LOR-SR 83-10.50
LOR County · est $1.3M
Bid dateThursday, April 23—
LOR County · est $1.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 21 more items below.
| Item | Quantity | R1Shelly Company | R2Karvo Companies INC | R3Chagrin Valley Paving INC | R4Cross-roads Asphalt Recycling INC | % of bid |
|---|---|---|---|---|---|---|
| 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 3,689 CY | $135 | $150 | $140 | $130 | 55% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 700 CY | $165 | $180 | $175 | $190 | 13% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.50 inch) | 86,847 SY | $1.00 | $0.80 | $1.15 | $2.00 | 10% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $52,500 | $82,000 | $90,000 | $72,700 |
| Item | Quantity | R1Shelly Company | R2Karvo Companies INC | R3Chagrin Valley Paving INC | R4Cross-roads Asphalt Recycling INC |
|---|---|---|---|---|---|
| 202E30000 WALK REMOVED | 150 SF | $8.50 | $6.25 | $10.00 | $10.00 |
| 608E10000 4" CONCRETE WALK | 150 SF | $11.75 | $15.75 | $15.00 | $18.00 |
| 608E53020 DETECTABLE WARNING | 24 SF | $42.50 | $48.00 | $100 | $25.00 |
| 832E30000 EROSION CONTROL | 900 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 6% |
| 617E10100 COMPACTED AGGREGATE | 376 CY | $65.44 | $55.00 | $60.00 | $64.00 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20,500 | $87,250 | $40,000 | 2% |
| 407E20000 NON-TRACKING TACK COAT | 7,054 GAL | $2.50 | $2.20 | $2.00 | $4.00 | 2% |
| 408E10001 PRIME COAT, AS PER PLAN | 4,354 GAL | $3.50 | $3.75 | $2.00 | $4.00 | 2% |
| 623E39500 MONUMENT BOX ADJUSTED TO GRADE | 18 EACH | $800 | $110 | $800 | $1,750 | 2% |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 9.2 MILE | $975 | $975 | $990 | $975 | 1% |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 8 EACH | $975 | $845 | $975 | $2,000 | 1% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 120 HOUR | $65.00 | $65.00 | $60.00 | $50.00 | 1% |
| AA1 642E00104 EDGE LINE, 6", TYPE 1 | 9 MILE | $740 | $615 | $740 | $615 | 1% |
| 209E60500 LINEAR GRADING | 8.7 MILE | $760 | $2,200 | $250 | $1,100 | 1% |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 5 EACH | $1,100 | $1,100 | $1,100 | $1,100 | 1% |
| 519E12300 PATCHING CONCRETE BRIDGE DECK - TYPE B | 3 SY | $1,750 | $1,050 | $2,000 | $1,500 | 1% |
| 253E02000 PAVEMENT REPAIR | 25 CY | $200 | $205 | $175 | $195 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,000 | $1,300 | $500 | $5,500 | 1% |
| AA1 642E00300 CENTER LINE, TYPE 1 | 4.6 MILE | $930 | $765 | $930 | $765 | 0% |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 5 EACH | $825 | $450 | $825 | $100 | 0% |
| 1 EACH |
| $950 |
| $165 |
| $950 |
| $2,000 |
| 254E01600 PATCHING PLANED SURFACE | 867 SY | $1.00 | $0.50 | $5.00 | $7.50 |
| 617E20000 SHOULDER PREPARATION | 10,885 SY | $0.25 | $0.27 | $0.25 | $1.00 |
| 646E10010 EDGE LINE, 6" | 0.33 MILE | $10,290 | $15,000 | $10,290 | $18,000 |
| 646E10200 CENTER LINE | 0.16 MILE | $10,710 | $16,000 | $10,710 | $19,000 |
| AA1 642E00400 CHANNELIZING LINE, 8", TYPE 1 | 835 FT | $0.55 | $0.50 | $0.55 | $0.50 |
| AA1 642E00500 STOP LINE, TYPE 1 | 330 FT | $2.50 | $3.50 | $2.50 | $3.50 |
| AA1 642E00600 CROSSWALK LINE, TYPE 1 | 288 FT | $2.00 | $2.00 | $2.00 | $2.00 |
| AA1 642E00700 TRANSVERSE/DIAGONAL LINE, TYPE 1 | 383 FT | $2.25 | $3.00 | $2.25 | $3.00 |
| AA1 642E01300 LANE ARROW, TYPE 1 | 16 EACH | $55.00 | $45.00 | $55.00 | $45.00 |
| AA1 642E01400 WORD ON PAVEMENT, 72", TYPE 1 | 7 EACH | $65.00 | $175 | $65.00 | $175 |
| 614E12460 WORK ZONE MARKING SIGN | 42 EACH | $50.00 | $50.00 | $50.00 | $50.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 25 CY | $115 | $235 | $75.00 | $220 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 1,670 FT | $0.50 | $0.50 | $0.60 | $0.50 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 432 FT | $2.90 | $2.90 | $2.55 | $2.90 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,500 | $5,000 | $8,000 | $7,000 |
| 619E16010 FIELD OFFICE, TYPE B | 2 MNTH | $2,000 | $2,000 | $1,500 | $2,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 3,689 CY | $135 | $498k | 53% |
| 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA | 700 CY | $165 | $116k | 12% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.50 inch) | 86,847 SY | $1 | $87k | 9% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $52,500 | $53k | 6% |
| 617E10100 COMPACTED AGGREGATE | 376 CY | $65.44 | $25k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20k | 2% |
| 407E20000 NON-TRACKING TACK COAT | 7,054 GAL | $2.5 | $18k | 2% |
| 408E10001 PRIME COAT, AS PER PLAN | 4,354 GAL | $3.5 | $15k | 2% |
| 623E39500 MONUMENT BOX ADJUSTED TO GRADE | 18 EACH | $800 | $14k | 2% |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 9.2 MILE | $975 | $9k | 1% |