ATB-Culverts FY2020
ATB County · est $0.4M
Bid dateThursday, March 26—
ATB County · est $0.4M
Published by ODOTon this contract’s Proposal PDF · EDGE Goal: 6.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 31 more items below.
| Item | Quantity | R1Americon Industrial Services LLC | R2Rudzik Excavating INC | R3Eclipse CO LLC | R4Bog Construction INC | R5Catts Construction INC | R6S E T INC | R7Jet Excavating Company | R8Koski Construction CO | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|
| 832E30000 EROSION CONTROL | 56,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 20% |
| 833E10000 CONDUIT RENEWAL USING SPRAY APPLIED STRUCTURAL LIN | 100 FT | $480 | $600 |
| Item | Quantity | R1Americon Industrial Services LLC | R2Rudzik Excavating INC | R3Eclipse CO LLC | R4Bog Construction INC | R5Catts Construction INC | R6S E T INC | R7Jet Excavating Company | R8Koski Construction CO |
|---|---|---|---|---|---|---|---|---|---|
| 202E23010 PAVEMENT REMOVED, ASPHALT | 264 SY | $6.00 | $10.00 | $10.50 | $35.00 | $24.50 | $14.00 | $12.00 | $10.00 |
| 202E35200 PIPE REMOVED, OVER 24" | 103 FT | $30.00 | $40.00 | $47.50 | $40.00 | $13.50 | $5.00 | $100 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $755 |
| $950 |
| $1,057 |
| $960 |
| $880 |
| $1,300 |
| 17% |
| 611E22200 54" CONDUIT, TYPE A, 706.01, (707.01 OR 707.02) AL | 100 FT | $285 | $610 | $315 | $600 | $457 | $300 | $690 | $700 | 10% |
| 602E20000 CONCRETE MASONRY | 21.6 CY | $1,150 | $1,220 | $799 | $600 | $1,230 | $1,400 | $1,750 | $1,000 | 9% |
| 624E10000 MOBILIZATION | 1 LS | $16,000 | $17,395 | $15,000 | $15,000 | $13,000 | $37,695 | $20,000 | $10,000 | 6% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 75 CY | $205 | $226 | $219 | $215 | $256 | $248 | $265 | $206 | 6% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 53 CY | $245 | $270 | $315 | $325 | $334 | $330 | $335 | $315 | 5% |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $1,500 | $200 | $525 | $500 | $1,765 | $766 | $1,200 | $1,500 | 3% |
| 659E00300 TOPSOIL | 215 CY | $35.00 | $27.00 | $44.00 | $30.00 | $60.00 | $70.00 | $30.00 | $30.00 | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T=3") | 631 SY | $11.00 | $13.20 | $11.85 | $12.00 | $18.50 | $14.00 | $13.00 | $10.00 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,000 | $4,000 | $11,500 | $8,500 | $4,700 | $7,200 | $15,000 | $5,000 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $6,000 | $3,200 | $7,866 | $4,000 | $7,850 | $9,840 | $30,000 | $25,000 | 2% |
| 201E11000 CLEARING AND GRUBBING (ATB-45-0684) | 1 LS | $5,000 | $4,200 | $6,400 | $3,000 | $3,035 | $2,800 | $2,500 | $3,500 | 2% |
| 201E11000 CLEARING AND GRUBBING (ATB-7-2060) | 1 LS | $5,000 | $6,500 | $7,000 | $3,000 | $800 | $5,000 | $3,000 | $2,500 | 2% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 20 CY | $250 | $10.00 | $189 | $150 | $175 | $358 | $100 | $150 | 2% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING (ATB-7-2060) | 1 LS | $5,000 | $7,300 | $7,500 | $5,000 | $4,700 | $12,625 | $10,000 | $15,000 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,000 | $2,750 | $14,000 | $4,000 | $2,300 | $3,000 | $2,500 | $3,500 | 2% |
| 659E10000 SEEDING AND MULCHING | 1,940 SY | $2.55 | $3.00 | $2.55 | $4.00 | $1.25 | $3.00 | $1.00 | $1.00 | 2% |
| 203E20000 EMBANKMENT | 399 CY | $12.00 | $47.00 | $10.50 | $35.00 | $32.00 | $15.00 | $25.00 | $25.00 | 2% |
| 614E12420 DETOUR SIGNING | 1 LS | $3,130 | $3,500 | $6,600 | $4,500 | $3,800 | $1,450 | $3,000 | $6,500 | 1% |
| $10.00 |
| 202E38000 GUARDRAIL REMOVED | 511 FT | $2.00 | $3.00 | $4.00 | $3.00 | $3.00 | $5.00 | $3.00 | $3.00 |
| 202E75000 FENCE REMOVED | 145 FT | $3.25 | $4.00 | $4.00 | $10.00 | $0.25 | $5.00 | $4.00 | $5.00 |
| 203E10000 EXCAVATION | 40 CY | $20.00 | $47.00 | $32.50 | $50.00 | $16.00 | $50.00 | $15.00 | $20.00 |
| 203E35120 GRANULAR MATERIAL, TYPE C, 703.16 | 31 CY | $80.00 | $95.00 | $58.50 | $90.00 | $63.00 | $70.00 | $65.00 | $50.00 |
| 204E10000 SUBGRADE COMPACTION | 288 SY | $2.00 | $3.00 | $3.00 | $5.00 | $1.00 | $2.00 | $2.00 | $10.00 |
| 204E50000 GEOTEXTILE FABRIC, TYPE D | 62 SY | $5.00 | $12.00 | $2.00 | $10.00 | $3.00 | $3.00 | $5.00 | $2.00 |
| 209E60200 LINEAR GRADING | 6 STA | $120 | $100 | $506 | $100 | $415 | $700 | $525 | $200 |
| 623E40000 MONUMENT ASSEMBLY REMOVED AND RESET | 1 EACH | $1,250 | $1,700 | $523 | $2,700 | $800 | $750 | $975 | $1,500 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 1 EACH | $250 | $225 | $169 | $500 | $121 | $330 | $350 | $200 |
| 601E10000 RIPRAP | 8 SY | $250 | $300 | $265 | $165 | $324 | $330 | $625 | $250 |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 11 CY | $105 | $185 | $96.50 | $250 | $241 | $101 | $300 | $200 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 8 CY | $115 | $175 | $102 | $500 | $608 | $550 | $525 | $200 |
| 659E14000 REPAIR SEEDING AND MULCHING | 97 SY | $0.30 | $2.00 | $0.35 | $1.00 | $3.50 | $1.00 | $2.00 | $3.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.26 TON | $515 | $100 | $531 | $500 | $1,030 | $560 | $800 | $1,000 |
| 659E31000 LIME | 0.4 ACRE | $75.00 | $100 | $77.50 | $100 | $1,300 | $100 | $250 | $1.00 |
| 659E35000 WATER | 10 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $90.00 | $2.00 | $1.00 | $1.00 |
| 613E41200 LOW STRENGTH MORTAR BACKFILL | 10 CY | $105 | $165 | $536 | $130 | $911 | $825 | $750 | $650 |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 47 CY | $65.00 | $67.00 | $71.50 | $100 | $94.00 | $70.00 | $100 | $125 |
| 407E20000 NON-TRACKING TACK COAT | 93 GAL | $3.00 | $3.30 | $4.50 | $6.00 | $4.50 | $6.00 | $5.00 | $5.00 |
| 408E10001 PRIME COAT, AS PER PLAN | 31 GAL | $5.00 | $5.50 | $5.00 | $35.00 | $4.50 | $13.00 | $20.00 | $25.00 |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 5 CY | $100 | $330 | $134 | $325 | $400 | $330 | $315 | $250 |
| 621E00100 RPM | 3 EACH | $865 | $450 | $970 | $1,000 | $1,140 | $952 | $1,350 | $1,500 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 3 EACH | $10.00 | $50.00 | $13.50 | $100 | $30.00 | $50.00 | $25.00 | $10.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 45 FT | $14.80 | $16.50 | $20.00 | $50.00 | $18.00 | $40.00 | $15.00 | $35.00 |
| 630E80100 SIGN, FLAT SHEET, 730.20 | 6 SF | $78.00 | $90.00 | $27.00 | $50.00 | $95.00 | $44.00 | $80.00 | $100 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.07 MILE | $12,825 | $66,000 | $39,604 | $15,000 | $15,575 | $15,000 | $16,000 | $20,000 |
| 642E00300 CENTER LINE, TYPE 1 | 0.04 MILE | $17,100 | $67,100 | $39,599 | $15,000 | $20,769 | $18,875 | $16,000 | $20,000 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 2 SNMT | $950 | $1,300 | $1,020 | $1,200 | $1,150 | $770 | $800 | $1,000 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING (ATB-45-0684) | 1 LS | $500 | $2,000 | $7,500 | $2,400 | $1,820 | $1,650 | $2,500 | $20,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 832E30000 EROSION CONTROL | 56,000 EACH | $1 | $56k | 18% |
| 833E10000 CONDUIT RENEWAL USING SPRAY APPLIED STRUCTURAL LIN | 100 FT | $480 | $48k | 16% |
| 611E22200 54" CONDUIT, TYPE A, 706.01, (707.01 OR 707.02) AL | 100 FT | $285 | $29k | 9% |
| 602E20000 CONCRETE MASONRY | 21.6 CY | $1,150 | $25k | 8% |
| 624E10000 MOBILIZATION | 1 LS | $16,000 | $16k | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 75 CY | $205 | $15k | 5% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 53 CY | $245 | $13k | 4% |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $1,500 | $9k | 3% |
| 659E00300 TOPSOIL | 215 CY | $35 | $8k | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T=3") | 631 SY | $11 | $7k | 2% |