| Item | Quantity | R1Buds INC | R2George J Igel & CO INC | R3Shelly & Sands INC | R4Complete General Construction Company | % of bid |
|---|---|---|---|---|---|---|
| 515E12071 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 6 EACH | $23,000 | $24,500 | $22,409 | $23,000 | 26% |
| 511E31610 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 51 CY | $1,200 | $910 | $1,350 | $810 | 11% |
| 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING | 86 CY | $427 | $600 | $800 | $840 | 7% |
| 507E00650 14" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 1,050 FT | $34.00 | $29.00 | $26.00 | $35.00 |
| Item | Quantity | R1Buds INC | R2George J Igel & CO INC | R3Shelly & Sands INC | R4Complete General Construction Company |
|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,000 | $10,000 | $5,000 | $20,000 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 55 FT | $30.00 | $10.00 | $6.00 | $40.00 |
| 202E38000 GUARDRAIL REMOVED | 119 FT | $2.00 | $2.30 | $3.00 | $2.30 |
| 202E75250 GATE REMOVED | 2 EACH | $200 | $195 | $70.00 | $195 |
| 203E10000 EXCAVATION |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 7% |
| 203E20000 EMBANKMENT | 1,698 CY | $20.00 | $20.00 | $28.00 | $20.00 | 6% |
| 526E15000 REINFORCED CONCRETE APPROACH SLABS (T=13") | 107 SY | $272 | $270 | $250 | $275 | 5% |
| 304E20000 AGGREGATE BASE | 250 CY | $102 | $75.00 | $75.00 | $60.00 | 5% |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $24,000 | $10,000 | $14,018 | $15,000 | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 134 CY | $173 | $180 | $195 | $173 | 4% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 162 FT | $130 | $124 | $130 | $135 | 4% |
| 202E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN | 1 LS | $20,000 | $32,600 | $30,000 | $69,000 | 4% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 14,134 LB | $1.08 | $1.10 | $1.20 | $1.10 | 3% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (57 CY | $215 | $200 | $265 | $215 | 2% |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 126 CY | $88.00 | $70.00 | $65.00 | $110 | 2% |
| 202E23000 PAVEMENT REMOVED | 1,091 SY | $10.00 | $10.00 | $8.00 | $7.00 | 2% |
| 606E15050 GUARDRAIL, TYPE MGS | 600 FT | $16.00 | $16.00 | $17.00 | $16.00 | 2% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 41 CY | $215 | $330 | $265 | $215 | 2% |
| 526E90010 TYPE A INSTALLATION | 48 FT | $174 | $160 | $155 | $200 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $8,000 | $20,000 | $20,000 | $20,000 | 1% |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 4 EACH | $1,950 | $2,025 | $2,100 | $2,025 | 1% |
| 415 CY |
| $11.00 |
| $20.00 |
| $14.00 |
| $20.00 |
| 204E10000 SUBGRADE COMPACTION | 1,689 SY | $2.50 | $6.00 | $3.00 | $3.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 102 CY | $10.00 | $14.00 | $23.00 | $20.00 |
| 204E30020 GRANULAR MATERIAL, TYPE C | 51 CY | $50.00 | $58.00 | $81.00 | $85.00 |
| 204E45000 PROOF ROLLING | 1 HOUR | $50.00 | $76.00 | $207 | $200 |
| 204E50000 GEOTEXTILE FABRIC | 154 SY | $1.00 | $2.50 | $3.00 | $5.00 |
| 606E25550 ANCHOR ASSEMBLY, MGS TYPE A | 3 EACH | $1,200 | $1,150 | $1,300 | $1,150 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 2 EACH | $950 | $980 | $1,100 | $980 |
| 623E40520 RIGHT-OF-WAY MONUMENT | 1 EACH | $750 | $800 | $250 | $300 |
| 659E00300 TOPSOIL | 298 CY | $12.00 | $17.00 | $25.00 | $20.00 |
| 659E00510 SEEDING AND MULCHING, CLASS 2 | 2,539 SY | $1.10 | $3.00 | $2.00 | $1.13 |
| 659E20000 COMMERCIAL FERTILIZER | 0.34 TON | $500 | $600 | $600 | $600 |
| 659E31000 LIME | 0.52 ACRE | $200 | $75.00 | $80.00 | $75.00 |
| 659E35000 WATER | 7.2 MGAL | $1.00 | $1.00 | $1.00 | $1.00 |
| 670E00700 DITCH EROSION PROTECTION | 87 SY | $3.50 | $2.50 | $3.00 | $2.50 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,500 | $1,500 | $1,588 | $1,500 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $1,900 | $5,250 | $4,300 | $5,500 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $2,500 | $2,200 | $2,500 | $2,500 |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 836E10000 SEEDING AND EROSION CONTROL WITH TURF REINFORCING | 35 SY | $16.00 | $15.00 | $16.00 | $15.00 |
| 605E31100 AGGREGATE DRAINS | 198 FT | $15.00 | $22.00 | $16.00 | $14.26 |
| 611E04900 12" CONDUIT, TYPE D | 55 FT | $45.00 | $48.00 | $44.00 | $120 |
| 407E10000 TACK COAT | 95 GAL | $1.85 | $5.00 | $4.00 | $1.85 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 52 CY | $118 | $75.00 | $90.00 | $75.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BI-DIRECTIONAL | 14 EACH | $8.00 | $7.45 | $8.00 | $7.45 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 97 FT | $11.00 | $13.00 | $14.00 | $13.00 |
| 630E80100 SIGN, FLAT SHEET | 47 SF | $18.00 | $22.00 | $23.00 | $22.00 |
| 630E85000 REMOVAL OF GROUND MOUNTED SIGN AND STORAGE | 3 EACH | $10.00 | $15.00 | $16.00 | $15.00 |
| 630E86006 REMOVAL OF GROUND MOUNTED POST SUPPORT AND STORAGE | 3 EACH | $10.00 | $25.00 | $26.00 | $25.00 |
| 646E10200 CENTER LINE | 0.12 MILE | $29,880 | $29,682 | $42,000 | $22,590 |
| 614E12420 DETOUR SIGNING | 1 LS | $3,500 | $5,000 | $4,100 | $9,000 |
| 202E23500 WEARING COURSE REMOVED | 120 SY | $20.00 | $10.00 | $10.00 | $50.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $4,000 | $25,000 | $30,000 | $32,000 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $6,500 | $20,000 | $16,000 | $26,000 |
| 507E00600 14" CAST-IN-PLACE REINFORCED CONCRETE PILES, DRIVE | 980 FT | $3.00 | $16.50 | $24.00 | $30.00 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 104 SY | $18.00 | $23.50 | $25.00 | $23.50 |
| 512E33000 TYPE 2 WATERPROOFING | 12 SY | $42.00 | $25.00 | $30.00 | $85.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 36 SF | $12.00 | $18.00 | $17.00 | $20.00 |
| 516E14014 INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 79 FT | $30.00 | $30.00 | $32.00 | $40.00 |
| 516E42600 ELASTOMERIC BEARING PAD, MISC.: 6"x2" ELASTOMERIC | 49 FT | $120 | $63.00 | $114 | $111 |
| 516E43201 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY ( | 24 EACH | $145 | $170 | $138 | $181 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 59 CY | $90.00 | $115 | $80.00 | $100 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 182 FT | $15.00 | $30.00 | $10.00 | $13.50 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 96 FT | $12.00 | $8.00 | $4.00 | $12.00 |
| 518E40011 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 80 FT | $15.00 | $10.00 | $4.00 | $15.00 |
| 523E20000 DYNAMIC LOAD TESTING | 1 EACH | $3,800 | $6,000 | $4,000 | $6,000 |
| 523E20500 RESTRIKE | 1 EACH | $2,000 | $700 | $500 | $2,000 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,500 | $5,000 | $4,000 | $8,500 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $3,000 | $6,000 | $3,800 | $10,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $7,000 | $7,000 | $15,000 | $5,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 515E12071 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 6 EACH | $23,000 | $138k | 21% |
| 511E31610 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 51 CY | $1,200 | $61k | 9% |
| 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING | 86 CY | $427 | $37k | 5% |
| 507E00650 14" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 1,050 FT | $34 | $36k | 5% |
| 203E20000 EMBANKMENT | 1,698 CY | $20 | $34k | 5% |
| 526E15000 REINFORCED CONCRETE APPROACH SLABS (T=13") | 107 SY | $272 | $29k | 4% |
| 304E20000 AGGREGATE BASE | 250 CY | $102 | $26k | 4% |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $24,000 | $24k | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 134 CY | $172.5 | $23k | 3% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 162 FT | $130 | $21k | 3% |