MAH-SR 170-08.25 (PART 1 AND PART 2)
MAH County · est $0.9M
Bid dateThursday, April 9—
MAH County · est $0.9M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 103 more items below.
| Item | Quantity | R1R T Vernal Paving & Excavating INC | R2Marucci & Gaffney Excavating CO | R3Karvo Companies INC | R4Shelly & Sands INC | R5S E T INC | R6Parella-pannunzio INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $85,000 | $50,000 | $59,000 | $66,000 | $70,000 | $140,000 | 16% |
| 848E20001 SURFACE PREPARATION USING HYDRODEMOLITION, AS PER | 687 SY | $77.00 | $77.00 | $77.00 | $81.00 | $81.00 | $77.00 | 10% |
| 848E10001 MICRO SILICA MODIFIED CONCRETE OVERLAY USING HYDRO | 687 SY | $75.00 |
| Item | Quantity | R1R T Vernal Paving & Excavating INC | R2Marucci & Gaffney Excavating CO | R3Karvo Companies INC | R4Shelly & Sands INC | R5S E T INC | R6Parella-pannunzio INC |
|---|---|---|---|---|---|---|---|
| 202E30000 WALK REMOVED | 2,877 SF | $3.75 | $2.00 | $1.70 | $1.00 | $2.50 | $1.50 |
| 202E58100 CATCH BASIN REMOVED | 5 EACH | $300 | $500 | $380 | $400 | $500 | $300 |
| 202E98100 REMOVAL MISC.: INSPECTION WELL | 1 EACH | $500 | $10.00 | $800 | $449 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $75.00 |
| $75.00 |
| $79.00 |
| $79.00 |
| $75.00 |
| 10% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 364 CY | $132 | $150 | $157 | $156 | $158 | $1.50 | 9% |
| 424E12001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B, AS P | 169 CY | $196 | $317 | $259 | $247 | $333 | $317 | 6% |
| 624E10000 MOBILIZATION | 1 LS | $25,000 | $20,000 | $32,000 | $20,000 | $54,950 | $68,000 | 5% |
| 611E04900 12" CONDUIT, TYPE D | 619 FT | $40.00 | $56.00 | $60.00 | $52.00 | $65.00 | $80.00 | 5% |
| 848E50321 EXISTING CONCRETE OVERLAY REMOVED, AS PER PLAN (T | 687 SY | $32.00 | $32.00 | $32.00 | $34.00 | $34.00 | $32.00 | 4% |
| 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING | 240 FT | $85.00 | $82.50 | $54.50 | $90.00 | $87.00 | $84.00 | 4% |
| 203E10000 EXCAVATION | 845 CY | $24.00 | $29.50 | $22.00 | $31.00 | $20.00 | $20.00 | 4% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (110 CY | $170 | $191 | $180 | $227 | $201 | $191 | 3% |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 1,203 FT | $15.00 | $5.00 | $9.70 | $15.00 | $12.00 | $9.00 | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (T = 1.25") | 4,706 SY | $3.50 | $2.75 | $2.45 | $3.50 | $3.00 | $2.75 | 3% |
| 608E10000 4" CONCRETE WALK | 2,877 SF | $5.50 | $7.00 | $5.85 | $7.00 | $6.00 | $7.00 | 3% |
| 611E98470 CATCH BASIN, NO. 2-2B | 9 EACH | $1,700 | $1,500 | $1,100 | $2,600 | $1,800 | $1,500 | 3% |
| 809E69000 ADVANCE RADAR DETECTION | 2 EACH | $7,500 | $7,500 | $7,500 | $8,000 | $8,800 | $7,500 | 3% |
| 619E16010 FIELD OFFICE, TYPE B | 12 MNTH | $1,200 | $300 | $1,700 | $1,600 | $1,800 | $1,700 | 3% |
| 809E69100 STOP LINE RADAR DETECTION | 2 EACH | $7,000 | $7,000 | $7,500 | $7,500 | $8,400 | $7,000 | 3% |
| 605E06020 4" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 1,342 FT | $10.00 | $10.50 | $10.50 | $15.00 | $12.00 | $12.00 | 2% |
| 690E98100 SPECIAL - REINFORCEMENT MESH FOR LONGITUDINAL JOIN | 734 FT | $18.00 | $16.00 | $15.10 | $20.00 | $16.00 | $16.00 | 2% |
| $125 |
| $500 |
| 202E98200 REMOVAL MISC.: CONDUIT | 10 FT | $20.00 | $5.00 | $38.50 | $44.00 | $8.00 | $50.00 |
| 203E20000 EMBANKMENT | 101 CY | $15.00 | $25.00 | $31.00 | $13.00 | $15.00 | $25.00 |
| 203E20001 EMBANKMENT, AS PER PLAN | 50 CY | $50.00 | $5.00 | $50.00 | $18.00 | $7.00 | $30.00 |
| 204E10000 SUBGRADE COMPACTION | 1,490 SY | $1.00 | $5.00 | $1.25 | $6.00 | $3.00 | $1.50 |
| 204E13000 EXCAVATION OF SUBGRADE | 15 CY | $40.00 | $50.00 | $30.00 | $23.00 | $15.00 | $35.00 |
| 204E30010 GRANULAR MATERIAL, TYPE B | 15 CY | $48.00 | $90.00 | $80.00 | $104 | $60.00 | $80.00 |
| 204E45000 PROOF ROLLING | 2 HOUR | $100 | $50.00 | $170 | $216 | $225 | $100 |
| 204E50000 GEOTEXTILE FABRIC 712.09, TYPE D | 35 SY | $4.00 | $10.00 | $1.55 | $1.00 | $2.00 | $3.00 |
| 204E51000 GEOGRID | 35 SY | $8.00 | $10.00 | $4.00 | $1.00 | $3.00 | $5.00 |
| 209E72000 PREPARING SUBGRADE FOR SHOULDER PAVING | 16 STA | $200 | $200 | $80.00 | $190 | $525 | $300 |
| 608E53020 DETECTABLE WARNING | 8 SF | $35.00 | $50.00 | $15.00 | $37.00 | $53.00 | $30.00 |
| 625E31510 PULL BOX REMOVED | 1 EACH | $200 | $500 | $200 | $370 | $200 | $100 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 5 EACH | $300 | $100 | $215 | $394 | $210 | $150 |
| 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1 | 2 SY | $300 | $250 | $617 | $372 | $275 | $200 |
| 659E00300 TOPSOIL | 392 CY | $25.00 | $25.00 | $40.00 | $39.00 | $67.00 | $45.00 |
| 659E10000 SEEDING AND MULCHING | 3,533 SY | $1.50 | $2.00 | $0.80 | $2.00 | $2.50 | $3.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 177 SY | $2.50 | $0.27 | $0.50 | $1.00 | $1.00 | $0.80 |
| 659E15000 INTER-SEEDING | 177 SY | $2.50 | $0.27 | $0.50 | $0.11 | $0.20 | $0.50 |
| 659E20000 COMMERCIAL FERTILIZER | 0.48 TON | $750 | $200 | $800 | $481 | $480 | $455 |
| 659E31000 LIME | 0.73 ACRE | $300 | $10.00 | $1.00 | $95.00 | $95.00 | $90.00 |
| 659E35000 WATER | 19 MGAL | $10.00 | $0.50 | $1.00 | $1.00 | $1.25 | $1.00 |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 1 CY | $1,000 | $1,500 | $1,650 | $1,900 | $2,200 | $1,500 |
| 605E05210 4" UNCLASSIFIED PIPE UNDERDRAINS WITH GEOTEXTILE F | 124 FT | $10.00 | $10.50 | $13.00 | $23.00 | $13.00 | $10.00 |
| 611E00410 4" CONDUIT, TYPE F FOR UNDERDRAIN OUTLET | 62 FT | $15.00 | $11.00 | $9.45 | $35.00 | $18.00 | $12.00 |
| 611E03100 10" CONDUIT, TYPE B 707.01, 707.04, 707.05 | 10 FT | $100 | $120 | $60.00 | $77.00 | $120 | $25.00 |
| 611E04401 12" CONDUIT, TYPE B, AS PER PLAN 707.01, 707.04, 7 | 172 FT | $35.00 | $90.00 | $81.00 | $77.00 | $130 | $90.00 |
| 611E04601 12" CONDUIT, TYPE C, AS PER PLAN | 35 FT | $50.00 | $85.00 | $82.00 | $67.00 | $80.00 | $100 |
| 611E06101 15" CONDUIT, TYPE C, AS PER PLAN | 241 FT | $45.00 | $65.00 | $58.00 | $58.00 | $76.00 | $85.00 |
| 611E07401 18" CONDUIT, TYPE B, AS PER PLAN 707.01, 707.04, 7 | 80 FT | $50.00 | $85.00 | $107 | $81.00 | $140 | $110 |
| 611E07601 18" CONDUIT, TYPE C, AS PER PLAN | 181 FT | $45.00 | $84.00 | $75.00 | $76.00 | $85.00 | $90.00 |
| 611E97400 CONDUIT, MISC.:TYPE B FOR DRAINAGE DISCHARGE CONTI | 10 FT | $100 | $10.00 | $70.00 | $73.00 | $22.00 | $50.00 |
| 611E97400 CONDUIT, MISC.:TYPE C FOR DRAINAGE DISCHARGE CONTI | 10 FT | $100 | $10.00 | $70.00 | $69.00 | $17.00 | $50.00 |
| 611E97400 CONDUIT, MISC.:TYPE E FOR DRAINAGE DISCHARGE CONTI | 10 FT | $100 | $10.00 | $58.00 | $69.00 | $17.00 | $50.00 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 1 EACH | $2,000 | $200 | $480 | $440 | $250 | $350 |
| 611E99720 INSPECTION WELL | 1 EACH | $1,000 | $20.00 | $2,200 | $760 | $500 | $500 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 1,500 FT | $3.00 | $2.50 | $2.00 | $4.00 | $3.00 | $2.50 |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 258 CY | $48.00 | $75.00 | $85.00 | $73.00 | $75.00 | $70.00 |
| 407E20000 NON-TRACKING TACK COAT | 196 GAL | $4.00 | $2.40 | $2.20 | $3.00 | $3.00 | $2.40 |
| 408E10001 PRIME COAT, AS PER PLAN | 206 GAL | $5.00 | $5.00 | $6.00 | $3.00 | $5.25 | $5.00 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 3 CY | $100 | $300 | $140 | $154 | $265 | $100 |
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 52 SY | $75.00 | $90.00 | $90.00 | $80.00 | $63.00 | $75.00 |
| 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 20 SY | $87.50 | $140 | $108 | $93.00 | $74.00 | $120 |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 29 CY | $60.00 | $200 | $135 | $150 | $163 | $300 |
| 621E00100 RPM | 46 EACH | $25.00 | $98.00 | $65.00 | $80.00 | $100 | $95.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 36 EACH | $10.00 | $5.00 | $1.75 | $5.00 | $11.00 | $15.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 78.5 FT | $10.00 | $15.00 | $10.00 | $17.00 | $17.00 | $15.00 |
| 630E08600 SIGN POST REFLECTOR | 4 EACH | $25.00 | $45.00 | $25.00 | $33.00 | $33.00 | $45.00 |
| 630E80100 SIGN, FLAT SHEET | 61.3 SF | $15.00 | $25.00 | $15.00 | $14.00 | $14.00 | $25.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 6 EACH | $25.00 | $10.00 | $25.00 | $30.00 | $29.00 | $10.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 4 EACH | $50.00 | $70.00 | $50.00 | $79.00 | $80.00 | $70.00 |
| 630E85200 REMOVAL OF GROUND MOUNTED SIGN AND DELIVERY | 2 EACH | $25.00 | $70.00 | $25.00 | $317 | $320 | $50.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 5 EACH | $25.00 | $10.00 | $25.00 | $36.00 | $35.00 | $10.00 |
| 630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT | 4 EACH | $50.00 | $125 | $50.00 | $116 | $116 | $125 |
| 630E97700 SIGNING, MISC.: SOLAR POWERED LED ENHANCED STOP ST | 2 EACH | $1,985 | $3,000 | $1,985 | $1,700 | $4,400 | $6,500 |
| 646E10010 EDGE LINE, 6" | 0.42 MILE | $6,500 | $6,500 | $6,500 | $10,000 | $6,850 | $6,500 |
| 646E10200 CENTER LINE | 0.18 MILE | $8,500 | $8,500 | $8,500 | $10,300 | $8,990 | $8,500 |
| 646E10300 CHANNELIZING LINE, 8" | 289 FT | $2.20 | $2.20 | $2.20 | $2.00 | $2.50 | $2.20 |
| 646E10400 STOP LINE | 59 FT | $12.00 | $12.00 | $12.00 | $11.00 | $13.00 | $12.00 |
| 646E10800 ISLAND MARKING | 10 SF | $6.00 | $6.00 | $6.00 | $5.00 | $6.50 | $6.00 |
| 646E20300 LANE ARROW | 3 EACH | $165 | $165 | $165 | $265 | $175 | $165 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 6 EACH | $400 | $400 | $400 | $53.00 | $50.00 | $400 |
| 632E90400 SIGNALIZATION, MISC.: RELOCATION OF VEHICULAR SIGN | 1 EACH | $1,200 | $300 | $1,200 | $325 | $815 | $1,200 |
| 633E99300 CONTROLLER ITEM, MISC.: CONTROLLER MODIFICIATION | 1 LS | $2,800 | $1,000 | $2,800 | $1,100 | $81.00 | $2,800 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 50 HOUR | $65.00 | $65.00 | $65.00 | $70.00 | $48.00 | $65.00 |
| 614E12460 WORK ZONE MARKING SIGN | 12 EACH | $85.00 | $50.00 | $85.00 | $106 | $91.00 | $300 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $200 | $70.00 | $220 | $150 | $300 | $300 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 6 SNMT | $900 | $950 | $900 | $800 | $1,040 | $1,500 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 0.57 MILE | $3,500 | $2,250 | $3,500 | $2,700 | $3,700 | $2,500 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.18 MILE | $3,000 | $4,000 | $3,000 | $5,300 | $3,150 | $5,000 |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" | 0.74 MILE | $1,750 | $1,000 | $1,750 | $1,100 | $1,850 | $1,000 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 0.42 MILE | $1,250 | $1,000 | $1,250 | $1,100 | $1,315 | $1,000 |
| 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, 8" | 289 FT | $0.75 | $1.00 | $0.75 | $1.00 | $1.00 | $1.00 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 289 FT | $0.50 | $1.00 | $0.50 | $1.00 | $1.00 | $1.00 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 70 FT | $3.50 | $3.00 | $3.50 | $3.00 | $3.75 | $3.00 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 59 FT | $3.50 | $3.00 | $3.50 | $3.00 | $3.75 | $3.00 |
| 616E10000 WATER | 3 MGAL | $100 | $1.00 | $5.00 | $294 | $5.00 | $1.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 630E83000 COVERING OF SIGN | 16 SF | $5.00 | $5.00 | $5.00 | $18.00 | $3.00 | $10.00 |
| 512E44450 TYPE E WATERPROOFING | 6 SY | $20.00 | $20.00 | $20.00 | $21.00 | $21.00 | $20.00 |
| 516E10000 PREFORMED ELASTOMERIC COMPRESSION JOINT SEAL | 100 FT | $20.00 | $20.00 | $20.00 | $21.00 | $21.00 | $20.00 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 280 FT | $18.00 | $18.00 | $18.00 | $20.00 | $19.00 | $18.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 15 FT | $9.00 | $14.00 | $9.00 | $22.00 | $22.00 | $14.00 |
| 630E80100 SIGN, FLAT SHEET, 730.20 | 2 SF | $15.00 | $30.00 | $15.00 | $44.00 | $44.00 | $30.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 2 EACH | $25.00 | $10.00 | $25.00 | $29.00 | $29.00 | $10.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $25.00 | $10.00 | $25.00 | $35.00 | $35.00 | $10.00 |
| 646E10010 EDGE LINE, 6" | 0.06 MILE | $35,000 | $35,000 | $35,000 | $52,000 | $37,000 | $35,000 |
| 646E10200 CENTER LINE | 0.03 MILE | $55,000 | $55,000 | $55,000 | $52,000 | $58,000 | $55,000 |
| 848E30001 MICRO SILICA MODIFIED CONCRETE OVERLAY (VARIABLE T | 7 CY | $200 | $200 | $200 | $212 | $211 | $200 |
| 848E50000 HAND CHIPPING | 21 SY | $100 | $100 | $100 | $106 | $105 | $100 |
| 848E50100 TEST SLAB | 1 LS | $750 | $750 | $750 | $800 | $800 | $750 |
| 848E50201 FULL DEPTH REPAIR, AS PER PLAN | 2 CY | $150 | $150 | $150 | $200 | $160 | $150 |
| 848E50341 REMOVAL OF DEBONDED OR DETERIORATED EXISTING VARIA | 21 SY | $60.00 | $60.00 | $60.00 | $63.00 | $63.00 | $60.00 |
| 614E11320 PORTABLE TRAFFIC SIGNAL, TYPE TR1 (TRAILER) | 4 EACH | $2,500 | $2,500 | $4,000 | $4,300 | $3,225 | $5,000 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 2 SNMT | $900 | $900 | $3,000 | $3,200 | $1,050 | $1,500 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 0.38 MILE | $4,000 | $2,500 | $3,000 | $2,200 | $3,150 | $2,000 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 0.26 MILE | $2,000 | $2,500 | $4,000 | $2,200 | $4,200 | $2,000 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 106 FT | $3.00 | $2.50 | $20.00 | $3.00 | $21.00 | $3.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,000 | $8,000 | $9,500 | $4,700 | $15,000 | $14,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $10,000 | $6,000 | $6,480 | $15,000 | $10,500 | $6,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $85,000 | $85k | 12% |
| 848E20001 SURFACE PREPARATION USING HYDRODEMOLITION, AS PER | 687 SY | $77 | $53k | 7% |
| 848E10001 MICRO SILICA MODIFIED CONCRETE OVERLAY USING HYDRO | 687 SY | $75 | $52k | 7% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 364 CY | $132 | $48k | 7% |
| 424E12001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B, AS P | 169 CY | $196 | $33k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $25,000 | $25k | 3% |
| 611E04900 12" CONDUIT, TYPE D | 619 FT | $40 | $25k | 3% |
| 848E50321 EXISTING CONCRETE OVERLAY REMOVED, AS PER PLAN (T | 687 SY | $32 | $22k | 3% |
| 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING | 240 FT | $85 | $20k | 3% |
| 203E10000 EXCAVATION | 845 CY | $24 | $20k | 3% |