HAS-SR 258-00.00
HAS County · est $2.3M
Bid dateThursday, April 9—
HAS County · est $2.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 6.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 28 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Amaazz Construction Ohio LLC | R3Nls Paving, INC | % of bid |
|---|---|---|---|---|---|
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (5198 CY | $130 | $121 | $136 | 32% |
| 441E10101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), AS | 4,653 CY | $145 | $157 | $170 | 32% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $130,000 | $114,890 | $95,000 | 6% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (583 CY | $145 | $142 | $145 | 4% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 1,588 CY | $50.00 | $76.22 | $50.00 |
| Item | Quantity | R1Shelly & Sands INC | R2Amaazz Construction Ohio LLC | R3Nls Paving, INC |
|---|---|---|---|---|
| 202E30000 WALK REMOVED | 660 SF | $7.00 | $6.26 | $10.00 |
| 202E32000 CURB REMOVED | 126 FT | $8.50 | $4.92 | $18.00 |
| 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA | 15.84 MILE | $750 | $404 | $900 |
| 607E98000 FENCE, MISC.:TEMPORARY ORANGE PLASTIC CONSTRUCTION | 336 FT | $4.00 | $4.53 | $6.00 |
| 659E98000 SEEDING, MISC.:URB RAMP GRADING RESTORATION | 29 SY | $185 | $62.15 | $50.00 |
| 832E30000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 4% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 300 CY | $240 | $291 | $270 | 3% |
| 253E02000 PAVEMENT REPAIR | 214 CY | $270 | $280 | $280 | 3% |
| 646E10010 EDGE LINE, 6" | 17.78 MILE | $2,800 | $3,024 | $2,727 | 2% |
| 441E50401 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | — | $275 | $358 | $270 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $36,100 | $18,097 | $50,000 | 2% |
| 646E10200 CENTER LINE | 8.89 MILE | $3,500 | $4,019 | $3,400 | 1% |
| 407E10000 TACK COAT | 15,060 GAL | $2.00 | $2.07 | $1.80 | 1% |
| 408E10001 PRIME COAT, AS PER PLAN | 7,268 GAL | $3.75 | $3.73 | $3.40 | 1% |
| 621E00100 RPM | 1,034 EACH | $25.00 | $26.41 | $25.50 | 1% |
| 608E52000 CURB RAMP | 660 SF | $35.00 | $20.72 | $24.00 | 1% |
| 202E23500 WEARING COURSE REMOVED | 5,915 SY | $3.75 | $3.84 | $5.00 | 1% |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 19.08 MILE | $1,100 | $1,077 | $1,250 | 1% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (2-1/4") | 6,887 SY | $3.00 | $2.52 | $3.50 | 1% |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 28 CF | $525 | $427 | $515 | 1% |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 28 CF | $525 | $427 | $515 | 1% |
| 1,000 EACH |
| $1.00 |
| $1.00 |
| $1.00 |
| 605E31100 AGGREGATE DRAINS | 400 FT | $10.50 | $14.93 | $6.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1-1/4") | 1,070 SY | $10.00 | $5.85 | $10.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (3") | 666 SY | $9.00 | $7.09 | $10.00 |
| 407E20000 NON-TRACKING TACK COAT | 2,954 GAL | $3.00 | $3.73 | $3.10 |
| 617E20000 SHOULDER PREPARATION | 19,529 SY | $0.40 | $0.33 | $0.20 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 1,034 EACH | $7.00 | $7.91 | $10.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 14 FT | $35.00 | $33.66 | $10.00 |
| 630E80100 SIGN, FLAT SHEET | 18 SF | $47.50 | $46.61 | $15.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 2 EACH | $10.50 | $10.36 | $15.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $16.00 | $15.54 | $15.00 |
| 646E10400 STOP LINE | 24 FT | $16.50 | $13.47 | $16.00 |
| 646E10500 CROSSWALK LINE | 853 FT | $7.25 | $6.21 | $7.00 |
| 646E10501 CROSSWALK LINE, AS PER PLAN (24") | 46 FT | $13.50 | $13.47 | $13.00 |
| 646E20000 RAILROAD SYMBOL MARKING | 2 EACH | $650 | $880 | $608 |
| 646E20100 SCHOOL SYMBOL MARKING, 72" | 2 EACH | $650 | $880 | $608 |
| 614E12460 WORK ZONE MARKING SIGN | 56 EACH | $90.00 | $90.63 | $87.50 |
| 614E21500 WORK ZONE CENTER LINE, CLASS II, 642 PAINT | 19.08 MILE | $125 | $56.15 | $500 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 72 FT | $13.25 | $12.95 | $12.50 |
| 512E33010 TYPE 3 WATERPROOFING | 26 SY | $30.00 | $104 | $120 |
| 512E33010 TYPE 3 WATERPROOFING | 15 SY | $30.00 | $104 | $130 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $5,250 | $5,000 | $5,000 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $8,500 | $14,196 | $13,960 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (5198 CY | $130 | $676k | 30% |
| 441E10101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), AS | 4,653 CY | $145 | $675k | 30% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $130,000 | $130k | 6% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (583 CY | $145 | $85k | 4% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 1,588 CY | $50 | $79k | 4% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 300 CY | $240 | $72k | 3% |
| 253E02000 PAVEMENT REPAIR | 214 CY | $270 | $58k | 3% |
| 646E10010 EDGE LINE, 6" | 17.78 MILE | $2,800 | $50k | 2% |
| 441E50401 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | — | $275 | $43k | 2% |
| 624E10000 MOBILIZATION | 1 LS | $36,100 | $36k | 2% |