BEL-SR 147-10.40, BEL-SR 149-22.91
BEL County · est $0.3M
Bid dateThursday, May 7—
BEL County · est $0.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 1.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 5 more items below.
| Item | Quantity | R1Stanley Miller Construction Company | R2J & J Bridge Company INC | R3Ohio-west Virginia Excavating CO | R4Amaazz Construction Ohio LLC | R5Marra Services INC | R6Eclipse CO LLC | R7R C Construction Company And Son | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 611E97400 CONDUIT, MISC.:CURED-IN-PLACE PIPE LINER | 256 FT | $336 | $302 | $320 | $370 | — | $491 | $395 | 42% |
| 611E96550 FIELD PAVING OF EXISTING PIPE, 108" CMP | 164 FT | $102 | $250 | $165 | $160 | $210 | $97.00 | $295 | 8% |
| Item | Quantity | R1Stanley Miller Construction Company | R2J & J Bridge Company INC | R3Ohio-west Virginia Excavating CO | R4Amaazz Construction Ohio LLC | R5Marra Services INC | R6Eclipse CO LLC | R7R C Construction Company And Son |
|---|---|---|---|---|---|---|---|---|
| 202E75000 FENCE REMOVED | 120 FT | $1.70 | $3.00 | $4.00 | $5.00 | $5.00 | $11.50 | $20.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 130 SY | $1.00 | $0.50 | $3.00 | $2.15 | $2.00 | $2.00 | $0.20 |
| 659E31000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1 LS |
| $15,000 |
| $6,200 |
| $10,000 |
| $13,000 |
| $7,500 |
| $34,698 |
| $15,000 |
| 7% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $11,467 | $13,000 | $9,000 | $14,000 | $2,500 | $38,518 | $35,000 | 6% |
| 202E70120 SPECIAL - PIPE CLEANOUT, 27" TO 48" | 256 FT | $43.00 | $38.00 | $50.00 | $69.00 | $30.00 | $98.00 | $200 | 5% |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 5% |
| 659E10000 SEEDING AND MULCHING | 2,600 SY | $3.18 | $0.50 | $2.00 | $2.15 | $3.00 | $2.00 | $10.00 | 4% |
| 659E00300 TOPSOIL | 288 CY | $25.00 | $3.00 | $35.00 | $23.00 | $30.00 | $46.00 | $20.00 | 3% |
| 601E32010 ROCK CHANNEL PROTECTION, TYPE A WITH AGGREGATE FIL | 53 CY | $129 | $131 | $150 | $131 | $200 | $100 | $175 | 3% |
| 202E70130 SPECIAL - PIPE CLEANOUT OVER 48" | 164 FT | $40.50 | $125 | $15.00 | $75.00 | $40.00 | $83.00 | $200 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $5,223 | $15,000 | $16,500 | $13,700 | $7,000 | $17,000 | $30,000 | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,222 | $100 | $6,000 | $2,800 | $500 | $8,500 | $10,000 | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $4,334 | $1,000 | $5,000 | $5,203 | $8,000 | $4,509 | $3,500 | 2% |
| 619E16000 FIELD OFFICE, TYPE A | 3 MNTH | $1,111 | $500 | $650 | $2,600 | $250 | $400 | $100 | 2% |
| 601E11000 RIPRAP, TYPE D | 4 SY | $722 | $400 | $245 | $545 | $250 | $368 | $275 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,700 | $8,000 | $10,000 | $2,865 | $5,000 | $14,000 | $16,500 | 1% |
| 601E32110 ROCK CHANNEL PROTECTION, TYPE B WITH AGGREGATE FIL | 8 CY | $232 | $152 | $170 | $163 | $350 | $112 | $175 | 1% |
| 614E12200 SPECIAL - WORK ZONE GUARDRAIL | 100 FT | $17.00 | $10.00 | $35.00 | $36.00 | $50.00 | $64.50 | $75.00 | 1% |
| 659E00100 SOIL ANALYSIS TEST | 4 EACH | $100 | $25.00 | $250 | $77.00 | $300 | $79.00 | $10.00 | 0% |
| 659E20000 COMMERCIAL FERTILIZER | 0.38 TON | $800 | $700 | $1,000 | $645 | $1,000 | $636 | $1,200 | 0% |
| 0.54 ACRE |
| $75.00 |
| $500 |
| $400 |
| $72.50 |
| $300 |
| $73.50 |
| $800 |
| 659E35000 WATER | 14 MGAL | $1.00 | $1.00 | $10.00 | $1.00 | $5.00 | $1.00 | $1.00 |
| 833E10000 CONDUIT RENEWAL USING SPRAY APPLIED STRUCTURAL LIN | 256 FT | — | — | — | — | $590 | — | — |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E97400 CONDUIT, MISC.:CURED-IN-PLACE PIPE LINER | 256 FT | $336 | $86k | 41% |
| 611E96550 FIELD PAVING OF EXISTING PIPE, 108" CMP | 164 FT | $102 | $17k | 8% |
| 624E10000 MOBILIZATION | 1 LS | $15,000 | $15k | 7% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $11,467 | $11k | 6% |
| 202E70120 SPECIAL - PIPE CLEANOUT, 27" TO 48" | 256 FT | $43 | $11k | 5% |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1 | $10k | 5% |
| 659E10000 SEEDING AND MULCHING | 2,600 SY | $3.18 | $8k | 4% |
| 659E00300 TOPSOIL | 288 CY | $25 | $7k | 3% |
| 601E32010 ROCK CHANNEL PROTECTION, TYPE A WITH AGGREGATE FIL | 53 CY | $129 | $7k | 3% |
| 202E70130 SPECIAL - PIPE CLEANOUT OVER 48" | 164 FT | $40.5 | $7k | 3% |