CUY-SR 43-10.61
CUY County · est $6.6M
Bid dateThursday, April 23—
CUY County · est $6.6M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 158 more items below.
| Item | Quantity | R1Perk Company INC | R2Karvo Companies INC | R3Terrace Construction CO INC | R4Catts Construction INC | % of bid |
|---|---|---|---|---|---|---|
| 441E50301 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (4072 CY | $130 | $135 | $139 | $162 | 12% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 3,067 CY | $165 | $183 | $177 | $193 | 12% |
| 608E52001 CURB RAMP, AS PER PLAN | 13,464 SF | $26.00 | $12.80 | $18.15 | $16.00 | 8% |
| 255E10011 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 7,500 SY | $40.00 | $80.00 | $113 | $88.00 | 7% |
| Item | Quantity | R1Perk Company INC | R2Karvo Companies INC | R3Terrace Construction CO INC | R4Catts Construction INC |
|---|---|---|---|---|---|
| 202E23001 PAVEMENT REMOVED, AS PER PLAN | 2,143 SY | $21.00 | $17.00 | $16.10 | $14.00 |
| 202E30001 WALK REMOVED, AS PER PLAN | 35,408 SF | $2.00 | $1.50 | $1.75 | $1.25 |
| 202E32001 CURB REMOVED, AS PER PLAN | 3,730 FT | $12.00 | $13.00 | $10.70 | $8.50 |
| 202E38000 GUARDRAIL REMOVED | 255 FT | $8.50 | $2.50 | $6.05 | $5.00 |
| 202E98100 REMOVAL MISC.:BOLLARD REMOVED |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 624E10000 MOBILIZATION | 1 LS | $269,000 | $280,000 | $88,792 | $282,000 | 6% |
| 608E10001 4" CONCRETE WALK, AS PER PLAN | 31,192 SF | $8.00 | $5.35 | $7.25 | $6.75 | 6% |
| 452E12051 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS, | 2,151 SY | $110 | $71.00 | $73.55 | $70.00 | 5% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $202,500 | $5,000 | $32,210 | $1,000 | 5% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN(T | 87,227 SY | $2.30 | $2.65 | $2.45 | $4.00 | 5% |
| 609E26001 CURB, TYPE 6, AS PER PLAN | 3,736 FT | $50.00 | $20.45 | $25.85 | $26.50 | 4% |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 183 EACH | $1,000 | $750 | $682 | $700 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $160,275 | $375,000 | $186,255 | $250,000 | 4% |
| 611E98631 CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN | 159 EACH | $1,000 | $750 | $721 | $725 | 4% |
| 638E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN | 151 EACH | $850 | $500 | $640 | $550 | 3% |
| 441E50201 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (947 CY | $135 | $183 | $144 | $190 | 3% |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 100,000 LB | $1.25 | $1.40 | $1.55 | $1.45 | 3% |
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN | 7,500 SY | $15.00 | $35.00 | $21.40 | $25.00 | 3% |
| 305E13010 9" CONCRETE BASE, CLASS QC 1P | 3,000 SY | $35.00 | $40.00 | $38.25 | $40.00 | 2% |
| 633E01551 CONTROLLER UNIT, TYPE TS2/A2, WITH CABINET, TYPE T | 6 EACH | $17,400 | $17,500 | $19,845 | $20,636 | 2% |
| 632E64011 SIGNAL SUPPORT FOUNDATION, AS PER PLAN | 17 EACH | $4,700 | $4,800 | $4,120 | $5,665 | 2% |
| 5 EACH |
| $250 |
| $75.00 |
| $77.10 |
| $220 |
| 202E98300 REMOVAL MISC.:TRACK REMOVED | 3,000 SY | $2.00 | $15.00 | $9.40 | $5.00 |
| 203E10000 EXCAVATION | 500 CY | $10.00 | $15.00 | $4.55 | $1.00 |
| 203E98500 ROADWAY, MISC.:PRE-CONSTRUCTION VIDEO | 1 LS | $2,300 | $3,000 | $11,520 | $3,500 |
| 209E60200 LINEAR GRADING | 21.9 STA | $1.00 | $280 | $481 | $1.00 |
| 608E13001 6" CONCRETE WALK, AS PER PLAN | 5,000 SF | $8.10 | $5.50 | $9.35 | $8.25 |
| 608E53021 DETECTABLE WARNING, AS PER PLAN | 181 SF | $30.00 | $85.00 | $97.35 | $40.00 |
| 623E38501 MONUMENT ASSEMBLY, AS PER PLAN | 5 EACH | $850 | $950 | $1,088 | $875 |
| 623E39501 MONUMENT BOX ADJUSTED TO GRADE, AS PER PLAN | 45 EACH | $850 | $430 | $640 | $565 |
| 623E40900 MONUMENT, MISC.:MONUMENT REFERENCING | 50 EACH | $100 | $233 | $249 | $160 |
| 659E00300 TOPSOIL | 99 CY | $52.00 | $45.00 | $74.35 | $48.00 |
| 659E10000 SEEDING AND MULCHING | 1,544 SY | $10.00 | $2.00 | $5.95 | $1.50 |
| 659E20000 COMMERCIAL FERTILIZER | 0.2 TON | $1,000 | $750 | $1,170 | $600 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $2,100 | $1,225 | $1,712 | $1,500 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $500 | $9,000 | $5,618 | $4,000 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $7,760 | $11,250 | $7,871 | $5,000 |
| 832E30001 EROSION CONTROL, AS PER PLAN | 28,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E05200 4" UNCLASSIFIED PIPE UNDERDRAINS | 250 FT | $4.00 | $12.00 | $7.35 | $5.00 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 4,263 FT | $4.10 | $15.00 | $10.25 | $5.00 |
| 611E98635 CATCH BASIN RECONSTRUCTED TO GRADE, AS PER PLAN | 15 EACH | $1,900 | $1,250 | $1,070 | $1,000 |
| 611E99661 MANHOLE RECONSTRUCTED TO GRADE, AS PER PLAN | 15 EACH | $1,100 | $1,100 | $920 | $1,000 |
| 613E41250 LOW STRENGTH MORTAR BACKFILL (TYPE 1) | 250 CY | $40.00 | $110 | $91.65 | $40.00 |
| 254E01011 PAVEMENT PLANING, PORTLAND CEMENT CONCRETE, AS PER | 3,652 SY | $3.50 | $5.25 | $3.75 | $6.00 |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 50 CY | $185 | $300 | $198 | $200 |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 500 CY | $20.00 | $40.00 | $35.50 | $35.00 |
| 407E20001 NON-TRACKING TACK COAT, AS PER PLAN | 12,747 GAL | $3.15 | $2.20 | $3.35 | $2.00 |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 186 CY | $250 | $285 | $268 | $375 |
| 452E10051 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS, | 489 SY | $100 | $62.00 | $65.25 | $58.00 |
| 511E71100 CONCRETE, MISC.:CONCRETE MIX DESIGN FOR CLASS QC M | 100 CY | $15.00 | $9.00 | $14.30 | $35.00 |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 5,465 LB | $3.50 | $1.40 | $3.75 | $4.00 |
| 638E10400 FIRE HYDRANT ADJUSTED TO GRADE | 9 EACH | $1,000 | $1,350 | $2,249 | $325 |
| 638E10901 SERVICE BOX ADJUSTED TO GRADE, AS PER PLAN | 252 EACH | $10.00 | $150 | $76.50 | $25.00 |
| 638E98000 WATER WORK, MISC.:WATER MANHOLE ADJUSTED TO GRADE | 14 EACH | $300 | $1,450 | $682 | $500 |
| 638E98000 WATER WORK, MISC.:WATER MANHOLE RECONSTRUCTED TO G | 2 EACH | $3,000 | $1,750 | $870 | $800 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 969.6 FT | $6.00 | $7.00 | $7.50 | $8.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 1,408.2 FT | $7.00 | $8.00 | $8.55 | $9.00 |
| 630E08520 STREET NAME SIGN SUPPORT, NO. 3 POST | 37.8 FT | $8.00 | $9.00 | $9.65 | $10.00 |
| 630E08600 SIGN POST REFLECTOR | 11 EACH | $35.00 | $35.00 | $37.45 | $41.00 |
| 630E08601 SIGN POST REFLECTOR, AS PER PLAN | 34 EACH | $45.00 | $45.00 | $48.15 | $53.00 |
| 630E79000 SIGN HANGER ASSEMBLY, SPAN WIRE | 3 EACH | $275 | $275 | $294 | $325 |
| 630E79101 SIGN HANGER ASSEMBLY, MAST ARM, AS PER PLAN | 32 EACH | $285 | $285 | $305 | $336 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 110 EACH | $45.00 | $45.00 | $48.15 | $53.00 |
| 630E80100 SIGN, FLAT SHEET | 1,582.4 SF | $14.00 | $14.00 | $15.00 | $16.50 |
| 630E80511 SIGN, STREET NAME, AS PER PLAN | 41 EACH | $275 | $305 | $326 | $359 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 18 EACH | $20.00 | $20.00 | $21.40 | $24.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 9 EACH | $30.00 | $30.00 | $32.10 | $35.00 |
| 630E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL | 9 EACH | $50.00 | $50.00 | $53.50 | $59.00 |
| 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL | 185 EACH | $15.00 | $15.00 | $16.05 | $18.00 |
| 630E97700 SIGNING, MISC.:SOLAR POWERED RECTANGULAR RAPID FLA | 2 EACH | $6,300 | $7,100 | $7,750 | $8,372 |
| 631E93241 SCHOOL SPEED LIMIT SIGN ASSEMBLY, SOLAR-POWERED, A | 2 EACH | $4,100 | $4,600 | $5,972 | $5,424 |
| 631E94490 REMOVAL, MISC.:REMOVAL OF SIGN SERVICE | 2 EACH | $450 | $600 | $1,456 | $707 |
| 632E64021 PEDESTAL FOUNDATION, AS PER PLAN | 4 EACH | $840 | $800 | $1,057 | $944 |
| 632E90010 PEDESTAL, MISC.:PEDESTAL, 16", TRANSFORMER BASE | 2 EACH | $920 | $1,600 | $1,311 | $1,886 |
| 644E00100 EDGE LINE, 4" | 1.64 MILE | $2,300 | $2,400 | $2,284 | $2,830 |
| 644E00104 EDGE LINE, 6" | 1.58 MILE | $2,800 | $3,200 | $5,055 | $3,774 |
| 644E00300 CENTER LINE | 6.45 MILE | $4,400 | $4,500 | $3,959 | $5,306 |
| 644E00400 CHANNELIZING LINE, 8" | 1,575 FT | $1.10 | $1.25 | $1.25 | $1.50 |
| 644E00500 STOP LINE | 1,129 FT | $5.50 | $5.75 | $4.80 | $7.00 |
| 644E00600 CROSSWALK LINE | 5,249 FT | $2.45 | $2.75 | $2.25 | $3.25 |
| 644E00601 CROSSWALK LINE, AS PER PLAN | 969 FT | $6.00 | $7.00 | $4.70 | $8.00 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 252 FT | $5.50 | $5.75 | $4.70 | $7.00 |
| 644E00900 ISLAND MARKING | 66 SF | $3.00 | $3.50 | $2.70 | $4.00 |
| 644E01000 RAILROAD SYMBOL MARKING | 3 EACH | $550 | $600 | $535 | $707 |
| 644E01300 LANE ARROW | 136 EACH | $105 | $105 | $69.55 | $124 |
| 644E01630 BIKE LANE SYMBOL MARKING | 55 EACH | $285 | $285 | $417 | $336 |
| 644E19000 SHARED LANE MARKING | 91 EACH | $400 | $400 | $364 | $472 |
| 644E30000 REMOVAL OF PAVEMENT MARKING | 622 FT | $5.00 | $5.00 | $4.80 | $6.00 |
| 644E50300 PAVEMENT MARKING, MISC.:BIKE LANE LINE, DOTTED, 2' | 127 FT | $2.00 | $2.00 | $1.60 | $2.50 |
| 644E50300 PAVEMENT MARKING, MISC.:BIKE LANE LINE, DOTTED, 6' | 3,525 FT | $3.00 | $3.00 | $1.60 | $3.50 |
| 644E50300 PAVEMENT MARKING, MISC.:CENTER LINE, DOTTED, 4' GA | 196 FT | $3.20 | $3.20 | $2.70 | $3.75 |
| 644E50300 PAVEMENT MARKING, MISC.:CHANNELIZING LINE, DOTTED, | 241 FT | $2.50 | $2.50 | $2.15 | $3.00 |
| 644E50300 PAVEMENT MARKING, MISC.:LANE LINE, DOTTED, 9' GAP | 150 FT | $2.00 | $2.00 | $1.60 | $2.00 |
| 646E10000 EDGE LINE, 4" | 0.29 MILE | $3,600 | $3,800 | $2,301 | $4,481 |
| 646E10010 EDGE LINE, 6" | 0.15 MILE | $3,800 | $4,100 | $2,943 | $4,835 |
| 646E10200 CENTER LINE | 0.27 MILE | $8,500 | $9,500 | $4,280 | $11,202 |
| 646E10300 CHANNELIZING LINE, 8" | 914 FT | $1.90 | $2.10 | $1.60 | $2.50 |
| 646E10400 STOP LINE | 380 FT | $11.00 | $11.00 | $9.65 | $13.00 |
| 646E10500 CROSSWALK LINE | 1,158 FT | $5.50 | $5.50 | $5.35 | $6.50 |
| 646E10501 CROSSWALK LINE, AS PER PLAN | 278 FT | $14.00 | $14.00 | $8.05 | $16.50 |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 952 FT | $8.00 | $8.00 | $8.05 | $9.50 |
| 646E20000 RAILROAD SYMBOL MARKING | 1 EACH | $600 | $600 | $803 | $707 |
| 646E20300 LANE ARROW | 17 EACH | $155 | $155 | $161 | $183 |
| 646E20600 BIKE LANE SYMBOL MARKING | 5 EACH | $275 | $275 | $428 | $325 |
| 646E20650 SHARED LANE MARKING | 21 EACH | $295 | $295 | $375 | $348 |
| 646E50000 REMOVAL OF PAVEMENT MARKING | 9 EACH | $100 | $100 | $161 | $118 |
| 646E50100 REMOVAL OF PAVEMENT MARKING | 1,596 FT | $5.00 | $5.00 | $1.25 | $6.00 |
| 646E50300 REMOVAL OF PAVEMENT MARKING | 0.55 MILE | $2,300 | $2,300 | $2,825 | $2,713 |
| 646E90000 PAVEMENT MARKING, MISC.:BIKE LANE LINE, DOTTED, 6' | 568 FT | $4.00 | $4.00 | $2.70 | $5.00 |
| 646E90000 PAVEMENT MARKING, MISC.:LANE LINE, DOTTED, 9' GAP | 306 FT | $4.00 | $4.00 | $3.20 | $5.00 |
| 625E25409 CONDUIT, 2", 725.051, AS PER PLAN | 790 FT | $5.40 | $5.50 | $9.70 | $7.00 |
| 625E25505 CONDUIT, 3", 725.051, AS PER PLAN | 2,205 FT | $6.50 | $6.60 | $10.40 | $8.00 |
| 625E25605 CONDUIT, 4", 725.051, AS PER PLAN | 160 FT | $7.60 | $7.50 | $12.55 | $9.00 |
| 625E25910 CONDUIT CLEANED AND CABLES REMOVED | 842 FT | $1.75 | $2.00 | $2.45 | $2.50 |
| 625E29000 TRENCH | 530 FT | $10.50 | $12.00 | $10.25 | $14.00 |
| 625E29500 TRENCH IN PAVED AREA, TYPE A | 579 FT | $50.00 | $25.00 | $43.40 | $14.00 |
| 625E29600 TRENCH IN PAVED AREA, TYPE B | 962 FT | $50.00 | $25.00 | $69.75 | $14.00 |
| 625E31600 PULL BOX, MISC.:PULL BOX, 13" x 24" | 13 EACH | $640 | $650 | $702 | $766 |
| 625E31600 PULL BOX, MISC.:PULL BOX, 17" x 30" | 17 EACH | $840 | $850 | $859 | $1,000 |
| 625E31600 PULL BOX, MISC.:PULL BOX, 24" x 36" | 6 EACH | $1,085 | $1,100 | $986 | $1,300 |
| 625E32001 GROUND ROD, AS PER PLAN | 43 EACH | $240 | $300 | $314 | $353 |
| 625E36000 PLASTIC CAUTION TAPE | 2,071 FT | $0.70 | $1.00 | $0.45 | $1.00 |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 64 EACH | $595 | $600 | $767 | $708 |
| 632E05011 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 2 EACH | $980 | $975 | $1,429 | $1,150 |
| 632E05087 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 6 EACH | $1,170 | $1,200 | $1,277 | $1,400 |
| 632E20731 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN, | 52 EACH | $420 | $425 | $414 | $500 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 74 EACH | $39.00 | $40.00 | $51.25 | $47.00 |
| 632E25010 COVERING OF PEDESTRIAN SIGNAL HEAD | 52 EACH | $28.00 | $30.00 | $10.10 | $35.00 |
| 632E26001 PEDESTRIAN PUSHBUTTON, AS PER PLAN | 16 EACH | $150 | $145 | $286 | $171 |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 30 EACH | $790 | $800 | $838 | $945 |
| 632E27009 LOOP DETECTOR UNIT, DELAY AND EXTENSION TYPE, AS P | 22 EACH | $245 | $250 | $268 | $295 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 8,029 FT | $1.80 | $1.75 | $1.95 | $2.00 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 5,650 FT | $1.90 | $1.95 | $2.25 | $2.25 |
| 632E64020 PEDESTAL FOUNDATION | 14 EACH | $790 | $900 | $900 | $1,061 |
| 632E65200 LOOP DETECTOR LEAD-IN CABLE | 5,818 FT | $1.30 | $1.25 | $1.75 | $1.50 |
| 632E69300 POWER CABLE, 3 CONDUCTOR, NO. 4 AWG | 735 FT | $3.90 | $4.00 | $6.10 | $4.75 |
| 632E70001 POWER SERVICE, AS PER PLAN | 6 EACH | $1,800 | $1,850 | $1,060 | $2,180 |
| 632E75033 SIGNAL SUPPORT, TYPE TC-81.21 DESIGN 4 POLE, WITH | 1 EACH | $8,100 | $8,510 | $9,950 | $10,000 |
| 632E75063 SIGNAL SUPPORT, TYPE TC-81.21 DESIGN 11 POLE, WITH | 1 EACH | $9,900 | $11,390 | $12,654 | $13,466 |
| 632E75133 SIGNAL SUPPORT, TYPE TC-12.30 DESIGN 5 POLE, WITH | 1 EACH | $11,000 | $14,000 | $17,109 | $16,500 |
| 632E80103 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 1, AS PER PL | 6 EACH | $4,250 | $5,100 | $5,305 | $6,000 |
| 632E80203 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 2, AS PER PL | 3 EACH | $4,750 | $5,300 | $5,647 | $6,250 |
| 632E80403 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 4, AS PER PL | 1 EACH | $6,300 | $6,700 | $8,420 | $7,900 |
| 632E80503 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 11, AS PER P | 3 EACH | $8,000 | $9,500 | $11,597 | $11,202 |
| 632E80621 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 13, AS PER P | 1 EACH | $1,000 | $13,000 | $15,116 | $15,330 |
| 632E80700 SIGNAL SUPPORT, MISC.:TYPE TC-81.20, DESIGN 1 (SUP | 1 EACH | $3,200 | $3,500 | $4,405 | $4,127 |
| 632E89901 PEDESTAL, 8', TRANSFORMER BASE, AS PER PLAN | 14 EACH | $640 | $600 | $729 | $708 |
| 632E90020 REMOVAL OF MISCELLANEOUS TRAFFIC SIGNAL ITEMAERIAL | 1 EACH | $2,400 | $3,800 | $5,892 | $4,481 |
| 632E90020 REMOVAL OF MISCELLANEOUS TRAFFIC SIGNAL ITEMSTRAIN | 12 EACH | $1,400 | $1,500 | $745 | $1,768 |
| 632E90101 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, AS PER PLA | 14 EACH | $1,750 | $1,800 | $2,499 | $2,122 |
| 632E90400 SIGNALIZATION, MISC.:BACKPLATE ADDITION | 1 EACH | $290 | $300 | $348 | $353 |
| 632E90400 SIGNALIZATION, MISC.:REUSE OF SIGNAL EQUIPMENT | 1 EACH | $400 | $300 | $675 | $353 |
| 632E90400 SIGNALIZATION, MISC.:TEST HOLE PERFORMED | 6 EACH | $390 | $400 | $625 | $471 |
| 633E67100 CABINET FOUNDATION | 6 EACH | $2,050 | $2,100 | $1,610 | $2,476 |
| 633E67200 CONTROLLER WORK PAD | 2 EACH | $650 | $700 | $587 | $825 |
| 633E99000 CONTROLLER ITEM, MISC.:GPS INTERCONNECT ASSEMBLY | 9 EACH | $625 | $650 | $1,031 | $766 |
| AA2 816E30000 VIDEO DETECTION SYSTEM(ITERIS MODEL: VANTAGE NEXT) | 2 EACH | $6,900 | $7,200 | $7,251 | $8,490 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 90 CY | $75.00 | $5.45 | $48.35 | $10.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 200 HOUR | $70.00 | $75.00 | $69.55 | $75.00 |
| 614E12420 DETOUR SIGNING | 1 LS | $24,200 | $24,200 | $42,735 | $30,000 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 260 CY | $300 | $240 | $245 | $70.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 24 SNMT | $950 | $900 | $963 | $900 |
| 614E20000 WORK ZONE LANE LINE, CLASS I, 4" | 0.65 MILE | $600 | $600 | $963 | $1,061 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 6.3 MILE | $1,500 | $1,500 | $1,284 | $1,415 |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 8.1 MILE | $700 | $700 | $963 | $1,061 |
| 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, 8" | 1,072 FT | $0.95 | $0.95 | $1.05 | $1.00 |
| 614E24000 WORK ZONE DOTTED LINE, CLASS I | 902 FT | $2.00 | $2.00 | $0.80 | $1.00 |
| 614E25000 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS I | 449 FT | $2.50 | $2.50 | $6.40 | $7.00 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 1,495 FT | $3.00 | $3.00 | $6.40 | $7.00 |
| 614E30000 WORK ZONE ARROW, CLASS I | 26 EACH | $55.00 | $55.00 | $102 | $112 |
| 616E10000 WATER | 60 MGAL | $1.00 | $5.00 | $13.00 | $10.00 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $3,125 | $5,500 | $5,000 | $5,000 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $74,000 | $75,000 | $30,296 | $65,000 |
| 619E16011 FIELD OFFICE, TYPE B, AS PER PLAN | 6 MNTH | $2,300 | $2,000 | $2,675 | $2,000 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $11,200 | $18,640 | $64,713 | $10,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50301 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (4072 CY | $130 | $529k | 9% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 3,067 CY | $165 | $506k | 8% |
| 608E52001 CURB RAMP, AS PER PLAN | 13,464 SF | $26 | $350k | 6% |
| 255E10011 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 7,500 SY | $40 | $300k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $269,000 | $269k | 4% |
| 608E10001 4" CONCRETE WALK, AS PER PLAN | 31,192 SF | $8 | $250k | 4% |
| 452E12051 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS, | 2,151 SY | $110 | $237k | 4% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $202,500 | $203k | 3% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN(T | 87,227 SY | $2.3 | $201k | 3% |
| 609E26001 CURB, TYPE 6, AS PER PLAN | 3,736 FT | $50 | $187k | 3% |