ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 59 more items below.
| Item | Quantity | R1Digioia-suburban Excavating LLC | R2Adena Corporation | R3Fabrizi Trucking & Paving CO INC | R4Eclipse CO LLC | R5Lockhart Concrete CO | R6Stanley Miller Construction Company | R7Shelly & Sands INC | R8Tri-mor CORP | R9S E T INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 611E95600 12' X 4' CONDUIT, TYPE A, 706.05 | 75 FT | $893 | $1,214 | $1,365 | $1,196 | $1,550 | $1,643 | $1,410 | $1,125 | $2,416 | 20% |
| 511E46001 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 64 SY | $825 | $466 |
| Item | Quantity | R1Digioia-suburban Excavating LLC | R2Adena Corporation | R3Fabrizi Trucking & Paving CO INC | R4Eclipse CO LLC | R5Lockhart Concrete CO | R6Stanley Miller Construction Company | R7Shelly & Sands INC | R8Tri-mor CORP | R9S E T INC |
|---|---|---|---|---|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 22 SY | $11.75 | $12.01 | $14.00 | $53.50 | $20.00 | $22.00 | $20.00 | $12.00 | $20.00 |
| 202E23500 WEARING COURSE REMOVED | 180 SY | $9.75 | $11.82 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $370 |
| $562 |
| $700 |
| $425 |
| $475 |
| $660 |
| $523 |
| 16% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 36 CY | $850 | $438 | $380 | $556 | $350 | $485 | $440 | $1,055 | $810 | 9% |
| 517E75120 RAILING (CONCRETE PARAPET WITH TWIN STEEL TUBE RAI | 37 FT | $560 | $348 | $425 | $371 | $165 | $310 | $380 | $700 | $464 | 6% |
| 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 1 LS | $16,775 | $30,672 | $38,160 | $15,698 | $29,000 | $13,933 | $15,000 | $5,000 | $6,000 | 5% |
| 832E30000 EROSION CONTROL | 16,327 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 5% |
| 601E32000 ROCK CHANNEL PROTECTION, TYPE A WITH FILTER | 83 CY | $160 | $102 | $123 | $86.00 | $110 | $121 | $112 | $45.00 | $82.00 | 4% |
| 638E01901 10" WATER MAIN DUCTILE IRON PIPE ANSI CLASS 52, ME | 157 FT | $82.00 | $103 | $116 | $116 | $125 | $104 | $130 | $225 | $123 | 4% |
| 638E01301 8" WATER MAIN DUCTILE IRON PIPE ANSI CLASS 52, MEC | 141 FT | $76.00 | $107 | $99.00 | $112 | $100 | $87.00 | $119 | $185 | $125 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $10,550 | $7,468 | $28,450 | $14,500 | $21,140 | $21,111 | $20,000 | $12,000 | $19,850 | 3% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 50 CY | $205 | $290 | $250 | $210 | $280 | $278 | $190 | $275 | $275 | 3% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $9,600 | $4,710 | $10,000 | $23,306 | $5,000 | $23,890 | $32,000 | $20,000 | $15,250 | 3% |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 460 FT | $20.50 | $6.09 | $14.00 | $11.00 | $20.00 | $16.20 | $18.00 | $6.00 | $17.00 | 3% |
| 638E98000 WATER WORK, MISC.: FITTINGS FOR USE WITH CLASS 52 | 17 EACH | $547 | $766 | $425 | $828 | $245 | $605 | $523 | $825 | $1,100 | 3% |
| 611E10600 24" CONDUIT, TYPE C | 125 FT | $67.00 | $95.08 | $91.00 | $94.50 | $150 | $97.00 | $84.00 | $150 | $74.00 | 3% |
| 638E08001 10" GATE VALVE AND VALVE BOX, AS PER PLAN | 2 EACH | $3,540 | $3,488 | $4,300 | $2,149 | $1,400 | $2,287 | $1,390 | $3,500 | $2,303 | 2% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 28 CY | $247 | $396 | $340 | $258 | $340 | $378 | $311 | $375 | $374 | 2% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $6,700 | $18,118 | $12,720 | $14,328 | $5,000 | $8,622 | $17,000 | $15,000 | $7,100 | 2% |
| 638E98000 WATER WORK, MISC.: TEMPORARY FLUSHING ASSEMBLY | 2 EACH | $3,300 | $1,631 | $950 | $1,456 | $875 | $1,624 | $3,885 | $1,850 | $920 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $6,465 | $2,769 | $3,000 | $15,500 | $15,000 | $9,345 | $2,000 | $5,300 | $6,000 | 2% |
| $20.00 |
| $4.00 |
| $10.00 |
| $10.50 |
| $20.00 |
| $10.00 |
| $2.00 |
| 202E23900 CONCRETE BASE REMOVED | 180 SY | $15.50 | $7.99 | $16.00 | $20.00 | $20.00 | $16.55 | $14.00 | $15.00 | $14.00 |
| 202E30000 WALK REMOVED | 600 SF | $1.15 | $1.23 | $1.00 | $1.50 | $1.00 | $1.60 | $2.00 | $2.00 | $2.00 |
| 202E58100 CATCH BASIN REMOVED | 3 EACH | $340 | $248 | $200 | $642 | $50.00 | $167 | $420 | $360 | $250 |
| 202E75000 FENCE REMOVED | 80 FT | $5.50 | $2.80 | $5.00 | $6.50 | $10.00 | $3.13 | $10.00 | $8.00 | $4.00 |
| 202E75610 VALVE BOX REMOVED | 4 EACH | $114 | $18.66 | $50.00 | $129 | $50.00 | $56.00 | $168 | $200 | $150 |
| 203E10000 EXCAVATION | 122 CY | $30.00 | $66.09 | $25.00 | $26.00 | $15.00 | $29.00 | $35.00 | $30.00 | $20.00 |
| 203E20000 EMBANKMENT | 24 CY | $9.25 | $72.42 | $12.00 | $28.00 | $30.00 | $45.00 | $12.00 | $65.00 | $30.00 |
| 204E10000 SUBGRADE COMPACTION | 268 SY | $2.50 | $3.69 | $1.50 | $4.00 | $1.00 | $1.00 | $11.00 | $1.00 | $2.00 |
| 204E45000 PROOF ROLLING | 1 HOUR | $150 | $74.67 | $150 | $210 | $100 | $100 | $195 | $150 | $250 |
| 607E98000 FENCE, MISC.:WOOD FENCE | 40 FT | $42.00 | $110 | $75.00 | $124 | $50.00 | $55.00 | $100 | $32.00 | $110 |
| 608E12000 5" CONCRETE WALK | 750 SF | $5.50 | $9.27 | $7.50 | $11.00 | $10.00 | $6.30 | $8.00 | $10.00 | $10.25 |
| 623E38500 MONUMENT ASSEMBLY | 2 EACH | $840 | $1,507 | $650 | $964 | $500 | $1,253 | $1,550 | $1,000 | $650 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 1 EACH | $165 | $304 | $160 | $519 | $100 | $400 | $268 | $150 | $300 |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $6,100 | $4,943 | $5,500 | $6,248 | $1,000 | $7,261 | $6,300 | $7,500 | $8,610 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $150 | $100 | $175 | $105 | $200 | $100 | $75.00 | $100 | $250 |
| 659E00300 TOPSOIL | 50 CY | $55.00 | $75.66 | $65.00 | $46.00 | $40.00 | $39.00 | $66.02 | $45.00 | $70.00 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 448 SY | $1.25 | $2.64 | $2.25 | $7.50 | $2.00 | $5.50 | $8.00 | $3.00 | $8.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 22 SY | $27.00 | $1.00 | $2.00 | $7.50 | $2.00 | $1.00 | $1.00 | $2.00 | $1.10 |
| 659E15000 INTER-SEEDING | 22 SY | $2.00 | $1.00 | $2.00 | $7.50 | $2.00 | $1.00 | $1.00 | $2.00 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.06 TON | $545 | $1,723 | $650 | $641 | $700 | $600 | $763 | $800 | $800 |
| 659E31000 LIME | 0.09 ACRE | $46.00 | $932 | $200 | $79.00 | $500 | $500 | $85.00 | $500 | $100 |
| 659E35000 WATER | 2 MGAL | $975 | $1.00 | $10.00 | $1.00 | $50.00 | $1.00 | $1.00 | $100 | $1.10 |
| 611E02000 8" CONDUIT, TYPE C | 16 FT | $213 | $54.67 | $30.00 | $146 | $45.00 | $31.00 | $76.00 | $45.00 | $78.00 |
| 611E06100 15" CONDUIT, TYPE C | 4 FT | $267 | $94.78 | $50.00 | $171 | $100 | $125 | $191 | $90.00 | $120 |
| 611E07400 18" CONDUIT, TYPE B | 41 FT | $90.00 | $125 | $100 | $97.00 | $110 | $138 | $98.00 | $100 | $82.00 |
| 611E07600 18" CONDUIT, TYPE C | 14 FT | $127 | $52.52 | $75.00 | $207 | $110 | $138 | $101 | $150 | $78.00 |
| 611E97300 CONDUIT, MISC.: SUPPORT OF SANITARY SEWER | 1 LS | $2,000 | $2,045 | $2,500 | $2,692 | $1,000 | $3,666 | $4,940 | $2,500 | $3,000 |
| 611E98470 CATCH BASIN, NO. 2-2B | 1 EACH | $1,905 | $1,683 | $2,360 | $2,207 | $1,500 | $1,533 | $2,350 | $2,500 | $1,711 |
| 611E98510 CATCH BASIN, NO. 2-3 | 2 EACH | $2,190 | $2,391 | $2,680 | $2,458 | $2,000 | $1,534 | $2,500 | $3,000 | $2,511 |
| 611E99574 MANHOLE, NO. 3 | 2 EACH | $2,730 | $2,592 | $4,150 | $3,408 | $3,000 | $2,834 | $3,147 | $3,500 | $2,154 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1 1/2" AVG. | 219 SY | $10.00 | $23.65 | $20.00 | $9.50 | $9.00 | $22.25 | $44.00 | $25.00 | $22.00 |
| 304E20000 AGGREGATE BASE | 39 CY | $64.00 | $140 | $75.00 | $67.00 | $42.00 | $199 | $120 | $70.00 | $72.00 |
| 407E10000 TACK COAT | 47 GAL | $5.50 | $8.92 | $5.00 | $5.50 | $3.00 | $5.55 | $2.00 | $6.00 | $6.00 |
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 22 SY | $80.00 | $150 | $85.00 | $91.00 | $90.00 | $84.00 | $193 | $75.00 | $95.00 |
| 638E04900 1" COPPER SERVICE BRANCH | 30 FT | $97.00 | $25.27 | $45.00 | $65.00 | $40.00 | $24.00 | $66.00 | $70.00 | $27.00 |
| 638E07901 8" GATE VALVE AND VALVE BOX, AS PER PLAN | 2 EACH | $2,990 | $2,592 | $3,750 | $1,637 | $1,000 | $1,496 | $1,345 | $2,500 | $1,634 |
| 638E20912 SPECIAL - 1" CURB VALVE AND BOX , CITY OF MEDINA S | 1 EACH | $358 | $419 | $325 | $824 | $750 | $721 | $630 | $1,800 | $562 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 33 FT | $11.75 | $13.49 | $13.00 | $12.00 | $15.00 | $13.00 | $20.00 | $13.00 | $22.00 |
| 630E80100 SIGN, FLAT SHEET | 1 SF | $157 | $179 | $200 | $26.50 | $30.00 | $173 | $35.00 | $28.00 | $50.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 5 EACH | $95.50 | $109 | $102 | $20.50 | $184 | $105 | $63.00 | $22.00 | $100 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 3 EACH | $160 | $24.89 | $170 | $18.00 | $35.00 | $175 | $11.00 | $20.00 | $15.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.06 MILE | $9,875 | $11,236 | $10,570 | $23,022 | $17,000 | $10,867 | $10,000 | $10,800 | $11,000 |
| 642E00300 CENTER LINE, TYPE 1 | 0.03 MILE | $19,755 | $22,472 | $21,125 | $23,174 | $32,000 | $21,733 | $10,000 | $21,500 | $22,000 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 16 HOUR | $60.00 | $75.39 | $65.00 | $68.50 | $50.00 | $75.00 | $69.00 | $75.00 | $65.00 |
| 614E12420 DETOUR SIGNING | 1 LS | $5,900 | $6,859 | $6,500 | $4,248 | $10,000 | $6,489 | $4,250 | $5,500 | $7,500 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 6 SNMT | $900 | $1,059 | $975 | $1,103 | $1,000 | $1,000 | $794 | $1,200 | $1,000 |
| 616E10000 WATER | 1 MGAL | $1,440 | $1.00 | $20.00 | $116 | $50.00 | $1.00 | $352 | $100 | $10.00 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 2,972 LB | $2.00 | $1.32 | $1.90 | $2.50 | $1.00 | $1.50 | $2.00 | $2.00 | $3.00 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 76 SY | $45.00 | $21.76 | $10.00 | $12.50 | $5.00 | $24.00 | $26.00 | $50.00 | $33.00 |
| 512E33000 TYPE 2 WATERPROOFING | 229 SY | $20.00 | $15.47 | $30.00 | $15.00 | $25.00 | $16.00 | $19.00 | $25.00 | $66.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 52 SF | $5.00 | $3.64 | $6.00 | $6.50 | $4.00 | $1.80 | $1.00 | $5.00 | $7.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 26 CY | $91.00 | $163 | $75.00 | $90.00 | $50.00 | $237 | $120 | $90.00 | $75.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 20 FT | $35.00 | $12.35 | $20.00 | $29.00 | $10.00 | $8.00 | $9.00 | $16.50 | $16.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 12 FT | $50.00 | $20.58 | $20.00 | $40.50 | $12.00 | $4.00 | $14.00 | $32.00 | $21.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,000 | $4,331 | $3,500 | $15,000 | $19,000 | $6,000 | $3,000 | $8,000 | $8,000 |
| 619E16000 FIELD OFFICE, TYPE A | 6 MNTH | $1,000 | $574 | $2,000 | $500 | $400 | $1,100 | $2,990 | $2,000 | $500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $4,500 | $3,890 | $4,500 | $12,514 | $17,000 | $18,055 | $8,500 | $4,000 | $5,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E95600 12' X 4' CONDUIT, TYPE A, 706.05 | 75 FT | $893 | $67k | 15% |
| 511E46001 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 64 SY | $825 | $53k | 12% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 36 CY | $850 | $31k | 7% |
| 517E75120 RAILING (CONCRETE PARAPET WITH TWIN STEEL TUBE RAI | 37 FT | $560 | $21k | 5% |
| 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 1 LS | $16,775 | $17k | 4% |
| 832E30000 EROSION CONTROL | 16,327 EACH | $1 | $16k | 4% |
| 601E32000 ROCK CHANNEL PROTECTION, TYPE A WITH FILTER | 83 CY | $160 | $13k | 3% |
| 638E01901 10" WATER MAIN DUCTILE IRON PIPE ANSI CLASS 52, ME | 157 FT | $82 | $13k | 3% |
| 638E01301 8" WATER MAIN DUCTILE IRON PIPE ANSI CLASS 52, MEC | 141 FT | $76 | $11k | 2% |
| 624E10000 MOBILIZATION | 1 LS | $10,550 | $11k | 2% |