ERI-US 6-06.41
ERI County · est $2.3M
Bid dateThursday, April 23—
ERI County · est $2.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 65 more items below.
| Item | Quantity | R1Erie Blacktop INC | R2Gerken Paving INC | % of bid |
|---|---|---|---|---|
| 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 4,884 CY | $162 | $175 | 38% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 775 CY | $250 | $215 | 9% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.50 INCH) | 116,077 SY | $1.50 | $3.05 | 8% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $125,000 | $98,000 | 6% |
| 257E10000 DIAMOND GRINDING PORTLAND CEMENT CONCRETE PAVEMENT | 27,596 SY | $3.80 | $3.49 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100,000 | 5% |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 153 EACH | $600 | $1,100 | 4% |
| 609E26001 CURB, TYPE 6, AS PER PLAN |
| Item | Quantity | R1Erie Blacktop INC | R2Gerken Paving INC |
|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 388 SY | $30.00 | $24.00 |
| 202E30000 WALK REMOVED | 4,697 SF | $2.60 | $2.45 |
| 202E32000 CURB REMOVED | 265 FT | $8.40 | $8.00 |
| 209E60500 LINEAR GRADING | 2.51 MILE | $2,000 | $1,100 |
| 209E80000 GRADING MAILBOX APPROACHES | 20 EACH | $200 | $300 |
| 608E52000 CURB RAMP | 1,163 SF | $11.85 | $11.30 |
| 608E53020 DETECTABLE WARNING | 568 SF | $29.40 | $28.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 3,000 FT |
| $24.70 |
| $23.50 |
| 4% |
| 255E10161 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 418 SY | $170 | $146 | 3% |
| 255E10160 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 382 SY | $155 | $130 | 3% |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 43 EACH | $1,345 | $1,375 | 3% |
| 256E10000 BONDED PATCHING OF PORTLAND CEMENT CONCRETE PAVEME | 920 SF | $36.00 | $36.00 | 2% |
| 608E10000 4" CONCRETE WALK | 3,534 SF | $8.40 | $8.00 | 1% |
| 202E32001 CURB REMOVED, AS PER PLAN | 3,380 FT | $8.40 | $8.00 | 1% |
| 611E99155 INLET RECONSTRUCTED TO GRADE, AS PER PLAN | 8 EACH | $3,200 | $3,050 | 1% |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 39 EACH | $600 | $1,925 | 1% |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 6,632 FT | $3.15 | $1.85 | 1% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 97 CY | $215 | $205 | 1% |
| 407E20000 NON-TRACKING TACK COAT | 9,351 GAL | $2.15 | $2.00 | 1% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 300 HOUR | $65.00 | $85.00 | 1% |
| 609E14001 CURB, TYPE 2-A, AS PER PLAN | 300 FT | $29.40 | $23.50 |
| 609E16001 CURB, TYPE 2-B, AS PER PLAN | 80 FT | $29.40 | $23.50 |
| 609E26000 CURB, TYPE 6 | 149 FT | $24.70 | $23.50 |
| 623E39500 MONUMENT BOX ADJUSTED TO GRADE | 40 EACH | $105 | $800 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 |
| 204E10000 SUBGRADE COMPACTION | 388 SY | $4.00 | $2.00 |
| 253E02000 PAVEMENT REPAIR | 65 CY | $285 | $260 |
| 254E01600 PATCHING PLANED SURFACE | 582 SY | $7.50 | $8.00 |
| 304E20000 AGGREGATE BASE | 65 CY | $105 | $62.00 |
| 408E10001 PRIME COAT, AS PER PLAN | 1,218 GAL | $4.75 | $3.00 |
| 617E10100 COMPACTED AGGREGATE | 189 CY | $65.00 | $80.00 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 25 EACH | $210 | $625 |
| 646E10000 EDGE LINE, 4" | 0.05 MILE | $3,990 | $6,250 |
| 646E10100 LANE LINE, 4" | 0.82 MILE | $2,310 | $3,900 |
| 646E10200 CENTER LINE | 0.51 MILE | $6,090 | $8,400 |
| 646E10300 CHANNELIZING LINE, 8" | 335 FT | $2.05 | $1.70 |
| 646E10400 STOP LINE | 74 FT | $12.60 | $11.20 |
| 646E10500 CROSSWALK LINE | 371 FT | $6.30 | $5.30 |
| 646E20300 LANE ARROW | 14 EACH | $163 | $150 |
| 646E20502 DOTTED LINE, 4" | 776 FT | $4.20 | $1.40 |
| 642E00800 CURB MARKING, TYPE 1 | 2,500 FT | $1.60 | $3.99 |
| AA1 642E00100 EDGE LINE, 4", TYPE 1 (ALTERNATE 1) | 2.49 MILE | $580 | $450 |
| AA1 642E00200 LANE LINE, 4", TYPE 1 (ALTERNATE 1) | 1.17 MILE | $660 | $325 |
| AA1 642E00300 CENTER LINE, TYPE 1 (ALTERNATE 1) | 4.91 MILE | $880 | $680 |
| AA1 642E00400 CHANNELIZING LINE, 8", TYPE 1 (ALTERNATE 1) | 4,257 FT | $0.55 | $0.60 |
| AA1 642E00500 STOP LINE, TYPE 1 (ALTERNATE 1) | 957 FT | $3.70 | $3.95 |
| AA1 642E00600 CROSSWALK LINE, TYPE 1 (ALTERNATE 1) | 6,451 FT | $2.90 | $2.15 |
| AA1 642E00700 TRANSVERSE/DIAGONAL LINE, TYPE 1 (ALTERNATE 1) | 245 FT | $3.70 | $4.25 |
| AA1 642E01100 SCHOOL SYMBOL MARKING, 72", TYPE 1 (ALTERNATE 1) | 2 EACH | $210 | $455 |
| AA1 642E01110 SCHOOL SYMBOL MARKING, 96", TYPE 1 (ALTERNATE 1) | 1 EACH | $240 | $455 |
| AA1 642E01200 PARKING LOT STALL MARKING, TYPE 1 (ALTERNATE 1) | 3,452 FT | $1.55 | $1.00 |
| AA1 642E01300 LANE ARROW, TYPE 1 (ALTERNATE 1) | 106 EACH | $44.00 | $79.00 |
| AA1 642E01312 LANE REDUCTION ARROW, TYPE 1 (ALTERNATE 1) | 1 EACH | $135 | $320 |
| AA1 642E01500 DOTTED LINE, 4", TYPE 1 (ALTERNATE 1) | 441 FT | $0.65 | $0.80 |
| 614E12460 WORK ZONE MARKING SIGN | 10 EACH | $85.00 | $110 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 25 CY | $300 | $500 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 8 SNMT | $945 | $1,200 |
| 614E20200 WORK ZONE LANE LINE, CLASS I, 4", 740.06, TYPE I | 0.4 MILE | $3,150 | $6,000 |
| 614E20550 WORK ZONE LANE LINE, CLASS III, 4", 642 PAINT | 2.38 MILE | $630 | $600 |
| 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I | 0.37 MILE | $7,350 | $15,000 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 9.86 MILE | $975 | $800 |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 0.36 MILE | $4,200 | $7,000 |
| 614E23400 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 740.06, | 150 FT | $3.95 | $2.00 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 8,514 FT | $0.55 | $1.00 |
| 614E24400 WORK ZONE DOTTED LINE, CLASS I, 4", 740.06, TYPE I | 462 FT | $2.40 | $2.00 |
| 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I | 74 FT | $11.55 | $8.00 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 1,654 FT | $3.10 | $4.00 |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $3,250 | $3,850 |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 21 SY | $235 | $400 |
| 202E98200 REMOVAL MISC.: JOINT SEALER | 95 FT | $5.00 | $4.80 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 76 SY | $28.50 | $27.20 |
| 512E73501 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE | 119 SY | $38.70 | $36.89 |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 76 SY | $16.00 | $15.39 |
| 516E31000 JOINT SEALER | 95 FT | $18.25 | $17.45 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $3,000 | $5,000 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $9,500 | $15,000 |
| 619E16010 FIELD OFFICE, TYPE B | 3 MNTH | $2,200 | $2,100 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,800 | $21,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 4,884 CY | $162 | $791k | 34% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 775 CY | $250 | $194k | 8% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.50 INCH) | 116,077 SY | $1.5 | $174k | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $125,000 | $125k | 5% |
| 257E10000 DIAMOND GRINDING PORTLAND CEMENT CONCRETE PAVEMENT | 27,596 SY | $3.8 | $105k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 4% |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 153 EACH | $600 | $92k | 4% |
| 609E26001 CURB, TYPE 6, AS PER PLAN | 3,000 FT | $24.7 | $74k | 3% |
| 255E10161 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 418 SY | $170 | $71k | 3% |
| 255E10160 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 382 SY | $155 | $59k | 3% |