECK GROOVING | 558 SY | $5.00 | $10.00 | $6.83 | $7.00 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 103 SY | $12.50 | $10.00 | $21.86 | $10.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 64 SF | $7.00 | $10.00 | $0.66 | $5.00 |
| 516E31000 JOINT SEALER, 705.04 | 240 FT | $9.00 | $10.00 | $13.85 | $5.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 25 CY | $90.00 | $70.00 | $86.64 | $100 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 295 FT | $17.00 | $15.00 | $10.07 | $10.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 111 FT | $10.00 | $15.00 | $7.21 | $10.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 20 FT | $25.00 | $15.00 | $6.79 | $10.00 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 50 SF | $125 | $100 | $95.00 | $80.00 |
| 601E20000 CRUSHED AGGREGATE SLOPE PROTECTION | 6 SY | $110 | $200 | $107 | $70.00 |
| 848E30201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE | 10 CY | $300 | $400 | $300 | $500 |
| 848E50000 HAND CHIPPING | 80 SY | $80.00 | $100 | $194 | $100 |
| 848E50100 TEST SLAB | 1 LS | $1,800 | $2,000 | $1,092 | $1,000 |
| 848E50300 WEARING COURSE REMOVED, ASPHALT | 450 SY | $11.00 | $15.00 | $7.48 | $15.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,000 | $7,000 | $8,230 | $8,400 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,750 | $5,000 | $2,124 | $1,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 511E34410 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 60 CY | $1,500 | $90k | 14% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $60,000 | $60k | 9% |
| 526E25001 REINFORCED CONCRETE APPROACH SLABS (T=15"), AS PER | 172 SY | $300 | $52k | 8% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 251 FT | $165 | $41k | 7% |
| 848E10201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR | 424 SY | $88 | $37k | 6% |
| 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION | 424 SY | $88 | $37k | 6% |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 1,225 EACH | $24 | $29k | 5% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 22,280 LB | $1.25 | $28k | 4% |
| 511E45710 CLASS QC1 CONCRETE, ABUTMENT | 22 CY | $1,200 | $26k | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 114 CY | $178 | $20k | 3% |